Filfirst Concrete Innovations Incorporated - FFCII

Filfirst Concrete Innovations Incorporated - FFCII

Share

50 YEARS OF CONSTRUCTION EXPERIENCE FILFIRST CONCRETE INNOVATIONS INCORPORATED (FFCII)

is the precast entity of FREY-FIL CORPORATION.

FFCII has its main office and plant in Baras Rizal Philippines and other plants in Calumpit Bulacan & Norzagaray Bulacan. Our experiences came from FREY-FIL CORPORATION which was established in year 1975. We have almost five decades of experiences for Construction specialized in Precast and Post Tensioning method. We concentrate in bringing innovative Construction to our clients. Our goal is to pr

Photos from Filfirst Concrete Innovations Incorporated - FFCII's post 29/05/2026

Spreading Smiles and Supporting Futures: Filfirst’s School Supplies Distribution Drive

At the heart of every strong community is the power to uplift one another. Through our School Supplies Distribution Drive held last May 22, 2026, we proudly extended support to the children of our hardworking construction workers by providing essential school materials for the upcoming school year.

More than just bags and notebooks, this initiative represented hope, encouragement, and our shared commitment to education and family welfare. The day became even more memorable with smiles, laughter, and special treats enjoyed by the children.

For our employees, the event was a meaningful reminder that even small acts of kindness can create lasting impact. Seeing the joy on the children’s faces made every effort worthwhile.

As part of our continuing CSR commitment, we look forward to bringing more programs that inspire, support, and strengthen the communities we serve — from feeding programs to future family-centered activities.

Together, we continue building not only structures, but brighter futures.

Photos from Filfirst Concrete Innovations Incorporated - FFCII's post 28/05/2026

The 2026 Tatak Pinoy Expo was a blast! 💥

We would like to thank everyone who took the time to visit and talk to us during the 3-day event.

We look forward to seeing you in the coming events!

For now, you may visit our website at filfirst.com.ph or you may send us a direct message for your inquiries.

Photos from Filfirst Concrete Innovations Incorporated - FFCII's post 27/05/2026

This is it! Today is the last day of the 2026 Tatak Pinoy Expo. Join us in celebrating Filipino pioneers and innovators in their respective fields of expertise.

Experience the solutions that will shape the future of our nation.

26/05/2026

Discover Filipino Ingenuity and Innovation

We're ready for Day 2!

Come and visit our booth here at the 2026 Tatak Pinoy Expo at Hall 4 SMX Convention Center Manila from 10 AM to 5 PM.

25/05/2026

Celebrate Filipino Innovation here at the 2026 Tatak Pinoy Expo from May 25 to 27 at Hall 4, SMX Convention Center Manila.

Let's build a better future for the Filipino.

23/05/2026

The Cavite–Laguna Expressway (CALAX) is one of the country’s major infrastructure developments designed to improve connectivity, reduce travel time, and support economic growth across Cavite and Laguna. As a vital transport corridor, CALAX enhances mobility for businesses, communities, and motorists while helping decongest major road networks in Southern Luzon.

Supporting this transformative project are high-quality precast components engineered for strength, efficiency, and long-term performance—including AASHTO Girders manufactured by Filfirst Concrete Innovation Inc. Designed to carry heavy loads across long spans, these girders play a critical role in ensuring the structural reliability and accelerated construction of modern expressway infrastructure.

Through precision manufacturing and engineering excellence, Filfirst continues to contribute to projects that drive national progress—building infrastructure that connects people, opportunities, and the future.

Precision Built. Innovation Driven. Legacy Defined.

20/05/2026

Precast Excellence in Every Girder

Strength, precision, and performance—AASHTO Girders are engineered to support large-scale infrastructure with unmatched durability and efficiency. From bridges to transport corridors, these precast solutions deliver faster installation, consistent quality, and long-term structural reliability.

At Filfirst, we manufacture high-quality AASHTO Girders built to meet the demands of modern Philippine infrastructure—where every span matters.

Precision Built. Innovation Driven. Legacy Defined.

Photos from DTI Tatak Pinoy's post 20/05/2026

As part of the Frey-Fil Corporation family, we are proud to see our affiliate, Filmetrics Corporation, participate in the 2026 Tatak Pinoy Expo.
Recognized as one of the country’s premier business solutions providers, Filmetrics continues to empower companies through innovative biometric technology, mobile systems, and data analytics solutions designed to help businesses maximize efficiency, security, and operational performance.

Experience LILO—Filmetrics’ smart attendance solution—live at the SMX Convention Center Manila from May 25–27, 2026, and discover how smarter workforce management can transform the way your company operates.

Visit their booth and see what the future of business solutions can do for you.

Photos from DTI Tatak Pinoy's post 19/05/2026

For 51 years, we have remained committed to building a stronger future for Philippine infrastructure through world-class precast solutions engineered with Filipino excellence. Today, as one of the country’s trusted leaders in the industry, we continue to push local innovation forward—creating products built to meet the demands of modern development.

We invite entrepreneurs, developers, contractors, project owners, and industry leaders to join us at the upcoming 2026 Tatak Pinoy Expo on May 25–27 at the SMX Convention Center Manila.

Discover proudly Filipino-made, world-class construction and infrastructure solutions designed to help shape the future of the Philippines. Let’s build smarter, stronger, and greater—together.

08/05/2026

Engineering the Nation with World-Class Precast Manufacturing 🌏🏗

Proudly standing as one of Filfirst’s three major precast manufacturing plants, our Baras, Rizal facility reflects the scale, precision, and capability behind the country’s growing infrastructure landscape.

Spanning 13 hectares with room for future expansion, the plant is designed for efficient large-scale production — with 70% of the property dedicated to storage, logistics, and streamlined operations.

From precast tunnel linings, girders, and train track sleepers to slabs, beams, culverts, barriers, and wall panels, every component is produced with strict quality standards and engineering precision to support critical infrastructure projects nationwide.

Built with complete safety systems including fire extinguishers, designated evacuation areas, and operational safety protocols, the facility is engineered not only for productivity — but for people.

At Filfirst, precast manufacturing goes beyond production.
It is a commitment to innovation, reliability, and nation-building at scale.

Precision Built. Innovation Driven. Legacy Defined.

Want your business to be the top-listed Contractor in Baras?
Click here to claim your Sponsored Listing.

Address


Sitio Kapatagan Brgy. Pinugay
Baras
1970

Opening Hours

Monday 9am - 7pm
Tuesday 9am - 7pm
Wednesday 9am - 7pm
Thursday 9am - 7pm
Friday 9am - 6pm