AJR Contracting
AJR Contracting specialise in excavation, site preparation, house/shed pads, driveways and much more. https://www.ajrcontracting.online
Get in touch today to see of we can help you with your project.
16/12/2024
Some more from the recents folder. Trenching for some new irrigation pipes that are being installed 💦
11/12/2024
Another project completed recently using recycled metal. We used 20/40 recycled concrete drainage metal for a new effluent line being replaced in a residential property.
02/12/2024
Recent job we did using GAP20 recycled metal. Recycled metal is sustainable, cuts the price of the job in half and still gives a great finish 🤩
We love using recycled metal and drainage on various projects as it is super versatile and has such a range of benefits
11/11/2024
Take a look at a cattle race we cleared, graded and topped with p.metal for a nice light finish. This metal provides a smooth solid base whilst being aesthetically pleasing ☀️
30/10/2024
Our combination of an SVL-75 and 8 wheeler Volvo truck allows us to efficiently complete a wide range of projects, regardless of magnitude.
We also have access to other machines for a various scope of work.
22/10/2024
Here are a couple of building pads we were involved with a little while ago. Pad #1 was for an old hall to be relocated on to site. Pad #2 was for some new classrooms to be built.
16/10/2024
We can now offer all services from start to finish. Right from the ground works to concrete, building and landscaping. To save all the fuss of dealing with multiple contractors for your project, call AJR for your one stop shop.
📞 0279170933
📸 Foundations for a pole shed that is currently being built by AJR.
14/10/2024
It has been a minute but we are back on Facebook. Check out this finished job from a while back, and keep an eye out for updates on all the other cool projects we've accomplished since then!
25/01/2022
Biggest project completed to date. Over 7km of golf cart pathways formed at the new Tieke Golf Estate (aka the old Lochiel Golf Course). The paths were all formed with recycled crushed concrete used from the demolition of the old clubhouse and then a mix of lime fines + sand was used to dress the top giving it more of a natural finish. The project was completed over a 2.5 year period. If you play golf make sure you go and check the new course out otherwise head down for a coffee at the new cafe!
08/02/2021
Happy Waitangi weekend!! Thought we better give the Kubota the weekend off work. 😆
30/12/2020
2020 what a year!! Here are a few photos of some of the jobs that were completed over the past year. Thanks to everyone that has supported us over this time. Hope everyone has a safe and happy new year 🥳. Bring on 2021 🙌🙌
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Address
36 Airport Road
Hamilton
3282