HR Group
Elysian is now under construction. Visit the Display Suite at 114 St Georges Bay Road, Parnell.
14/05/2026
Elysian’s full material palette is complete. Visit the Display Suite and see what has been built for you.
Materials sourced from Oman, Italy, and Germany. Stone, timber, bronze, and marble. The layers that will shape life inside the building for decades to come.
Open daily, 11am – 3pm
114 St Georges Bay Road, Parnell
Or by appointment. Link in bio.
Architecture:
Interior Design:
Marble: .truestones
Flooring:
Bathware: .flaminia
Kitchens:
Waverley Commons by HR Group. Coming soon.
A defining new addition to Auckland’s skyline, positioned at the core of the city’s education precinct.
Built for the next generation and set to lead its class. A new benchmark for student accommodation.
Great to host members of on site at Elysian last month.
As an organisation focused on lifting standards across New Zealand’s built environment, it was a pleasure to share progress and the thinking behind NZ’s most ambitious residential building. Big thanks also to for bringing the visit together.
Elysian Site Update: Set in Stone
Façade works are now well underway at Elysian.
In this update, we’re on site with Peter Raimondo of Oculus Building Science and Façades, alongside Mark Chee from Terraform Synergy, whose team is installing the building’s stone rainscreen system.
The façade brings together a full performance-led build-up which includes thermally broken joinery, ventilated cavities, and layered membrane systems. It's all designed to manage moisture, improve thermal performance, and ensure long-term durability in a harbourside environment.
A heavy duty rail system sets the alignment before each stone panel is installed with zero tolerances. It’s a precise, methodical process that forms Elysian's stunning Omani marble exterior.
With installation now progressing, the building is starting to take on its final form ahead of completion in Q4 2026.
Follow HRG for more project milestones.
Developer: HR Group
Architect: Crosson Architects
Builder: Kalmar Construction
Project Manager: Colliers Project Leaders
Structural: BGT Structures
Façade Engineer: Oculus Building Science and Facades
Marble Façade Supplier: SlabCo
Marble Façade Installation: Terraform Synergy
Aluminium Cladding: Flashclad
External Joinery: Starke Façades
HVAC Installation: Air Mark Group
HVAC Supplier: Mitsubishi Electric NZ (BDT)
Fire Engineer: Jensen Hughes Pacific
23/04/2026
HR Group is pleased to welcome Rita Haagner as Elysian’s Sales Executive.
Rita brings decades of experience and a calm, considered approach to the sales process. She’s already working closely with buyers and agents, and will be a key part of the project through to completion.
If you’re revisiting Elysian, you’ll likely hear from her soon.
Elysian x Flaminia. Made Where It Matters.
For this instalment of Elite Journeys, we travelled to Civita Castellana, Italy. The historic heart of Italian ceramics and home to Flaminia.
Every Flaminia piece is made here. Formed and finished in one place, by people who have been working with ceramic for generations.
Across more than 70 years, the company has continued to evolve. Pushing material innovation and refining production techniques. Design is the first conversation, but longevity and precision sit just beneath.
For Elysian, Flaminia was a natural fit. A project defined by restraint, longevity and detail, matched with a manufacturer that thinks in decades.
Made with very special thanks to our friends at .flaminia and local partners
30/01/2026
Structure complete, fit-out underway.
This is momentum. This is Elysian.
nz | | | Kalmar Construction Limited | | BGT Structures |
Structure complete. Halfway to the finish.
In December, we paused the tools to acknowledge the collective effort behind Elysian. With on the roof, in hand and the whole team of HR Group, , Kalmar, , consultants and subbies, we took stock of 2025.
Standing on the Level 5 slab at 25 Balfour Road, Elysian is no longer just a render. The heavy lifting is done and the home stretch to Q4 2026 starts now.
25/12/2025
Closing out 2025 with real momentum at Elysian.
A sincere thank you to everyone behind the project: our consultants, subcontractors and partners. And of course to our purchasers and followers for the confidence and support.
Wishing you all a very Merry Christmas from HR Group.
Elysian x Gaggenau. From the Black Forest to Balfour Road.
For this instalment of Elite Journeys we travelled to Gaggenau’s factory in Lipsheim to see where Elysian’s appliances are made and meet the people behind them. A group of designers and engineers who think in tolerances of millimetres and decades of use.
Handleless ovens that open with a tap, side-hinged doors that let you cook like a chef, controls that land with the same resistance every time. The precision required for HR Group to choose Gaggenau as the anchor of Elysian’s kitchens.
In homes like these, real luxury is when the equipment disappears and all that’s left is heat, light, and the feeling that everything is exactly as it should be.
Made with very special thanks to our friends at and BSH Home Appliances Australia
Click here to claim your Sponsored Listing.
Category
Website
Address
114 Saint Georges Bay Road, Parnell
Auckland
1052
Opening Hours
| Monday | 10am - 4pm |
| Tuesday | 10am - 4pm |
| Wednesday | 10am - 4pm |
| Thursday | 10am - 4pm |
| Friday | 10am - 4pm |
| Saturday | 11am - 3pm |
| Sunday | 11am - 3pm |