Screwtech Engineering Nigeria Ltd
Screwtech Engineering Nigeria LTD is an authorized distributor of Chicago Pneumatic and Worthington Products range in Nigeria. Pumps and Spare Parts.
Compressors, Tools and Spare Parts. Generators and Spare Parts. LUXMAN all in one integrated Solar Light
ARTEMIS 2 LUNAR FLYBY.
The Artemis 2 mission is the first crewed flight of NASA's Artemis program, sending four astronauts on a 10-day journey around the Moon to test the integrated Space Launch System (SLS) and Orion spacecraft.
Mission:
Primary Target: A Lunar Flyby at a closest approach of approximately 4,600 to 6,400 miles (7,400 to 10,300 km) from the Moon's surface.
Lunar Far Side: Astronauts will be the first humans to see the lunar far side in person since 1972, taking high-resolution photos and scientific data.
Testing Goals:
Verify life support, communication, and navigation systems in deep space.
Demonstrate proximity operations (maneuvering near the spent upper stage).
Validate the Orion heat shield performance during high-speed reentry.
This will be a preparatory mission to Artemis 3 and 4 in 2028 for human mission to the moon and mars.
Flight Statistics:
Total Flight Distance: Approximately 1.4 million miles (2.25 million km) for the entire mission.
Max Distance from Earth: Roughly 252,799 miles (406,841 km), surpassing the record set by Apollo 13.
Top Launch Speed: Approximately 24,500 mph (39,430 km/h) or Mach 33 during ascent.
Reentry Speed: Enters Earth's atmosphere at approximately 25,000 mph (40,000 km/h), the fastest ever for a crewed vehicle.
Spacecraft Propulsion & Power:
Liftoff Thrust: Produces 8.8 million pounds of thrust.
Engine Configuration:
Core Stage: Four RS-25 liquid propellant engines (upgraded Space Shuttle main engines).
Boosters: Two five-segment Solid Rocket Boosters (SRBs), providing 75% of initial launch thrust.
Upper Stage (ICPS): One RL10 engine with 24,750 lbs of thrust for orbital maneuvers.
Orion Service Module: Features 33 engines (1 main, 8 auxiliary, 24 thrusters) for steering and lunar trajectory.
Engine Capacity (Fuel):
Core Stage: Burns over 700,000 gallons (2.6 million liters) of liquid hydrogen and liquid oxygen.
Orion: Carries 19,000 pounds of usable steering propellant.
Power Generation: Orion uses four solar array wings spanning 62 feet to generate electrical power.
Visuals Credit Maze.
REDUCING DOWNTIME IN PLANTS AND REFINERIES :
Reducing downtime in refineries and production plants isn’t about one “silver bullet”—it’s about tightening multiple weak links across maintenance, operations, and planning. In real plants, the biggest gains come from practical, disciplined ex*****on rather than expensive technology alone.
Here are proven, field-tested strategies that actually work:
https://screwtechng.com/reducing-downtime-in-plants-and-refineries-practical-strategies-that-work?fbclid=IwdGRjcAQ8R2BjbGNrBDxHU2V4dG4DYWVtAjExAHNydGMGYXBwX2lkDDM1MDY4NTUzMTcyOAABHnY1arzBbmXKc9p9N7xB8CFKCrKvVl1L1SOo8NHyWYYp8353eq_LQ-4XXwrN_aem_pOhCtyr4FRrBp6poeJk6P
24/03/2026
https://screwtechng.com/why-pumps-fail-lessons-from-real-field-data
Why Pumps Fail: Lessons from Real Field Data. | Screwtech Engineering Operation and Maintenance
Happy October 1st to all Compatriots.
We salute the courage, patriotism and resilience of all especially our Clients and Customers.
21/08/2023
Air Receivers.
Why Your Compressor System Needs an Air Receiver Air receivers are essential additions to the compressed air system that act as temporary storage to accommodate the system’s peak demand, as well as help optimize the system’s efficiency. These compressor accessories are available in different size ranges, as well as come in either horizontal or...
21/08/2023
Six Reasons why a compressed air system needs centralized controls
https://screwtechngr.com/six-reasons-why-a-compressed-air-system-needs-centralized-controls/ #:~:text=HOME,needs%20centralized%20controls.
Six Reasons why a compressed air system needs centralized controls. When a compressed air system uses more than one compressor or dryer, it can be difficult to determine which machine to run and when. This is especially true if the demand fluctuates daily. If the system isn’t properly controlled, the risk is producing air with large pressure bands, which translate...
28/06/2023
Eid Mubarak.
01/01/2023
We wish you a wonderful new year and hope it brings you many blessings.
01/10/2022
We Celebrate Nigeria.
In Purity
Faith
Peace
And Unity.
09/07/2022
Click here to claim your Sponsored Listing.
Contact the business
Telephone
Website
Address
72/82 Kudirat Abiola Way, Oregun , Ikeja
Lagos
100001
Opening Hours
| Monday | 08:00 - 17:00 |
| Tuesday | 08:00 - 17:00 |
| Wednesday | 08:00 - 17:00 |
| Thursday | 08:00 - 17:00 |
| Friday | 08:00 - 17:00 |