Leo Collins Engineering Ltd.
•ENGINEERS •PROJECT MANAGERS •GENERAL CONTRACTORS
RC:1503845
29/03/2025
1. Design Drawings ✅
2. Site Preparation ✅
3. Cable Installation ✅
4. Testing & Commissioning ✅
5. Final Inspection & Documentation ✅
CONTRACTOR: Leo Collins Engineering Ltd.
ELECTRICAL ENGINEER: Engr Collins Anigbogu
24/03/2025
Somewhere in PortHarcourt City.
PROJECT: Electrical Design and Installation of 50kVA, 11kV/0.415kV Pole Mounted Distribution Substation, with 200meters Overhead Distribution Line.
CONTRACTOR: Leo Collins Engineering Ltd.
ELECTRICAL ENGINEER: Engr Collins Anigbogu
08/02/2025
Did you know? The sun provides more energy in one hour than the world uses in a year! Let’s harness that power with solar energy.
GoSolar ✅
RenewableEnergy✅
LEO COLLINS ENGINEERING LTD✅
08/02/2025
Tired of rising electricity bills,
Switching to solar can save you money every month.
We Design and Install✅
LEO COLLINS ENGINEERING LTD✅
08/02/2025
Do you know that Circuit breakers and electrical cables are mostly underrated during Solar design and installation and they can cause serious problem if poorly managed.
Oversized cables are generally safe but may be costly and difficult to install.
Undersized cables pose serious fire and reliability risks.
Oversized circuit breakers fail to protect the system, while undersized breakers cause unnecessary disruptions.
Always follow electrical codes and conduct load calculations when selecting cables and circuit breakers.
LEO COLLINS ENGINEERING LTD✅
26/01/2025
Completed today.
we still dey active on Designs.
Load Flow Analysis of "300kVA, 33kV/0.415kV distribution substation" and "150MVA 132kV/33kV substation"