Our Civil - / Structural work is coming to an end. 💪🏗🧱
Last up: the internal and external Staircase! 🪜
15/09/2023
A lot has happened in the last month! 💪 All First Floor Brickwork walls are up and we are busy shuttering the Ring Beam! Everything is coming along smoothly 🏠🙂
11/08/2023
The first floor reinforcement arrangement is as good as done and we are looking forward to casting concrete next week! 🙂🙃
28/07/2023
With the Groundfloor Brickwork all done 💪 we can now start with the shuttering and reinforcement for the Down Stand Beams.
22/06/2023
With views like these, who wouldn't enjoy working on this site?! 🤩
Making good progress! 💪
08/06/2023
New Month - new Construction Site!🤩
FEC was appointed as Structural Engineer for a private home on a property outside of Windhoek. 🏠
With the Bulk-Earthworks and the excavation of the foundations done, next up laying of reinforcement and casting of foundation concrete.
15/02/2023
We are making great process at the Industrial Property in Northern Industrial Area. 💪
✅ Firewall to Existing Guard House
✅ Interior changes to Warehouse Offices & Storage
🔜 Finishing of Site Works for new Fire Water Reticulation
➡️ Installation of Smoke Extraction Louvres in existing Steel Doors
07/02/2023
Working on something new...🏗🧱
Alterations and Additions to an Industrial Property in Northern Industrial Area - Windhoek:
- Site Works for new Fire Water Reticulation
- Interior changes to Warehouse Offices & Storage
- Installation of Smoke Extraction Louvres in existing Steel Doors
12/12/2022
Thank you for a great team effort! 💪
13/09/2022
Great news from the Finkenstein Manor Site 🎉 the ringbeams have been cast and the contractors are currently busy installing the roof structure! 💪
18/08/2022
Things are going smoothly on our Finkenstein Manor site! 🤩
Concrete Floors received their saw-cut-joints and all load-bearing walls are up to ringbeam height.
Always exciting when the walls come up, and one gets the feel for the house and rooms!🏠🎉
11/08/2022
A quick update from our site at Finkenstein Manor ☝️:
Joint Tex, Ant/Termite Poisoning, Bottom Layer PVC, Isolation Board and Top Layer PVC have been installed and the concrete floor was cast today 💪🤩