Ace Rig Move Sdn Bhd
Offshore MODU Jack Up Rig Move
Rig Mover Attendance
Anchor Pattern
Rig Move Procedure
Rig Mover Attendance
Develop Rig Move Procedure
Draw Anchor Pattern in ACAD
Location Feasibility Studies for Jack up
Connect Main Tow Wire
Pre Job Safety Meeting prior to Jacking Operation
Disconnect tow wire
Offshore Game
Sitibun Vs Andy Vs Hamizan
In this video, Barge Master Anthony Yeap walks us through a step-by-step installation of an actuator and solenoid on a bulk system valve. With years of offshore experience under his belt, Anthony not only demonstrates technical precision but also shows his genuine passion for mentoring the next generation.
Through clear instructions and hands-on guidance, he ensures that vital operational knowledge is passed down to younger crew members β helping them build the skills and confidence needed to one day take on leadership roles like his.
Whether youβre new to rig operations or looking to sharpen your skills, this video is an invaluable resource.
π Topics Covered:
β’ Overview of actuator and solenoid function
β’ Tools and safety checks
β’ Installation procedure
β’ Final testing and troubleshooting tips
π·ββοΈ Knowledge shared is knowledge preserved. Thank you, Anthony, for inspiring the crew!
Personnel Transfer Basket
HOC Winner
Anchor Handling Vessel
16/04/2026
A moment worth capturing today.
Successfully completed a Jack-Up Drilling Rig move offshore Terengganu, and signed off via fast crew boat with this rare close-up view β less than 5 meters from the rig alongside the platform.
This was one of the more challenging moves, with multiple footprints at the placement area requiring extra care and precision. Having worked in this same location a few years back really helped β understanding the soil behaviour made a big difference in planning and ex*****on.
Grateful for the strong support and teamwork from the OIM and DSV throughout the operation. Smooth coordination made all the difference.
Another safe and successful move in the books. πͺβ
16/04/2026
A moment worth capturing today.
Successfully completed a Jack-Up Drilling Rig move offshore Terengganu, and signed off via fast crew boat with this rare close-up view β less than 5 meters from the rig alongside the platform.
This was one of the more challenging moves, with multiple footprints at the placement area requiring extra care and precision. Having worked in this same location a few years back really helped β understanding the soil behaviour made a big difference in planning and ex*****on.
Grateful for the strong support and teamwork from the OIM and DSV throughout the operation. Smooth coordination made all the difference.
Another safe and successful move in the books. πͺβ
Teamwork SafetyFirst
Arriving Rossukon Platform
Click here to claim your Sponsored Listing.
Category
Contact the business
Website
Address
The Capers
Kuala Lumpur
51000
Opening Hours
| Monday | 09:00 - 17:00 |
| Tuesday | 09:00 - 17:00 |
| Wednesday | 09:00 - 17:00 |
| Thursday | 09:00 - 17:00 |
| Friday | 09:00 - 17:00 |