Fanmount Forwarding
Total Logistic Service Provider in Sabah, Malaysia
02/08/2022
New container depot at Phase 3 POIC Lahad Datu , it shall be completed by November 2022. Stay tune.
15/09/2021
We desire to have good braking system for all of the trucks, in order to minimise incidence of road accidents. For new acquisition of trucks, consideration is given to brake retarder, ABS and other failed safe systems. Imagine the number of trips on the road, most of the fleets are long haul, travelling mountainous terrains. Good braking system can reduce stress on the wheels and tyres.
02/09/2021
All of the staff have already received the first dose of vaccination. Second dose vaccination is in progress. Stay safe and follow SOP to serve esteemed customers.
02/09/2021
Fleet maintenance team consists of electrician, welders and mechanics. Team performs routine maintenance, overhaul of engines, body paint, touch up, and breakdown repair jobs.
01/09/2021
The lives of dedicated drivers: The trucks are their second home. Especially those long distance drivers, one third of their lives were spent on the road. Special thanks to them for their loyalty and dedication for more than 10 years serving Fanmount and the customers.
31/08/2021
Memory Lane September 2019 : Visitation at POIC Containers Port Lahad Datu.
31/08/2021
Early bird.
31/08/2021
Merdeka! Malaysia Day 16th. September 2021
Setia Negaraku A zero-budget patriotic passion project recorded on 13th of May 2018 in four hours,By Malaysians, For Malaysians.Thank you for watching and do share this son...
31/08/2021
Down to memory lane : Fanmount acquired 12 units of Renault prime movers from 2004 to 2010. Their engine capacities ranging from 385 to 420HP. They were good prime movers but spare parts support was an issue, the company started to seek out for other alternative brands such as UD, Hino and CAMC . Because of Sabah poor road conditions, the company still prefers UD prime movers for power, efficient fuel consumption and easily available of spare parts. Since then Renault prime movers have been totally replaced by UD.
30/08/2021
Additional fleet of prime mover 520hp
29/08/2021
2019 when we're having the first delivery of POME to depots.
Click here to claim your Sponsored Listing.
Category
Contact the business
Website
Address
Lot 46 Lorong Durian 1, Kian Yap Industrial Estate
Kota Kinabalu
88450