In Time Control

In Time Control

Compartir

We are specialized in electrical and instrument engineering and construction.

Empezamos nuestra compañía proporcionando servicios de Ingeniería, Procura, Construcción y Comisionamiento en obra eléctrica e instrumentación en la industria del refinamiento del petróleo, y estamos continuamente expandiendo nuestros servicios en áreas como plantas acereras y proyectos de generación de energía eléctrica. A través de nuestro diario perfeccionamiento de nuestra calidad, seguridad y

Photos from In Time Control's post 26/06/2025

The red one ;
Heaviest cable that ITC pulled in his history.
Pirelli Airguard direct burried 15KV EPR 3C x 750 KCM. The weight is 30Kg/meter

The black one ;
Longest cable that ITC pulled in his history.
Piirelli Airguard direct burried 69KV EPR 1C x 500 KCM. ITC pulled 800m in one span without splishing.

ASU Project, 2005 -2006, Atasta Campeche

************

El rojo;
El cable más pesado que ITC ha jalado en su historia.
Pirelli Airguard directamente enterrado 15 kV EPR 3C x 750 KCM. El peso es de 30 kg/metro.

El negro;
El cable más largo que ITC ha jalado en su historia.
Pirelli Airguard directamente enterrado 69 kV EPR 1C x 500 KCM. ITC jaló 800 m en un solo tramo sin empalmes.

Photos from In Time Control's post 03/08/2023

Noticia calientito !
Ganamos Proyecto CCC Riviera Maya
Donde ? Valladolid ciudad de Chichen Itza

14/05/2023

1,000,000 safe hours, horas seguros, 안전 인시.

Gracias a todos colaboradoers de In Time de proyecto Dos Bocas

Photos from In Time Control's post 18/02/2023

What You See is What We Have.
Simulating radial vibration with Bently Nevada TK-3.
Feb. 18, 2023

05/02/2023

Thank you all who involved this Dos Bocas project with us. With all your helps, ITC could move one step closer to our vision.
** To be the most preferred and trusted construction company in Mexico that client always think of **

Gracias a todos los que participaron en este proyecto Dos Bocas. Con toda su ayuda, ITC podría acercarse un paso más a nuestra visión.
** Ser la empresa constructora más preferida y confiable en México que los clientes siempre pueda pensar **

Photos from In Time Control's post 28/08/2021

Memory of a project CCGT Norte-II, Chihuahua Mexico.

See the notes on the cable which was biggest in the project.

******
Personal que este interesado en trabajar en la empresa ITC, favor de ponerse en contacto con nosotros.
[email protected]

29/04/2021

In Time Control is looking for bilingual workers !!

We are looking for bilingual (Spanish-English) workers for the following categories in Tabasco, Mexico.

+ Project control manager, Project scheduler, Document controller,
+ Quality supervisor for electrical and instrument,
+ Safety supervisor, Safety officer, Environmental advisor
+ Material controller
+ Electric engineer, Electrical supervisor, Electrical foreman
+ Instrument engineer, Instrument supervisor, Instrument foreman

If you are interested in working with us, please send us your CV with information that shows us that you are bilingual.

Contact us :
[email protected]
[email protected]
[email protected]
[email protected]

14/02/2021

Factor de Potencia

Por que necesitamos banco de capacitor en sistema electrica ?

** Para adelantar fase de corriente en circuito inductiva para minimzar desfases --> maximizar potencia real

Photos from In Time Control's post 13/01/2021

ISO 9001, 14001 & 45001

We, In Itme Control S.A. de C.V. has been certified ISO since 2013, and recently renewed his certification from TÜV

Nosotros, In Time Control S.A. de C.V. ha sido certificado ISO desde 2013, y recientamente renovó su certificación por TÜV

30/03/2020

Informamos al público en general que recientemente en facebook existe una página falsa de In Time Control, S.A. de C.V. y que por medio de whatsapp están solicitando la contratación de personal a través del siguiente correo falso: [email protected], Al respecto, informamos que NO estamos contratando personal, ni tampoco solicitando depósitos por concepto de contratación, viáticos ni de ningua otra especie.

Photos from In Time Control's post 15/02/2019

New work shop and office are under construction. Feb. 15th, 2019

Photos from In Time Control's post 05/10/2018

Application of alphine hitches for electricians.
Brake hitch and pipe hitch can be used for cable pulling.
**
Aplicación de nudos alpinismo para electricos.
N**o de freno y tubo puede aplicar a jalado de cables

¿Quieres que tu empresa sea el Empresa De Ingeniería mas cotizado en Apodaca?
Haga clic aquí para reclamar su Entrada Patrocinada.

Dirección


Boulevard Milenium 5060 Parque Industrial Milenium
Apodaca
66626

Horario de Apertura

Lunes 8am - 5pm
Martes 8am - 5am
Miércoles 8am - 5am
Jueves 8am - 5pm
Viernes 8am - 5pm
Sábado 8am - 12pm