SY Design Group
CAD Outsourcing Services & Training Centre For Infrastructure (CE), DC (Development Control Plan), BP (Building Plan), Civil & Structural (C&S), Architecture.
Singapore based Organization. Also prepare for Authorities Submission Drawings (LTA/PUB/NParks). ✅SY Design Group ကို ဦးဆောင်သူမှာ BE (Civil) လက်ရှိ စင်ကာပူတွင်အလုပ်လုပ်ကိုင်လျက်ရှိပြီး ရန်ကုန်တွင် RE (Structure) လိုင်စင်က်ု က်ုင်ဆောင်ထားသူဖြစ်ပါတယ်
- B.Arch.ကိုယ်တိုင် Architecture Design ရေးဆွဲပေးခြင်း
- BE (Civil) ကိုယ်တိုင် Structure Design တွက်ချက်ပေးခြင်း
- အိမ်ဆောက်ရင်ကုန်ကျမယ့်စရိတ် Buildi
မင်္ဂလာပါရှင်☘️
𝐂𝐢𝐯𝐢𝐥 𝐄𝐧𝐠𝐢𝐧𝐞𝐞𝐫𝐢𝐧𝐠 𝐃𝐫𝐚𝐟𝐭𝐢𝐧𝐠 ပိုင်းနဲ့ 𝐒𝐢𝐧𝐠𝐚𝐩𝐨𝐫𝐞 မှာအလုပ်လာရောက်လုပ်ကိုင်ချင်တဲ့သူများအတွက် 𝐀𝐮𝐭𝐨𝐂𝐀𝐃 𝟐𝐃 𝐭𝐫𝐚𝐢𝐧𝐢𝐧𝐠 သင်တန်းလေးနဲ့မိတ်ဆက်ပေးချင်ပါတယ်
✅ AutoCAD 2D Commands များ
✅ Preparation for Building RC Structure & Steel Structure
✅ Preparation for BP / DP Plans External Work (Infrastructure)
✅ Preparation for Traffic Plan
✅ Preparation for Submissions to Singapore Authorities (LTA / PUB / NParks)
✅ Prepartion for Topo Survey Drawings
𝐒𝐢𝐧𝐠𝐚𝐩𝐨𝐫𝐞 𝐄𝐱𝐩𝐞𝐫𝐢𝐞𝐧𝐜𝐞 𝟏𝟎 𝐲𝐞𝐚𝐫𝐬 ကျော်မှာကြုံတွေ့ခဲ့ရတဲ့ အလုပ်အတွေ့အကြုံတွေနဲ့ ပေါင်းစပ်ပီးသင်ကြားပေးမှာဖြစ်ပါတယ်ရှင်။ အခုလက်ရှိမှာလည်း 𝐈𝐧𝐟𝐫𝐚𝐬𝐭𝐫𝐮𝐜𝐭𝐮𝐫𝐞 ပိုင်းသီးသန့် 𝐂𝐨𝐧𝐬𝐮𝐥𝐭𝐚𝐧𝐭 တခုမှာလုပ်ကိုင်လျက်ရှိပါတယ်ရှင်
𝐎𝐧𝐞 𝐨𝐧 𝐨𝐧𝐞 သင်ချင်သူများ 𝐆𝐫𝐨𝐮𝐩 နဲ့သင်ချင်
သူများ 𝐏𝐚𝐠𝐞 𝐌𝐞𝐬𝐬𝐞𝐧𝐠𝐞𝐫 မှာဆက်သွယ်မေးမြန်းနိုင်ပါတယ်ရှင်
30/08/2020
✅ SY Design Group မှ ရေးဆွဲပေးထားသော 40' x 60' Fencing Design လေးပါရှင့်💛
အိမ်ဆောက်ချင်လို့ပဲဖြစ်ဖြစ် Decoration ပြင်ချင်လို့ပဲဖြစ်ဖြစ် SY Design Group နဲ့ ဆွေးနွေးဖို့ Chat Box သာဆက်သွယ်လိုက်ပါနော်
Appreciate Our Clients
Design Group
Sweet Home 🏡
29/03/2018
8½ Storeyed (Tarmwe Township)
Analysis & Design with Etab Software!!
11/07/2017
Technological University Building Recreation Center Wave
massive arched roof of Nanyang Technological University's (NTU) new sports hall has taken shape - without a supporting pillar or scaffolding in sight.
conventional buildings, these structural beams are not steel - but specially engineered wood.
of wood are glued together to form glued laminated timber, or glulam, which is much lighter than steel. This allows for a design that does not need supporting pillars.
also speeds up construction. The roof took 3½ weeks to assemble, compared to three months if conventional methods had been used.
The seven roof beams are each composed of 36m-long halves of glulam manufactured in Austria and shipped here. Each half is secured to its respective wall, then hoisted up and secured at the top of the arch, to form the full 72m beam.
Besides glulam, the hall also uses cross-laminated timber. It involves sticking layers of timber together at right angles, to produce solid panels.
The sports hall is the first building in South-east Asia to use engineered wood on such a large scale.
requiring less time and manpower to assemble, engineered wood is also more eco-friendly. It takes 60 times more energy to manufacture 1kg of steel, compared to making 1kg of engineered timber.
Why there isn't any hoarding while demolishing!!!?Dangerous!!!
Click here to claim your Sponsored Listing.
Contact the business
Telephone
Website
Address
Sanchaung
Opening Hours
| Monday | 09:00 - 18:00 |
| Tuesday | 09:00 - 18:00 |
| Wednesday | 09:00 - 18:00 |
| Thursday | 09:00 - 18:00 |
| Friday | 09:00 - 18:00 |