B.tech Civil Engineering Job Update
Civil job update description
সরকারি/বেসামরিক কাজের সিভিল ইঞ্জিনিয়ারিং আপডেট বিবরণ ও আপডেট.
19/11/2023
https://youtu.be/Up_4nW3De5w?si=g7oNOZ_Ug0TfYuID
WBPSC JE CIVIL MOCK INTERVIEW SOIL MECHANICS MOST ASKED QUESTIONS
Wbpsc je Civil Mock Interview | Soil Mechanics Interview Most Asked Questions | Mock interview wbpsc #2023 je 2023 interview questionsWBPSC JE CIVIL MOCK INTERVIEW QUESTIONS AND ANSWERS .WBPSCJE INTERVIEW QUESTIONS FOR EXP...
11/05/2023
11/05/2023
DVC RECRUITMENT CIVIL ENGINEER 2023
11/05/2023
RECRUITMENT 2023
Civil Engineering Job
518 km *Bengaluru - Vijayawada Expressway* project (NH-544G) is a proposed 4-6 lane partially access-controlled highway with a route alignment in Karnataka and Andhra Pradesh.
Total Estimated Cost: *Rs. 19,320 crore*
Project's Approx. Length: *624 km*
Greenfield Section: 332 km (Kodikonda - Addanki)
Lanes: 46
Right of Way: 100m
Design Speed: 120 kmph
Owner: National Highway Authority of India (NHAI)
*_Package & Chainage Contractor_*
*Package 1:* Kodur (Ch. 0.000) to Vanavolu (Ch. 24.300) *Dilip Buildcon* (L1)
*Package 2:* Vanavolu (Ch. 24.300) to Vankarakunta (Ch. 45.700) *Raj Path Infracon* (L1)
*Package 3:* Vankarakunta (Ch. 45.700) to Odulapalle (Ch. 72.000) *Raj Path Infracon* (L1)
*Package 4:* Odulapalle (Ch. 72.000) to Nallacheruvu palli (Ch. 96.300) *Dilip Buildcon*
(L1)
*Package 5:* Nallacheruvu palli (Ch. 96.300) to Yerragudipadu (Ch. 129.000) *MEIL* (L1)
*Package 6:* Yerragudipadu (Ch. 129.000) to Audireddipalle (Ch. 160.000) *MEIL* (L1)
*Package 7:* Audireddipalle (Ch160.000) to Mallapalle (Ch. 176.000) *Dilip Buildcon* (L1)
*Package 8:* Mallapalle (Ch176.000) to Kavulakuntla (Ch196.000) *MEIL* (L1)
*Package 9:* Kavulakuntla (Ch196.000) to Narayanmpet (Ch203.500) *MAX Infra* (L1)
*Package 10:* Narayanmpet (Ch203.500) to
Chandrasekharpuram (Ch228.000) *MEIL* (L1)
*Package 11:* Chandrasekharapuram (Ch.228.000) to Polavaram (Ch. 260.000) *MEIL* (L1)
*Package 12:* Polavaram (Ch. 260.000) to Marripudi (Ch.285.500) *MEIL* (L1)
*Package 13:* Marripudi (Ch. 285.500) to Somavarappadu (Ch.314.600) *KNR Constructions* (L1)
*Package 14:* Somavarappadu (Ch.314.600) to Muppavaram (Ch.343.240) *MEIL* (L1)
Bid Result for Development of Six-Lane Access Controlled Highway from *Gogwan Jalalpur to Ranipur Barsi of Shamli-Ambala* section of Bareilly-Ludhiana EC under BMP Phase-I in the State of Uttar Pradesh *(Package‐1)*.
Client: NHAI
Estimated Cost: 940.39
Length: 45.50
DoTS: 07.07.2022
DoTO: 08.07.2022
DoFO: 29.07.2022
1. Apco- 821
2. DBL- 1130
3. DRA - 864
4. GR Infra- 970.97
5. KRISHNA CONSTELLATION- 846
6. MG Contractors- 978.52
7. MCL- 864
8. PNC- 954
9. Raj Shyama- 819 *L1*
10. RCC Developers- 909
Bid result for Development of 6Lane AC Highway from *Ranipur Barsi Saharanpur dist to Adhoya Musalmana Ambala dist Shamli Ambala* sec of Bareilly Ludhiana EC on EPC under BMP Ph-1 in Haryana *(Pkg‐2)*.
Client: NHAI
Estimated Cost: 859.62
Length: 38.90
DoTS: 07.07.2022
DoTO: 08.07.2022
DoFO: 29.07.2022
1.Apco- 785 *L1*
2. Constructora San Jose S.A.- 799.39
3. GR Infra- 896.87
4.KRISHNA CONSTELLATION- 828
5. MG Contractors- 931.82
6. MCL- 905.04
7.Niyati ENGINEERS AND CONSULTANTS- 911.71
8. PNC- 990
11/05/2023
Engineering
11/05/2023
VACANCY 2023 FOR WEST BENGAL
APPLYING TODAY
Last dat 15-05-2023
Click here to claim your Sponsored Listing.
Category
Contact the school
Address
Jhargram
721505