Must Know isolated Footing Estimation .
Subscribe :https://youtu.be/J8qgb1ExrGA

CivilEngineering

09/05/2026

Sieve Analysis Test According to ASTM | Complete Lab Procedure & Calculation
βœ… ASTM Standard Procedure
βœ… Particle Size Distribution
βœ… Lab Test Step by Step
βœ… Civil Engineering Practical Knowledge

Watch Full VideoπŸ‘‰: https://youtube.com/watch?v=AYh6cZLj434&is=VcaYGJ3Ei-RoR2LE
Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€
Join Telegram for PDF Notes & Civil Engineering Materials:
https://t.me/SmartcivilengineerSCE/4015

Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€Ω€

06/05/2026

How to Perform Field Density Test (FDT) by Sand Cone Method | ASTM D1556 Made Easy Full Guide LinkπŸ‘‰ :https://youtu.be/AYh6cZLj434

.

04/05/2026

Rate Analysis Every Engineer Must Know πŸ‘

SUBSCRIBE:https://youtube.com/watch?v=AYh6cZLj434&is=VcaYGJ3Ei-RoR2LE

02/05/2026

Estimation of 1 km Asphalt Road

1. Given Data / Assumptions

Length (L) = 1000 m
Width (W) = 7 m
Thickness (t) = 0.05 m

Density of asphalt mix = 2.35 t/mΒ³
Bitumen content (OBC) = 5.17%
Wastage = 5%

---

2. Volume of Asphalt Layer

Volume = L Γ— W Γ— t

Volume = 1000 Γ— 7 Γ— 0.05
Volume = 350 mΒ³
---

3. Total Weight of Mix

Weight = Volume Γ— Density

Weight = 350 Γ— 2.35
Weight = 822.5 tons
---

4. Bitumen Quantity

Bitumen = (5.17 / 100) Γ— 822.5

Bitumen = 42.53 tons
---

5. Aggregate Quantity

Aggregate = Total Mix βˆ’ Bitumen

Aggregate = 822.5 βˆ’ 42.53
Aggregate = 779.97 tons
---

6. Add 5% Wastage

Total Mix = 822.5 Γ— 1.05 = 863.6 β‰ˆ 864 tons

Bitumen = 42.53 Γ— 1.05 = 44.66 β‰ˆ 44.7 tons

Aggregate = 779.97 Γ— 1.05 = 818.97 β‰ˆ 819 tons

---

7. Rate Analysis (Example)

Bitumen rate = 700 USD/ton
Aggregate rate = 20 USD/ton
Mixing & laying = 15 USD/ton

---

8. Cost Calculation

Bitumen cost = 44.7 Γ— 700 = 31,290 USD

Aggregate cost = 819 Γ— 20 = 16,380 USD

Mixing & laying cost = 864 Γ— 15 = 12,960 USD

---

9. Total Cost

Total Cost = 31,290 + 16,380 + 12,960

Total Cost = 60,630 USD
---

βœ… Final Answer

For 1 km asphalt road:

Total Mix = 864 tons
Bitumen = 44.7 tons
Aggregate = 819 tons

Total Estimated Cost β‰ˆ 60,630 USD

---

Important Formulas

Volume = L Γ— W Γ— t

Weight = Volume Γ— Density

Bitumen = (% / 100) Γ— Total Mix

Aggregate = Total Mix βˆ’ Bitumen

Wastage = Total Γ— 1.05

---

Join my channel for full PDF notes, BOQ, and civil engineering estimation examples.
Click Link :https://t.me/SmartcivilengineerSCE/4014.

02/05/2026

Reinforcement βœ”
if You Want To share Your Work Send me at Whatsapp Number:+93709967797

Photos from Smart Civil Engineer's post 01/05/2026

Asphalt Mix Design (Marshall Method – MS-2)

1. Given Data

Bitumen grade = 60/70
Aggregate specific gravity (Gsb) = 2.65
Bitumen specific gravity (Gb) = 1.03

Trial bitumen contents (Pb):
4.0%, 4.5%, 5.0%, 5.5%, 6.0%

Compaction = 75 blows per side

---

2. Observations (Example for 5% Bitumen)

Weight in air (Wair) = 1200 g
SSD weight (Wssd) = 1220 g
Weight in water (Wwater) = 700 g

---

3. Bulk Specific Gravity (Gmb)

Formula:

Gmb = Wair / (Wssd βˆ’ Wwater)

Calculation:

Gmb = 1200 / (1220 βˆ’ 700)
Gmb = 1200 / 520
Gmb = 2.31

---

4. Theoretical Maximum Specific Gravity (Gmm)

Formula:

Ps = 100 βˆ’ Pb

Gmm = 100 / [(Pb/Gb) + (Ps/Gsb)]

Calculation:

Pb = 5
Ps = 100 βˆ’ 5 = 95

Gmm = 100 / [(5/1.03) + (95/2.65)]
Gmm = 100 / (4.85 + 35.85)
Gmm = 100 / 40.7
Gmm = 2.46

---

5. Air Voids (Va)

Formula:

Va = [(Gmm βˆ’ Gmb) / Gmm] Γ— 100

Calculation:

Va = [(2.46 βˆ’ 2.31) / 2.46] Γ— 100
Va = (0.15 / 2.46) Γ— 100
Va = 6.10%

---

6. Voids in Mineral Aggregate (VMA)

Formula:

VMA = 100 βˆ’ [(Gmb Γ— Ps) / Gsb]

Calculation:

VMA = 100 βˆ’ [(2.31 Γ— 95) / 2.65]
VMA = 100 βˆ’ (219.45 / 2.65)
VMA = 100 βˆ’ 82.83
VMA = 17.17%

---

7. Voids Filled with Bitumen (VFB)

Formula:

VFB = [(VMA βˆ’ Va) / VMA] Γ— 100

Calculation:

VFB = [(17.17 βˆ’ 6.10) / 17.17] Γ— 100
VFB = (11.07 / 17.17) Γ— 100
VFB = 64.4%

---

8. Marshall Stability and Flow

Stability = 12 kN
Flow = 3.5 mm

---

9. Results Table (Prepare for All Bitumen Contents)

Pb(%) | Gmb | Gmm | Va | VMA | VFB | Stability | Flow
----------------------------------------------------
4.0 | ... | ... | ...| ... | ... | ... | ...
4.5 | ... | ... | ...| ... | ... | ... | ...
5.0 | 2.31|2.46 |6.1 |17.2 |64.4 |12 |3.5
5.5 | ... | ... | ...| ... | ... | ... | ...
6.0 | ... | ... | ...| ... | ... | ... | ...

---

10. Optimum Bitumen Content (OBC)

Formula:

OBC = (B1 + B2 + B3) / 3

Where:

B1 = bitumen at maximum stability
B2 = bitumen at maximum density
B3 = bitumen at 4% air voids

Calculation:

OBC = (5.0 + 5.2 + 5.3) / 3
OBC = 15.5 / 3
OBC = 5.17%

---

11. MS-2 Requirements Check

Stability β‰₯ 9 kN βœ”
Flow = 2–4 mm βœ”
Air Voids = 3–5% βœ”
VMA β‰₯ 15% βœ”
VFB = 65–75% βœ”

---

12. Final Result

Optimum Bitumen Content (OBC) = 5.17%

---

13. Important Formulas (For Study)

Ps = 100 βˆ’ Pb

Gmb = Wair / (Wssd βˆ’ Wwater)

Gmm = 100 / [(Pb/Gb) + (Ps/Gsb)]

Va = [(Gmm βˆ’ Gmb) / Gmm] Γ— 100

VMA = 100 βˆ’ [(Gmb Γ— Ps) / Gsb]

VFB = [(VMA βˆ’ Va) / VMA] Γ— 100

OBC = (B1 + B2 + B3) / 3

---

Note (Understanding)

Low air voids β†’ durable mix

High stability β†’ strong pavement

Proper VMA β†’ enough space for bitumen

---

Join my channel for full PDF :https://t.me/SmartcivilengineerSCE/4014

01/05/2026

Amazing New Dam .......

01/05/2026

spillway 😳

01/05/2026

New Constructed Dam πŸ’§

28/04/2026

Amazing Pile Installation for Air Bridge | Must See!
πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡
https://youtu.be/5K3nZyQKmfI

Want your business to be the top-listed Media Company in Delhi?
Click here to claim your Sponsored Listing.

Category

Address


Delhi