Posup5
Solar Operation and Maintenance | Electrical Engineering and Commissioning | HV/LV panel Fabrication
Solar Operation and Maintenance 50 kW- 50 mW | Roof-Top and Ground-Mounted solar plant | Electrical engineering and Commissioning
29/03/2023
Client: 2.4 MW Ground mounted, Puducherry
We, Green Tech Energie
Works: Adjustments, cleaning, lubrication, repairs, replacements, and the extension of equipment life.
Modules: Preventive maintenance, and cleaning activities
Frequency of cleaning: 2 Cycle per month
Water Quality: TDS level at least below 250 parts per million (ppm).
Quality of cleaning equipment: Brushes without hard bristles
Post wash care: Ultra Poly Vinyl Chloride (UPVC) conduit pipes
Inverter: Monthly basis - Check the voltage of the string inverter and record it in the periodic log book.
MC4 Cabling Connector: Ensuring Nil gap between the male and female connector pipes.
Transformer: Operating temperature, OTI (oil temperature), WTI (winding temperature), and oil level are monitored daily.
Protection from external elements: Rats and other rodents prevention
Remote monitoring: Retrieving all the data either from the inverter
Click here to claim your Sponsored Listing.
Category
Telephone
Website
Address
Bandipora
Opening Hours
| Monday | 7am - 9:45pm |
| Tuesday | 7am - 9:45pm |
| Wednesday | 7am - 9:45pm |
| Thursday | 7am - 9:45pm |
| Friday | 7am - 9:45pm |
| Saturday | 7am - 9:45pm |
| Sunday | 7am - 9:45pm |