PrecisionDevelopments
Services offered:
Residential & Commercial interior remodeling,Drywall,Joinery,Tiling, carpentry project coordination and much more
π¨ Project Update
Another project nearing completion!
β
Demolition and preparation works
β
New partition wall constructed
β
Cement board installation and finishing
β
Decorative vent block feature installed
β
Walk-in closet opening prepared and finished
β
Structural reinforcement and casting completed
β
Site cleaned and debris removed
Only a small temporary formwork section remains to be removed after the concrete has fully cured.
Thank you to our client for trusting Precision Developments Ltd.
π Need construction, renovation, or maintenance services? Call us today at (473) 422-7156.
Project Progress Update π¨
Currently working on a custom bathroom and walk-in closet partition installation.
Works completed so far include:
β Framing and securing of new partition wall
β Custom framing modifications for vent block feature
β Installation and fastening of all cement board sheeting
During the process, unforeseen conditions were discovered within the existing wall structure, including hollow block cores with no concrete reinforcement. Additional structural reinforcement works were carried out to ensure the project is completed securely and professionally.
The project is now moving into the finishing phase, including vent block installation, joint treatment, and final detailing.
Quality work isnβt just about how it looks β itβs also about making sure itβs built properly behind the finish. πͺπ½
π¨π¨β οΈNew Project Alert π¨β οΈπ¨
Currently working on a custom bathroom and walk-in closet partition installation.
Works completed so far include:
β Demolition and preparation works
Quality work isnβt just about how it looks β itβs also about making sure itβs built properly behind the finish. πͺπ½
πΊπ§ Another clean installation completed by Precision Developments!
Client gave us an urgent call β he just got a brand new 65" TV and wanted it mounted before tonightβs Saturday night wrestling showdown! π₯π₯
The TV was installed perfectly centered on a 14ft 6" living room wall, giving the space a clean, modern look and the perfect viewing angle.
The installation took approximately 45 minutes from start to finish. After securely mounting the wall bracket, we attached the mounting straps to the back of the TV, carefully lifted and secured it onto the mount, adjusted the tilt to zero, and pushed it flush against the wall for that sleek finish. β
Powered on with ease and ready for fight night! πΊπ₯
Another professional installation completed safely, securely, and neatly.
π§ Bathroom Plumbing Installation Completed π§
Another successful project completed β
Scope of works included:
βοΈ Installation of face basin with water supply & waste lines
βοΈ Toilet installation
βοΈ Trenching and installation of approximately 66 ft waste line
βοΈ Proper grading for smooth drainage flow
βοΈ Connection to existing septic system
βοΈ Full testing completed β no leaks, proper flow confirmed π§
Clean work, proper alignment, and reliable installation from start to finish π§πͺπΏ
Thank you to the client for trusting us with the project ππΏ
π Available for: 422-7156
β’ Plumbing installations
β’ Drainage & waste line works
β’ Bathroom renovations
β’ General construction services
Itβs Thursday at everyoneβs favourite bar on Dusty Highway π» &grill
π₯ Specials going on:
πΊ Corona β 5 for $50
π Wings almost at dollar wing prices
Good vibes, cold drinks, and great food β the perfect way to kick off the evening.
Pull up with your crew and enjoy π₯
Another job completed βοΈ
Carried out a series of plumbing upgrades and corrections to ensure the system is functioning properly and up to standard:
π§ Installed 1/2" Pressure Reducing Valve
π§ Relocated hose bib to a more practical front-of-house location
π§ Replaced damaged ball valve
π§ Reworked lock-off valve and added union for easier future maintenance
π§ Corrected previous installation by removing and reinstalling tees and fittings to proper alignment
Finished off with a full pressure test to ensure everything is sealed and operating as it should π§
At the end of the day, itβs not just about getting water flowing β itβs about doing the job right so the client has no issues down the line.
π¨ **Emergency Plumbing Call-Out Completed** π¨
We responded to an urgent situation involving a broken 1/2β water line connected to a kitchen sink. The pipe had failed at the elbow leading into the wall, causing disruption to the water supply.
βοΈ Mains water was safely turned off
βοΈ Concrete was carefully removed using a demolition hammer to access the damaged area
βοΈ Faulty section of pipe was removed
βοΈ Line was rebuilt using new 1/2β fittings and a coupling to correctly extend and align the pipe from inside the wall
β±οΈ Total repair time: **1 hour 15 minutes**
Water was restored later that day once everything was secured and tested, bringing the kitchen back to full working condition.
π§ **Reliable, efficient, and done right the first time**
β
*Satisfaction Guaranteed*
For all your catering needs contact ....
For all your premium party events ... The best place check β
Kash Party Rental Weβre a Grenada based company that provides Led tables, Led buckets , foldable tables and so much more
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
Grand Mal
Saint George
0000
Opening Hours
| Monday | 08:00 - 16:00 |
| Tuesday | 08:00 - 16:00 |
| Wednesday | 08:00 - 16:00 |
| Thursday | 08:00 - 16:00 |
| Friday | 08:00 - 16:00 |
| Saturday | 08:00 - 14:00 |