Pro-Constructors Limited
Maintain-Develop-Refurbish
Electrics, Plumbing and Heating Specialist(Renewable Energy)
04/10/2023
Hello All
Здравейте на всички
We are looking for multiskilled tilers-decorators for bathroom projects across London. Pricework. Contact me direct for more info. Utr, Nino, Cscs, permit to work.
Здравейте. Търсиме плочкаджии-бояджии за обекти бани в Лондон. Заплащането е на свършена работа. UTR, NINO, CSCS, с Право на работа.
Thank you
Благодаря
14/08/2023
MEET THE TEAM- Nick Georgiev-Project Manager and Estimator Pro-Constructors Limited.
Hello, my name is Nick. I am a plumber by trade. I am project manager and estimator for Pro-Constructors Limited. I have more than 20 years experience in the construction trade delivered planned works for social and private sector.
14/08/2023
Project E12***
Flooring repairs.
New Laminate flooring lay.
14/08/2023
Project SW18 5**
Bathroom adaptation.
Full bathroom works.
14/08/2023
Project SW18 3**
Full bathroom refurb. Bathroom adaptation.
03/07/2023
Pro-News.
New addition to our fleet.
Euro 6 Van, 6 - seater van with designated loading area. The 6 seater van allows us to travel more than 3 operatives on site where needed. Share travelling costs as well as time behind the wheel.
03/07/2023
Project SE11 5**
WIP
Started today 3/7/23
Full Bathroom refurb
02/07/2023
MEET THE TEAM- Zack Genchev
Hello , my name is Zack. I am Electrical QS and supervisor for Pro-Constructors Limited. I have more than 30 years experience in the construction industry. With vast experience in refurbishment, maintenance and new development projects. I have had chance to work in every sector and experienced the trade inside out. I am very energetic and always positive thinking. My moto is “There is always a solution to every problem” . I just completed my green energy solar panel installation course and looking forward to develop in that field further. I am married with 1 child. My Hobby and interests are playing tennis, spend time with family and yoga. Thank you.
02/07/2023
Project N4 1**
Kitchen and bathroom refurbishment
Electrical kitchen rewire
Full Bathroom and kitchen works
02/07/2023
Project SW4 5**
Full bathroom remodelling
Bathroom fitted and installed to customer needs.
Electrical works and hot and cold water alterations.
Alterations to heating.
02/07/2023
Project in BR1
Fault finding
Installation of air admittance valves.
Bathroom wastes didn’t drain properly. We Installed air admittance valves.
02/07/2023
Project E11 2**
2 x kitchens.
2 x bathrooms.
Fire risk assessment works.
Partitioning and dry lining.
Full electrical rewire.
Full heating and cold and hot water distribution systems.
Remodel 3 bedroom flat into 2 x 1 bedroom properties.
Duration 12 weeks.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Address
London