Total Build
Carpenter/builder with a special interest in restoration work. Small and large building works under
19/09/2025
We've given the garden a fresh new look with a revamped layout, a bright new fence, and a shed to match. Low-maintenance, tidy, and ready to enjoy β loving the transformation! Swipe to see the before pics.
10/08/2025
Final photos from our latest flat renovation β swipe to see the transformation!
We gave the space a thorough clean and a fresh coat of neutral paint to create a calm, inviting atmosphere. The old carpet was removed and replaced with new flooring for a clean, contemporary finish.
Another happy customer!
06/08/2025
Kitchen glow-up!
Here are the before-and-after shots from the kitchen in our recent flat renovation. We boxed in the boiler, added new skirting, and laid fresh floor tiles β small changes that made a big difference to the space.
A clean, refreshed look for a returning client!
05/08/2025
We've been hard at work renovating a flat for one of our long-term clients. Here are some before-and-after shots of the front door/entrance and the bathroom.
Great to see the transformation come together β more updates coming soon!
08/11/2024
03/06/2024
Bathroom redesigned by the customer to suit their needs. Another job completed π
09/03/2024
Another job finished in Wales. Bookshelves added to either side of fireplace and in alcove. Desk space with cubbyholes for extra storage. Boxed light added into shelving with cut out dragon on the side to create a silhouette on to the wall. Whole room and shelves painted. Customer to add opaque film to the glass on the light unit.
#
20/02/2024
Bathroom is finished, all painted and final finishing touches done. Modernised and user friendly. Have a look at our previous posts to see where we started.
07/02/2024
Bathroom reno is pretty much finished . Just a few finishing touches and then painting to be done. Complete transformation, updated and it's now user friendly. A reminder that we took out old bath, toilet and basin. Installed new walk in shower, new wc and basin with cabinet. Wall panels and flooring fitted. Have a look back at previous posts to see the before.
02/02/2024
Bathroom refit coming along nicely now. Wall panels are up, radiator in and shower drencher head is plumbed in. Panels make a nice change from tiles, they are durable and waterproof and require less cleaning. Are you team tile or team panel?πΏπΏ
01/02/2024
Day 3 on the bathroom yesterday. All fittings removed, tiles removed, pipework is in and shower tray fitted. Will post updates as we go.
30/01/2024
Work started on this bathroom yesterday. First step is to remove everything. Bath is coming out and new walk in shower to be fitted. New toilet and washbasin to be repositioned to improve layout. Follow along for updates as we renovate and transform this space.
Click here to claim your Sponsored Listing.
Category
Contact the business
Website
Address
Kent