Ashcon Engineering/Construction
Desgin + Construction + Consult
Wow
The most common causes of structural failures are:
(1) Poor communication between the various design professionals involved, e.g. engineers involved in conceptual design and those involved in the supervision of ex*****on of works.
(2) poor communication between the fabricators and erectors.
(3) Bad workmanship, which is often the result of failure to communicate the design decisions to the persons, involved in executing them.
(4) Compromises in professional ethics and failure to appreciate the responsibility of the profession to the community at large could also result in catastrophic failures.
(5) lack of appropriate professional design and construction experience, especially when novel structures are needed.
(6) complexity of codes and specifications leading to misinterpretation and misapplication.
(7) unwarranted belief in calculations and in specified extreme loads and properties.
(8) inadequate preparation and review of contract and shop drawings.
(9) poor training of field inspectors.
(10) compressed design and/or construction time.
27/03/2016
06/03/2016
Project : G+2 residence.
Location : saris (addis sefer).
Client : W/r Zerfe Belew
Description : Demolishing and Substructure
Construct : Ashenafi A.
06/03/2016
Project : G+3 residence.
Location : CMC summit
Client : Ato Tewodros
Description: Substructure
Construct : Ashenafi A.
16/10/2015
project : Car parking,fence and interior design finishing Work!
Client :General Mercantile
Construct :Ashenafi A.
እንዲህም መቀየር ይቻላል!!
14/10/2015
Project : G±1 residence.
Location : saris (addis sefer).
Client : Ato Sisay Worku.
Description : almost done
Design & contractor : Ashenafi A.
ርክክብና ምርቃት ፡......... በቅርቡ፡፡
23/06/2015
በቅርቡ የተሠሩ መንገዶች እንኳን መፍትሔ ያላቸዉ አይመስልም፡፡!
የሚረብሹ ዕይታዎች በጠቃሚ ገመዶች!!!
14/06/2015
Project : G±1 residence.
Location : saris (addis sefer).
Client : Ato Sisay Worku.
Description : Almost 98% completion.
Design & contractor : ASHcon Engineering/Construction.
14/06/2015
የአዲስ አበባ የእግረኛ መንገዶች ዘለቄታዊ መፍትሄ ይሻሉ!!
የትኞቹም የእግረኛ መንገዶች ተመልሰው እንደማይቆፈሩ እረግጠኛ መሆን አይቻልም ቢያንስ እንኳን አዲስ በሚሰሩ መንገዶች ላይ ወደ ፊት ለሚሠሩ የመሠረት ልማት ሥራዎች ታሳቢ ተደርጎ የንድፍ (design) እና የግንባታ ሥራዎች መካተትና መሠራት ይኖርባቸዋል ፡፡
ዛሬ የምንሠራበት ወጪ ነገ የምናፈርሥበት ስለሆነ ዛሬ እናሥብ!!!
16/05/2015
project : G±1 residence.
Location : saris (addis sefer).
Client : Ato Sisay Worku.
Description : under construction 95% completion. painting for service quarter family & bed rooms.
Design & contractor : ASHcon Engineering/Construction.