Acrow For Integrated Construction Services - AICS

Acrow For Integrated Construction Services - AICS

Share

Providing Integrated Construction Services. Formwork, Scaffolding & Heavy Lifting.

Photos from Acrow For Integrated Construction Services - AICS's post 08/04/2026

Successful Slipform Construction of Triangular Minarets in Benghazi ๐Ÿ‡ฑ๐Ÿ‡พ๐Ÿ—๏ธ

We are proud to announce the successful completion of the Slipform operations for the El-Raheem Mosque minarets at the Libya Mall Landmark project.

Executing a 35m height with a triangular cross-section required rigorous hydraulic control and continuous monitoring to ensure structural accuracy and vertical alignment. โš™๏ธ

Scope: Design, provide and operation of Slipform system.

Geometry: 30cm thick walls in a precise triangular shape. ๐Ÿ“

Duration: 12 days of non-stop continuous pouring per minaret. โฑ๏ธ

Client: Elsaeed for Contracting and Real Estate.

A shoutout to the on-site team for their dedication during the 24/7 pouring cycle ๐Ÿ‘ทโ€โ™‚๏ธ๐Ÿ‘

๐Ÿ‡ฑ๐Ÿ‡พ ๐Ÿ—๏ธ

01/04/2026

Engineering the future of infrastructure. ๐Ÿ—๏ธ

Delivering Industrial Services, engineered solutions and construct with precision, safety, and innovation.

21/03/2026
19/03/2026

Eid is almost hereโ€ฆ ๐ŸŒ™โœจ
A time for joy, laughter, and being surrounded by the people we love ๐Ÿ’›

Wishing you an Eid filled with happiness, warmth, and endless blessings ๐Ÿ’ซ

๐ŸŒ™
โœจ
๐Ÿ’›
๐Ÿค

Photos from Acrow For Integrated Construction Services - AICS's post 11/03/2026

ุงุญุชูุงู„ู‹ุง ุจุฑูˆุญ ุฑู…ุถุงู†ุŒ ุงุฌุชู…ุนู†ุง ููŠ ู‚ู„ุจ ุงู„ู…ุตู†ุน ู„ู†ูƒุฑู‘ู… ูุฑูŠู‚ู†ุง ูˆู†ู‚ุฏู‘ุฑ ุฌู‡ูˆุฏู‡ู….

ุญูู„ ุชูˆุฒูŠุน ุฌูˆุงุฆุฒ ุฑู…ุถุงู† ูƒุงู† ู„ุญุธุฉ ู…ู…ูŠุฒุฉ ู„ู„ุงุญุชูุงุก ุจุงู„ุฃุดุฎุงุต ุงู„ุฐูŠู† ูŠู‚ููˆู† ูˆุฑุงุก ู†ุฌุงุญู†ุง ูƒู„ ูŠูˆู…. ๐ŸŒ™โœจ

Photos from Acrow For Integrated Construction Services - AICS's post 05/03/2026

ู†ูุฎุฑ ููŠ AICS ุจุชู‚ุฏูŠู… ุญู„ูˆู„ ู…ุชูƒุงู…ู„ุฉ ููŠ ู…ุฌุงู„ ุงู„ุฅู†ุดุงุกุงุช ูˆุงู„ุฎุฏู…ุงุช ุงู„ุตู†ุงุนูŠุฉุŒ ู…ู† ุฎู„ุงู„ ูุฑูŠู‚ ู…ุชุฎุตุต ูˆุฎุจุฑุฉ ู…ู…ุชุฏุฉุŒ ู…ุน ุงู„ุงู„ุชุฒุงู… ุจุฃุนู„ู‰ ู…ุนุงูŠูŠุฑ ุงู„ุฌูˆุฏุฉ ูˆุงู„ูƒูุงุกุฉ ู„ุฏุนู… ู…ุฎุชู„ู ุงู„ู‚ุทุงุนุงุช ุงู„ุตู†ุงุนูŠุฉ ูˆุงู„ู…ุณุงู‡ู…ุฉ ููŠ ู†ุฌุงุญ ูˆุงุณุชุฏุงู…ุฉ ู…ุดุฑูˆุนุงุช ุนู…ู„ุงุฆู†ุง. ๐Ÿ—โš™๏ธ

25/02/2026

Al-Khuwair Bridge โ€“ Oman ๐Ÿ‡ด๐Ÿ‡ฒ

We are honored to have participated in the heavy lifting operations for bridge bearing replacement at El Khawer Bridge in Muscat, Oman ๐Ÿ’ช

Proud to support the maintenance of this key transport link, ensuring structural integrity, operational continuity, and long-term performance. ๐Ÿ’ช๐Ÿ—๏ธ๐Ÿ”ง

18/02/2026

Ramadan Kareem ๐ŸŒ™โœจ
May this holy month bring peace, blessings, and success to you and your families.

๐ŸŒ™
โœจ
๐Ÿ—

Photos from Acrow For Integrated Construction Services - AICS's post 17/02/2026

It was a pleasure hosting United Gas Derivatives Company (UGDC) for a productive and insightful visit. ๐Ÿญ

We discussed potential areas of collaboration and shared our expertise in delivering safe, efficient scaffolding solutions for oil & gas shutdown and maintenance projects.

11/02/2026

Raising standards across every project. ๐Ÿ“ˆ

Photos from Acrow For Integrated Construction Services - AICS's post 04/02/2026

Proud to support Fidak Roads & Bridges in the Rehabilitation of Bridges Project in Asir Province (Abha โ€“ Aqabat Shaโ€˜ar Road), delivered under the supervision of the Saudi Ministry of Transport (MOT) ๐Ÿ‡ธ๐Ÿ‡ฆ

For this project, AICS along side Acrow Saudia provided the ACROW Suspended Scaffolding System for steel and concrete girders, enabling critical bearing replacement works across seven (7) bridges. The system was installed at an average height of 70 meters above ground level, meeting the demands of complex, high-risk projects.

With over 100 suspended scaffolding sets and more than 1,500 linear meters installed beneath the bridges, the solution ensured safe access, stability, and efficient ex*****on throughout the rehabilitation works.

All activities were carried out in full compliance with HSE and quality standards, supported by a highly trained, certified workforce specialized in working at heightsโ€”because safety is never optional, itโ€™s essential ๐Ÿฆบโœ”๏ธ

Another milestone delivered with confidence, precision, and teamwork ๐Ÿ’ชโœจ

Photos from Acrow For Integrated Construction Services - AICS's post 21/01/2026

Sarafiya Bridge over the Tigris River | Iraq ๐Ÿ‡ฎ๐Ÿ‡ถ

We are proud to have contributed to the Sarafiya Bridge project over the Tigris River in Iraq, a major steel bridge structure comprising multiple steel girders, each approximately 104 meters in length and weighing around 1,000 tons.

Our scope of work included the design and ex*****on of a custom jacking system to lift and precisely position each steel girder from the temporary support system onto the permanent piers and abutments.

The operation was carried out in two critical stages:
โ€ข Stage 1 โ€“ Controlled lifting of the steel girder from the temporary supports.
โ€ข Stage 2 โ€“ Precision lowering and final
settlement of the girder onto the bridge bearings.

The final lowering operation involved a vertical movement of approximately 1.10 m and required extremely tight tolerances to avoid bearing overstress, differential settlement, or unintended load concentrations.

All spans were successfully seated on their bearings with full alignment and structural safety.

Want your business to be the top-listed Engineering Company in Cairo?
Click here to claim your Sponsored Listing.

Address


8 El-Doplomasien Street, Osman Towers, Nile Courniche, Maadi
Cairo