Acrow For Integrated Construction Services - AICS
Providing Integrated Construction Services. Formwork, Scaffolding & Heavy Lifting.
08/04/2026
Successful Slipform Construction of Triangular Minarets in Benghazi ๐ฑ๐พ๐๏ธ
We are proud to announce the successful completion of the Slipform operations for the El-Raheem Mosque minarets at the Libya Mall Landmark project.
Executing a 35m height with a triangular cross-section required rigorous hydraulic control and continuous monitoring to ensure structural accuracy and vertical alignment. โ๏ธ
Scope: Design, provide and operation of Slipform system.
Geometry: 30cm thick walls in a precise triangular shape. ๐
Duration: 12 days of non-stop continuous pouring per minaret. โฑ๏ธ
Client: Elsaeed for Contracting and Real Estate.
A shoutout to the on-site team for their dedication during the 24/7 pouring cycle ๐ทโโ๏ธ๐
๐ฑ๐พ ๐๏ธ
01/04/2026
Engineering the future of infrastructure. ๐๏ธ
Delivering Industrial Services, engineered solutions and construct with precision, safety, and innovation.
19/03/2026
Eid is almost hereโฆ ๐โจ
A time for joy, laughter, and being surrounded by the people we love ๐
Wishing you an Eid filled with happiness, warmth, and endless blessings ๐ซ
๐
โจ
๐
๐ค
11/03/2026
ุงุญุชูุงููุง ุจุฑูุญ ุฑู
ุถุงูุ ุงุฌุชู
ุนูุง ูู ููุจ ุงูู
ุตูุน ูููุฑูู
ูุฑูููุง ูููุฏูุฑ ุฌููุฏูู
.
ุญูู ุชูุฒูุน ุฌูุงุฆุฒ ุฑู
ุถุงู ูุงู ูุญุธุฉ ู
ู
ูุฒุฉ ููุงุญุชูุงุก ุจุงูุฃุดุฎุงุต ุงูุฐูู ููููู ูุฑุงุก ูุฌุงุญูุง ูู ููู
. ๐โจ
05/03/2026
ููุฎุฑ ูู AICS ุจุชูุฏูู ุญููู ู ุชูุงู ูุฉ ูู ู ุฌุงู ุงูุฅูุดุงุกุงุช ูุงูุฎุฏู ุงุช ุงูุตูุงุนูุฉุ ู ู ุฎูุงู ูุฑูู ู ุชุฎุตุต ูุฎุจุฑุฉ ู ู ุชุฏุฉุ ู ุน ุงูุงูุชุฒุงู ุจุฃุนูู ู ุนุงููุฑ ุงูุฌูุฏุฉ ูุงูููุงุกุฉ ูุฏุนู ู ุฎุชูู ุงููุทุงุนุงุช ุงูุตูุงุนูุฉ ูุงูู ุณุงูู ุฉ ูู ูุฌุงุญ ูุงุณุชุฏุงู ุฉ ู ุดุฑูุนุงุช ุนู ูุงุฆูุง. ๐โ๏ธ
Al-Khuwair Bridge โ Oman ๐ด๐ฒ
We are honored to have participated in the heavy lifting operations for bridge bearing replacement at El Khawer Bridge in Muscat, Oman ๐ช
Proud to support the maintenance of this key transport link, ensuring structural integrity, operational continuity, and long-term performance. ๐ช๐๏ธ๐ง
18/02/2026
Ramadan Kareem ๐โจ
May this holy month bring peace, blessings, and success to you and your families.
๐
โจ
๐
17/02/2026
It was a pleasure hosting United Gas Derivatives Company (UGDC) for a productive and insightful visit. ๐ญ
We discussed potential areas of collaboration and shared our expertise in delivering safe, efficient scaffolding solutions for oil & gas shutdown and maintenance projects.
11/02/2026
Raising standards across every project. ๐
04/02/2026
Proud to support Fidak Roads & Bridges in the Rehabilitation of Bridges Project in Asir Province (Abha โ Aqabat Shaโar Road), delivered under the supervision of the Saudi Ministry of Transport (MOT) ๐ธ๐ฆ
For this project, AICS along side Acrow Saudia provided the ACROW Suspended Scaffolding System for steel and concrete girders, enabling critical bearing replacement works across seven (7) bridges. The system was installed at an average height of 70 meters above ground level, meeting the demands of complex, high-risk projects.
With over 100 suspended scaffolding sets and more than 1,500 linear meters installed beneath the bridges, the solution ensured safe access, stability, and efficient ex*****on throughout the rehabilitation works.
All activities were carried out in full compliance with HSE and quality standards, supported by a highly trained, certified workforce specialized in working at heightsโbecause safety is never optional, itโs essential ๐ฆบโ๏ธ
Another milestone delivered with confidence, precision, and teamwork ๐ชโจ
21/01/2026
Sarafiya Bridge over the Tigris River | Iraq ๐ฎ๐ถ
We are proud to have contributed to the Sarafiya Bridge project over the Tigris River in Iraq, a major steel bridge structure comprising multiple steel girders, each approximately 104 meters in length and weighing around 1,000 tons.
Our scope of work included the design and ex*****on of a custom jacking system to lift and precisely position each steel girder from the temporary support system onto the permanent piers and abutments.
The operation was carried out in two critical stages:
โข Stage 1 โ Controlled lifting of the steel girder from the temporary supports.
โข Stage 2 โ Precision lowering and final
settlement of the girder onto the bridge bearings.
The final lowering operation involved a vertical movement of approximately 1.10 m and required extremely tight tolerances to avoid bearing overstress, differential settlement, or unintended load concentrations.
All spans were successfully seated on their bearings with full alignment and structural safety.
Click here to claim your Sponsored Listing.
Category
Contact the business
Website
Address
8 El-Doplomasien Street, Osman Towers, Nile Courniche, Maadi
Cairo