Walnut Grove Reno
We specialize in smaller home renovation and home repair. So drop us a line and let us take care of you and your home.
02/12/2026
Latest bathroom complete. We did a huge transformation with this bathroom going from ugly green and a shower that was leaking to a beautiful shower enclosure with a bench, rain shower head and hand wand.
Installed a 72 inch vanity with double sink and heated/lighted mirrors.
Just waiting for the glass to be installed.
Quite happy with how this bathroom turned out.
11/28/2025
Latest two bathrooms completed here in Walnut Grove. Beautiful Italian porcelain tile with heated floors.
Thanks to Tyler of T line construction helping with the powder room.
10/10/2025
Latest bathroom completed here in Walnut Grove. Nice young family. This the second bathroom I did for them.
Nice and bright from the dark and cramped.
08/29/2025
Something a little different.
Had a client of mine who I did her bathroom about six years ago, wanted me to change the shower pan tiles. No issues, just wanted to change it up.
Fortunately it wasn’t too difficult and we were able to install one inch glass hexagon tiles.
She is happy with the results.
05/21/2025
Just wrapped this large bathroom for a lovely couple here in Walnut Grove.
The project took two months to complete as there was a ton of hidden work that had to be done before the tiles could be installed.
Happy with the results.
01/03/2025
Some of the bathrooms I’ve completed in the last few years.
09/23/2024
Latest bathroom completed here Walnut grove. Second bathroom I did for this family.
The floor is heated for a luxurious feel.
02/21/2024
Completed this bathroom and laundry room recently, here in Walnut Grove.
11/09/2023
Most recent bathroom completed. Teamed up with T-line construction to complete this large job.
The bathroom was completed in 2016, but leaked at the shower and caused the floor to rot. We had to remove all the tiles and redo everything.
It was a large job but happy with the results.
09/21/2023
Latest fireplace done for John and Karen Cameron. More work than it looks like. Had to pour a new concrete base, reframe the wall to code and run all the wires in behind the walls.
The owners and myself are pretty happy with the results.
08/02/2023
Most recent bathroom done here in Walnut grove.
I enjoyed wrapping the tiles around the corners for a distinct look.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Address
94a Ave
Langley, BC
V1M 1M6
Opening Hours
| Monday | 9am - 5pm |
| Tuesday | 9am - 5pm |
| Wednesday | 9am - 5pm |
| Thursday | 9am - 5pm |
| Friday | 9am - 5pm |