Da-Lee

Da-Lee

Share

Da-Lee offers a Permanent Pothole Repair as well as Road Repair solutions.

Photos from Da-Lee's post 06/01/2026

🚧Matthew Kinson returned to the City of Cortland several weeks after their initial manhole repair demonstration, where the site continues to perform well and hold strong.

Following the success of the manhole repair system demo, the city expressed interest in further protecting their infrastructure by sealing the joints. Matthew went back to demonstrate Flow-Fix cold-applied mastic, delivering a fast and effective solution.

The application was completed and reopened to traffic within 20 minutes, with joints fully sealed to prevent water ingress and reduce the risk of future deterioration.

It is always rewarding to see proven solutions deliver both immediate results and long-term performance for our municipal partners.

Photos from Da-Lee's post 05/29/2026

🚨New York Thruway trialled Flow Fix, our cold-applied mastic for sealing joints during patching work on a busy section of the Thruway in Orange County. Matthew Kinson was on site for the demo, supporting the application and showcasing the product in action.

Typically, hot mastic would be used, requiring a second night on site due to the time needed to heat the material and allow it to cure before reopening to traffic. 🦺

Flow Fix can be mixed on site as needed and reopened to traffic within 20 minutes, allowing both the patching and joint sealing to be completed in a single evening.

👷🏼‍♂️Contact our team to see Flow Fix in action today!

05/27/2026

📣Last week, we had the opportunity to attend the Great Lakes Expo at Boyne Mountain Resort, with Matthew Morgado representing Da-Lee Pavement Products on-site.

As our first time exhibiting at the show, it was a great experience connecting with industry professionals and introducing our products and repair solutions to a new audience. 🦺

🚜The event provided valuable conversations, new relationships, and the chance to showcase how Da-Lee products help extend pavement life and improve efficiency on the job.

Thank you to everyone who stopped by to connect with Matthew, we appreciate the time and look forward to continuing those conversations.👏🏼

05/25/2026

This Memorial Day, we recognize and remember the men and women who lost their lives in service to the United States.

We’re grateful to work alongside American partners and communities, and we take a moment today to reflect on the sacrifice behind the freedoms we all share.

Wishing our U.S. clients and colleagues a meaningful Memorial Day.

Photos from Da-Lee's post 05/22/2026

🚜This week, Matthew Kinson represented Da-Lee Pavement Products at the APWA New York Metropolitan Chapter trade show.

It was a great opportunity to connect with public works professionals, showcase our pavement maintenance products, and have valuable conversations with attendees about the solutions we provide.🦺

🚦Thank you to everyone who stopped by to connect with Matthew and learn more about our products. We appreciate the chance to be part of such a strong industry event and look forward to continuing the conversations started there.

Photos from Da-Lee's post 05/20/2026

🚧Matthew Morgado recently delivered a Flow-Fix demonstration for a contractor working in downtown Toronto.

In high-traffic urban environments, minimizing downtime is critical. Flow-Fix is designed to support fast application while maintaining strong, long-term performance, helping crews complete repairs efficiently without extended disruptions. For a contractor in downtown Toronto, that means less disruption and a reliable repair solution that keeps projects moving.

It’s a practical solution for anyone managing tight timelines and demanding conditions in the city.

👷Reach out to book your demo today!

05/18/2026

Happy Victoria Day from all of us at Da-Lee Pavement Products!

Today, we celebrate the start of the season and want to thank our valued customers, partners, and team members for your continued trust and support. Your work drives what we do, and we’re proud to help build and maintain the roads, communities, and infrastructure that keep Canada moving.

We hope you’re enjoying a safe and relaxing long weekend with family and friends. Here’s to a strong season ahead!

Photos from Da-Lee's post 05/15/2026

🚧This week, Matt Stiller revisited the City of Tigard, OR to view a repair originally completed in July 2025 on a major arterial road carrying thousands of vehicles every day.

At the time, the priority was clear: deliver a rapid repair that could withstand constant, heavy traffic.

Nearly 10 months later, and likely over a million vehicles across it, the repair is still holding strong!

👷Real-world durability. Proven performance. Results that last.

Proud to support municipalities like the City of Tigard in keeping critical infrastructure moving.

Photos from Da-Lee's post 05/13/2026

🚧Monroe County, NY

This week, Matt Kinson led a product training session with the Monroe County Sewers Department following successful adoption of our system by their Highways Department. After seeing the results firsthand, the Sewers team took interest, evaluated the system, and moved forward with placing their own order.

To support their specific operational needs, Matt worked closely with the team to customize our mortar body to align with their catch basin specifications. This included increasing the depth by 4 inches beyond our standard size, allowing them to complete deeper pours efficiently in a single application.

👷It’s always rewarding to collaborate with teams that are focused on improving efficiency and quality in their infrastructure work. We are looking forward to supporting Monroe County as they continue implementing the system.

Photos from Da-Lee's post 05/11/2026

🚧At a busy intersection in the Town of Dunnville, a failing manhole frame was breaking apart the surrounding asphalt, something that typically leads to traffic disruption and longer repair timelines.

Matthew Morgado demonstrated Da-Lee’s Manhole Repair System as a quick and efficient fix for this crew. The work was completed in about 2 hours, and the road was reopened immediately after.

Our Manhole Repair System is a practical approach to reducing downtime while delivering a long-lasting repair.

If you’re dealing with similar issues in your municipality or project, it’s worth a conversation.

Contact us today!👷

Want your business to be the top-listed Engineering Company in Hamilton?
Click here to claim your Sponsored Listing.

Telephone

Address


350 Jones Road
Hamilton, ON
L8E5N2

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm