EvansPro Developments

EvansPro Developments

Share

We build landmarks

06/08/2026

Camera + welder = 🔥

The stairs at Pit-Lane Express are in and looking good. Shoutout to for the great work!

06/05/2026

Pit-Lane Express Update #3

The parking lot is paved, signage is up, and inside - this thing is really coming to life. Here's where we're at:

✅ Parking lot paved
✅ Building signage installed
✅ Sprinkler system live
✅ Exhaust fans installed and ready to wire
✅ Fresh air and exhaust complete
✅ Heaters ready to fire
✅ Two-stage makeup air set - built for Phase 2 from day one
✅ Condensers hung inside for easy servicing
✅ Compressor room complete - 30HP compressor, holding tanks, filters, dryers, and provisions for backup and Phase 2
✅ Office space nearly ready for paint
✅ Plumbing, sprinklers, and HVAC roughed in on both floors
✅ First coat of paint on upstairs — T-bar and grid going in
✅ Finishing trades lining up - lights, diffusers, sprinkler heads, sensors
✅ One-way privacy glass in offices
✅ Stairs getting primed and painted

Next update we'll be closing in on completion. Stay tuned. 👊

EvansPro: Imagine. Design. Build.

06/04/2026

Remember the sign we teased in the last video? Here it is! did an amazing job bringing the face of Pit-Lane Express to life. 🔥

05/28/2026

Fresh asphalt down at Pit-Lane Express. Also... Did you see the sign's cameo at the start? The visual identity of the building is really starting to show.

Photos from EvansPro Developments's post 05/27/2026

Design-build isn't just an industry buzzword to us. Design is the heartbeat of everything we do.

It's the thing that gives your brand a voice. That sets you apart from the noise. That puts you at the forefront of the minds of the people who matter most in your industry. At EvansPro, our goal is to go where others won't - designing buildings that perfectly combine form and function. Top of their class in engineering. Unrivalled in aesthetic presence.

Design isn't something fluffy or intangible. It's the thing that makes your business undeniable. That makes the experience within a space seamless. That turns your building into a landmark.

Photos from EvansPro Developments's post 05/22/2026

The front doors are in at Pit-Lane Express. It won't be long before you can walk through them for a new set of tires for your tractor/trailer. Stay tuned for a full site update coming next week!

05/05/2026

There's something so satisfying about watching a floor pour come together. It's a huge milestone for every project. Things at Pit-Lane Express are moving along beautifully!

04/30/2026

There's nothing like the taste of freshly-batched concrete in the morning. 😂

Big day at EvansPro — floor slab poured at Pit-Lane Express. That doesn't happen by accident. Weeks of prep goes in before a single truck shows up — rebar spacing, embedments, elevations, everything verified so the crew can show up and go to work without any setbacks.

All jokes aside — we bring in third-party testing on every pour. Slump and strength checks at 7, 14, and 28 days. And we never forget the taste test. 😏

Photos from EvansPro Developments's post 12/25/2025

Merry Christmas from all of us at EvansPro!

Want your business to be the top-listed Engineering Company in Coaldale?
Click here to claim your Sponsored Listing.

Telephone

Address


1104 12 Avenue
Coaldale, AB
T1M0G3

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm