CIVIL Engineering Knowledge

CIVIL Engineering Knowledge

Share

Civil engineering is a professional engineering discipline that deals with the design, construction, and mainten. It becomes everyday needs to human beings.

Engineer interest and goals- interest, ability, exposure to engineering

Engineer brings revolutionary changes to our society. Every day, we walk through buildings, drive on bridges, but not many of us think the work behind these architects. In fact, if bridges, buildings can easily collapse, then everyone's life will be in danger. Therefore, civil engineers are here to ensure everyone's safety,

Photos from CIVIL Engineering Knowledge's post 24/02/2024

মাটির পার্শ্বচাপ প্রতিরোধে রিটেইনিং ওয়াল দেয়া হয়ে থাকে যা ভবন ও ফাউন্ডেশন এর জন্য গুরুত্বপূর্ণ। বেজমেন্ট এর রিটেইনিং ওয়াল লিকেজ মুক্ত করে ঢালাই করতে যে যে বিষয়গুলির দিকে লক্ষ্য রাখতে হবে:

১/ মাটাম দেয়া হয়ে থাকে ১২” এল (L) ভাজে ।

২/ রিটেইনিং ওয়াল এর রড বাধা হয়ে গেলে মাঝের অংশে ঠিকভাবে ওয়াটার স্টপার দিতে হবে।

৩/ রিটেইনিং ওয়াল এর যে পাশে মাটি থাকবে সে পাশে ৫” ইটের গাথুঁনি দিতে হবে । গাথুঁনী ৩ দিন ভালোভাবে কিউরিং করতে হবে। এর আগে ঢালাইয়ের কাজ করা যাবে না।

৪/ সেমি বেজমেন্ট হলে ওয়াল এর উচ্চতা সাধারণত ৮ -৯ ফুট হয়ে থাকে (ডিজাইন অনুসারে)। সেক্ষেত্রে ২ ধাপে ঢালাই করতে হবে।

৫/ রডের মধ্যবর্তী স্থান এর পরিমাপ সমান রাখার জন্য রডের তৈরী ইউ ব্যবহার করতে হবে।
সাটার লাগোনোর সময় অবশ্যই ভালোভাবে সাপোর্ট লাগিয়ে আরো মজবুত করতে হবে।

৬/ রিটেইনিং ওয়াল ঢালাইয়ের ৪৮ ঘন্টা পূর্বে স্যান্ড ফিলিং করা যাবে না।

৭/ ভাইব্রেটর এর নজেল ইটের গাথুঁনির সাথে লাগিয়ে ভাইব্রেট করা যাবে না।

৮/ ঢালাই হলে তার মাঝে ২” X ২” শেয়ার কি (কাঠের ডাসা) ব্যবহার করতে হবে। যেটি উপরের অংশ ও নীচের অংশে লক তৈরীতে সাহায্য করে এবং ৩০ মিনিটের মধ্যে তুলে নিতে হবে নয়তো কংক্রিটে আটকে যাতে পারে।

৯/ একই পদ্বতিতে ২য় অংশ ঢালাই করতে হবে। ঢালাইয়ের আগে ওই স্থান অবশ্যই পরিষ্কার করে নিতে হবে।

19/12/2023

বিটুমিনাস সড়কের ইনফরমেশন ও এস্টিমেট।
অবশ্যই টাইমলাইনে রেখে দিন অত্যন্ত গুরুত্বপূর্ণ
সড়কের দৈর্ঘ্য = ১৫০০'-০"
সড়কের প্রস্থে = ২০'-০"
সড়কের উচ্চতা = ১'-৬"
এজিং = ৩"
সাইট ড্রেসিং প্রস্থ = ১'-০"
বালি খোয়া মিক্র লেয়ার ১:১ উচ্চতা = ৬"
খোয়ার লেয়ার = ৪"

১. #মাটি কাটা = ১৫০০'-০"x২০'-০"x১'-৬"
= ৪৫০০০ ঘনফুট

২. #মাটি ড্রেসিং = ১৫০০'-০'x২০'-০"
= ৩০০০০ বর্গফুট

৩. #ইটের ফ্লাট সোলিং = ১৫০০'-০'x১৯'-৬"
= ২৯২৫০ বর্গফুট

[এখানে ১৯'-৬" আসলো এই ভাবে
দুই ধারে এজিং এর জন্য ৩" করে যদি বাদ দেওয়া হয় তবে প্রস্থ = ২০'-০"-৩"x২
= ১৯'-৬"]

৪. #হেরিং বোন বন্ড = ১৫০০'-০'x১৯'-৬"
= ২৯২৫০ বর্গফুট

৬.দুই ধারে ইটের এন্ড এজিং
= ১৫০০x২
= ৩০০০ ফুট

৭. #বালি খোয়া মিক্র লেয়ার ১:১
= ১৫০০'-০"x১৯'-৬"x৬"
= ১৪৬২৫ ঘনফুট

৮. #খোয়ার লেয়ার = ১৫০০'-০"x১৯'-৬"x৪"
= ৯৭৫০ ঘনফুট

৯. #বিটুমিনাস carpeting
= ১৫০০'-০'x১৯'-৬"
= ২৯২৫০ বর্গফুট

১০. #ট্যাক কোট = ১৫০০'-০'x১৯'-৬"
= ২৯২৫০ বর্গফুট

১১. #সিল কোট = ১৫০০'-০'x১৯'-৬"
= ২৯২৫০ বর্গফুট

১২.বালি দিয়ে রাস্তার উপরে
= ১৫০০'-০'x১৯'-৬"
= ২৯২৫০ বর্গফুট

১৩. সাইট #ড্রেসিং = ১৫০০'-০'x১'-০"x২
= ৩০০০ বর্গফুট।

20/11/2023

সাটারিং এর হিসাবঃ

দৈর্ঘ্য=৫০ ফিট, প্রস্থ = ৩০ ফিট ।

▪️ছাদের সাটারিং এর কাঠ (প্লাই উড) প্রয়োজন (৫০*৩০)= ১৫০০ এসএফটি

▪️প্লাই উড ৮’X১২’ এবং থিকনেস হবে ১২ মিমি.

▪️এবং কাঠ লাগবে = এরিয় X ০.০২
= ১৫০০ X ০.০২
= ৩০ টি

▪️বীমের নিচের কাঠের জন্য (থিকনেস থাকে ১.৫”)
= এরিয়া X ০.২৪
= ১৫০০ X ০.২৪
= ৩৬০ আর এফ টি

▪️মাঝে বসাতে কাঠ লাগবে (৩” X ৩” লম্বা কাঠ)
= এরিয়া X ০.০৪
= ১৫০০ X ০.০৪
= ৬০০ আর এফ টি

▪️পেরেক (নেইল ) = ১৫০০ X ০.০২ = ৩০ কেজি

▪️বীমের নিচের জন্য বাঁশ লাগবে = ৩৬০ X ০.৫
= ১৮০ টি

▪️স্ল্যাবের নিচের জন্য বাঁশ লাগবে = ১৫০০ X ০.১৬
= ২৪০ টি

▪️কাঠ বাঁশকে আটকাতে ক্ল্যাম্প লাগবে = ১৫০০ X ০.০৮
= ১২০ টি

▪️সাটারিং এর তেল লাগবে = ১৫০০ X ০.০০৬ = ৯ লিটার

14/10/2023

ছাদ ঢালাইয়ের হিসাব।

১৫০০ বর্গ ফিট একটি ছাদ ঢালাই এর ইট, বালু, সিমেন্ট এবং রড এর পরিমান বের করার হিসাব

মনেকরি ছাদের দৈর্ঘ্য = ৫০ ফিট
এবং ছাদের প্রস্থ = ৩০ ফিট
ছাদের পুরুত্ব= ৫ ইঞ্চি

তাহলে ছাদের ক্ষেত্রফল = দৈর্ঘ্য X প্রস্থ = ৫০ X ৩০ = ১৫০০ বর্গ ফিট
এবং ছাদের আয়তন = দৈর্ঘ্য X প্রস্থ X পুরুত্ব = ৫০ X ৩০ X ০.৪১৬৬ (৫/১২ ইঞ্চি কে ফিট হিসেবে)
= ৬২৪.৯ বা ৬২৫ ঘনফিট/সিএফটি

আদ্র অবস্থায় আয়তন মোট আয়তনের চেয়ে দেড়গুন বেড়ে যায় তাই
আদ্র আবস্থায় আয়তন = ৬২৫ X ১.৫ = ৯৩৭.৫ বা ৯৩৮ ঘনফিট/সিএফটি

সিমেন্ট বালু ও খোয়ার অনুপাত = সিমেন্ট: বালু: খোয়া = ১: ২: ৪
অনুপাতের যোগফল = ১+২+৪ = ৭

সিমেন্ট এর পরিমান = (আদ্র অবস্থায় আয়তন X সিমেন্ট অনুপাত) ÷ অনুপাতের যোগফল
= (৯৩৮ X ১) ÷ ৭ = ১৩৪ ঘনফিট/সিএফটি
= ১০৮ ব্যাগ (১.২৫ ঘনফিট/সিএফটি = ১ ব্যাগ)

বালু এর পরিমান = (আদ্র অবস্থায় আয়তন X বালুর অনুপাত) ÷ অনুপাতের যোগফল
= (৯৩৮ X ২) ÷ ৭ = ২৬৮ ঘনফিট/সিএফটি

খোয়া এর পরিমান = (আদ্র অবস্থায় আয়তন X খোয়ার অনুপাত) ÷ অনুপাতের যোগফল
= (৯৩৮ X ৪) ÷ ৭ = ৫৩৬ ঘনফিট/সিএফটি
= ৭৮৮২.৩ বা ৭৮৮৩ টি ইট থেকে তৈরি খোয়া (১ টি ইট = ০.০৬৮ ঘনফিট/সিএফটি)

রড এর পরিমান = শুকনো অবস্থায় আয়তন X ২২২ X ১.৫% (রডের একক ওজন ২২২কেজি/ সিএফটি)
= ৬২৫ X ২২২ X (১.৫ ÷ ১০০)
= ২০৮১.২৫ বা ২০৮২ কেজি
= ২.০৮২ টন

আয়তন, রড বসানোর দুরত্ব ও রডের মিলিমিটার অনুসারে রডের হিসাব
ছাদে সাধারনত ১০ মিলিমিটার, ১২ মিলিমিটার, ১৬ মিলিমিটার রড ব্যবহার করা হয়
এবং ছাদে রড থেকে রডের দুরত্ব ৫ ইঞ্চি থেকে ৭ ইঞ্চি হয়ে থাকে

মনেকরি ছাদের দৈর্ঘ্য = ৫০ ফিট
এবং ছাদের প্রস্থ = ৩০ ফিট

আমরা যদি ৫ ইঞ্চি পর পর রড বসাই তাহলে

৫০ ফিট এ মোট রডের পরিমান
= ৫০ফিট/ ৫ ইঞ্চি +১
= ৬০০ ইঞ্চি / ৫ ইঞ্চি +১
= ১২০+১
= ১২১ পিস (প্রতি পিস ৩০ ফিট দৈর্ঘের)
= ৩৬৩০ ফিট

৩০ ফিট এ মোট রডের পরিমান
= ৩০ফিট/ ৫ ইঞ্চি +১
= ৩৬০ ইঞ্চি / ৫ ইঞ্চি +১
= ৭২+১
= ৭৩ পিস (প্রতি পিস ৫০ ফিট দৈর্ঘের)
= ৩৬৫০ ফিট

মোট রডের পরিমান = ৩৬৩০ ফিট+ ৩৬৫০ ফিট
=৭২৮০ ফিট

রডের ওজন = D²/৫৩২.২ কেজি (D হল রডের ডায়া বা মিলিমিটার)
= ১২²/ ৫৩২.২ কেজি (১২ মিলিমিটার রড এর ক্ষেত্রে)
= ০.২৭ কেজি (প্রতি ফিট এ)

মোট ওজন= ৭২৮০ X ০.২৭ কেজি
= ১৯৬৫.৬ বা ১৯৬৬ কেজি
= ১.৯৬৬ টন (আরও ৫-১০% অপচয় এর জন্য বাড়তি রডের দরকার হবে)
= ২০৬৪.৩ বা ২০৬৫ কেজি(৫% বাড়তি ধরে)ছাদ ঢালাইয়ের হিসাব।

১৫০০ বর্গ ফিট একটি ছাদ ঢালাই এর ইট, বালু, সিমেন্ট এবং রড এর পরিমান বের করার হিসাব

মনেকরি ছাদের দৈর্ঘ্য = ৫০ ফিট
এবং ছাদের প্রস্থ = ৩০ ফিট
ছাদের পুরুত্ব= ৫ ইঞ্চি

তাহলে ছাদের ক্ষেত্রফল = দৈর্ঘ্য X প্রস্থ = ৫০ X ৩০ = ১৫০০ বর্গ ফিট
এবং ছাদের আয়তন = দৈর্ঘ্য X প্রস্থ X পুরুত্ব = ৫০ X ৩০ X ০.৪১৬৬ (৫/১২ ইঞ্চি কে ফিট হিসেবে)
= ৬২৪.৯ বা ৬২৫ ঘনফিট/সিএফটি

আদ্র অবস্থায় আয়তন মোট আয়তনের চেয়ে দেড়গুন বেড়ে যায় তাই
আদ্র আবস্থায় আয়তন = ৬২৫ X ১.৫ = ৯৩৭.৫ বা ৯৩৮ ঘনফিট/সিএফটি

সিমেন্ট বালু ও খোয়ার অনুপাত = সিমেন্ট: বালু: খোয়া = ১: ২: ৪
অনুপাতের যোগফল = ১+২+৪ = ৭

সিমেন্ট এর পরিমান = (আদ্র অবস্থায় আয়তন X সিমেন্ট অনুপাত) ÷ অনুপাতের যোগফল
= (৯৩৮ X ১) ÷ ৭ = ১৩৪ ঘনফিট/সিএফটি
= ১০৮ ব্যাগ (১.২৫ ঘনফিট/সিএফটি = ১ ব্যাগ)

বালু এর পরিমান = (আদ্র অবস্থায় আয়তন X বালুর অনুপাত) ÷ অনুপাতের যোগফল
= (৯৩৮ X ২) ÷ ৭ = ২৬৮ ঘনফিট/সিএফটি

খোয়া এর পরিমান = (আদ্র অবস্থায় আয়তন X খোয়ার অনুপাত) ÷ অনুপাতের যোগফল
= (৯৩৮ X ৪) ÷ ৭ = ৫৩৬ ঘনফিট/সিএফটি
= ৭৮৮২.৩ বা ৭৮৮৩ টি ইট থেকে তৈরি খোয়া (১ টি ইট = ০.০৬৮ ঘনফিট/সিএফটি)

রড এর পরিমান = শুকনো অবস্থায় আয়তন X ২২২ X ১.৫% (রডের একক ওজন ২২২কেজি/ সিএফটি)
= ৬২৫ X ২২২ X (১.৫ ÷ ১০০)
= ২০৮১.২৫ বা ২০৮২ কেজি
= ২.০৮২ টন

আয়তন, রড বসানোর দুরত্ব ও রডের মিলিমিটার অনুসারে রডের হিসাব
ছাদে সাধারনত ১০ মিলিমিটার, ১২ মিলিমিটার, ১৬ মিলিমিটার রড ব্যবহার করা হয়
এবং ছাদে রড থেকে রডের দুরত্ব ৫ ইঞ্চি থেকে ৭ ইঞ্চি হয়ে থাকে

মনেকরি ছাদের দৈর্ঘ্য = ৫০ ফিট
এবং ছাদের প্রস্থ = ৩০ ফিট

আমরা যদি ৫ ইঞ্চি পর পর রড বসাই তাহলে

৫০ ফিট এ মোট রডের পরিমান
= ৫০ফিট/ ৫ ইঞ্চি +১
= ৬০০ ইঞ্চি / ৫ ইঞ্চি +১
= ১২০+১
= ১২১ পিস (প্রতি পিস ৩০ ফিট দৈর্ঘের)
= ৩৬৩০ ফিট

৩০ ফিট এ মোট রডের পরিমান
= ৩০ফিট/ ৫ ইঞ্চি +১
= ৩৬০ ইঞ্চি / ৫ ইঞ্চি +১
= ৭২+১
= ৭৩ পিস (প্রতি পিস ৫০ ফিট দৈর্ঘের)
= ৩৬৫০ ফিট

মোট রডের পরিমান = ৩৬৩০ ফিট+ ৩৬৫০ ফিট
=৭২৮০ ফিট

রডের ওজন = D²/৫৩২.২ কেজি (D হল রডের ডায়া বা মিলিমিটার)
= ১২²/ ৫৩২.২ কেজি (১২ মিলিমিটার রড এর ক্ষেত্রে)
= ০.২৭ কেজি (প্রতি ফিট এ)

মোট ওজন= ৭২৮০ X ০.২৭ কেজি
= ১৯৬৫.৬ বা ১৯৬৬ কেজি
= ১.৯৬৬ টন (আরও ৫-১০% অপচয় এর জন্য বাড়তি রডের দরকার হবে)
= ২০৬৪.৩ বা ২০৬৫ কেজি(৫% বাড়তি ধরে)

25/09/2023

➤ একটা বিল্ডিং এর সকল আইটেম মিলে ১০০% কিভাবে ভাগ করা হয়।
☞ উত্তরঃ
1. Structure = 35%
2. Brick work = 6%
3. Wood work = 5%
4. Metal work = 2%
5. Plambing and Sanitary = 6%
6. Electrical work = 7%
7. Plaster work = 4%
8. General Floor Tiles work = 6%
9. Toilet & Kit wall Tiles work = 3%
10. Aluminium work = 4%
11. EME(Lift,Generator,Substation)=10%
12. Paint work = 3%
13. Others civil work = 6%
14. Utility connection & Bill = 3%
Total = 100%

✪ STRUCTURE ~ 35%
- Footing & Column Padestal = 20%
- Grade Beam, UGWR top Slab = 5%
- GF Column, Stair etc = 4%
- 1st Floor Slab = 9%
- Typical Floor Column (5x3%) = 15%
- 2nd floor slab to roof slab (5x8) = 40%
- Roof top = 7%
TOTAL = 100% (৩৫% যেভাবে আসবে।)

✪ BRICK WORK ~ 6%
- GF Brick work = 6%
- 1st floor Brick work = 18%
- 2nd floor Brick work = 18%
- 3rd floor Brick work = 18%
- 4th floor Brick work = 18%
- 5th floor Brick work = 18%
-Roof Top Brick work = 4%
TOTAL = 100% (৬% যেভাবে হবে।)

✪ WOOD WORK ~ 5%
- Door frame = 40%
- Main Door Shutter = 15%
- Partex Door Shutter = 35%
- Cat Door & Accessories = 10%

TOTAL = 100% (৫% যেভাবে হবে)

✪ METAL WORK ~ 2%
- Window grill = 55%
- Verandah Railling = 20%
- Stair Railling = 10%
- Main gate, Gen-Sub, safety grill = 15%
TOTAL = 100% (২% যেভাবে হবে।)

✪ PLAMBING & SANITARY WORK~ 6%
- uPVC vertical line thru duct = 25%
- GI line work = 30%
- Fixture & Fittings = 40%
- Ground Floor = 5%
TOTAL = 100% (৬% যেভাবে হবে।)

✪ ELECTRICAL~ 7%
- Conduiting inside slab = 10%
- Conduiting on wall i/c MK box=15%
- Cabling work = 55%
- Switch-Socket = 20%
TOTAL = 100% (৭% যেভাবে হবে।)

✪ PLASTER ~ 4%
- Ceiling plaster = 20%
- Internal wall plaster = 50%
- Outside plaster/facing bricks = 30%
TOTAL = 100% (৪% যেভাবে হবে।)

✪ GENERAL FLOOR TILES ~ 6%
- General floor & Verandah = 75%
- Stair, typical lobby & lift wall = 20%
- GF lift lobby, wall, reception = 5%
TOTAL = 100% (৬% যেভাবে হবে।)

✪ TOILET & KIT WALL TILES ~ 3%
- Bath wall = 60%
- Kitchen wall = 20%
- Bath floor = 9%
- Bath counter top = 4%
- Kitchen floor = 3%
- Kitchen counter top =4%

TOTAL = 100% (৩% যেভাবে হবে।)

✪ ALUMINIUM WORK ~ 4%
- Outer framing-window sliding= 40%
- Glass shutter-window sliding = 30%
- Verandah sliding = 20%
- Toilet high window = 5%
- Comnon area = 5%
TOTAL = 100% (৪% যেভাবে হবে।)

✪ EME ~ 10%
- Lift = 50%
- Generator = 25%
- Substation = 20%
- PABX, Fire extinguisher etc = 5%
TOTAL = 100% (১০% যেভাবে হবে।)

✪ PAINT WORK ~ 3%
- Upto putty = 40%
- Internal wall&ceiling 1st coat= 20%
- Internal wall&ceiling 2nd coat= 15%
- Outside paint/ceramic Tites = 25%
TOTAL = 100% (৩% যেভাবে হবে।)

✪ OTHERS CIVIL WORK ~ 6%
- Boundary wall = 30%
- Line terracing/Roof top paver= 15%
- LOGO, Gardening & others = 4%
- GF BBC = 14%
- GF pavement & footpath dev = 10%
- Lintel, F/slab, drop wall, counter slab = 20%
- Cable tray = 1%
- Sanitary duct cover, ceiling etc= 4%
- Reception desk, letter box = 2%
TOTAL = 100% (৬% যেভাবে হবে।)

✪ UTILITY CONNECTION & BILL ~ 3%
- DESA/DESCO = 35%
- TITAS = 20
- WASA = 15%
- Utility bills = 30%
TOTAL = 100% (৩% যেভাবে হবে।)

Photos from CIVIL Engineering Knowledge's post 16/09/2023

Old Door 🚪 with New Ideas 💡 p4

Photos from CIVIL Engineering Knowledge's post 16/09/2023

Old Door 🚪 with New Ideas 💡 p3

Photos from CIVIL Engineering Knowledge's post 16/09/2023

Old Door 🚪 with New Ideas 💡 p2

Photos from CIVIL Engineering Knowledge's post 16/09/2023

Old Door 🚪 with New Ideas 💡 p1

23/06/2023

◑ কনস্ট্রাকশন সিকোয়েন্সঃ
☞ কোন কাজ কখন শুরু হবে তা নির্ধারণের জন্য আসলে একটি নির্মানক্রমের প্রয়োজন হয়।
এই নির্মানক্রম কে ইংরেজিতে প্রকৌশলীরা 'কনস্ট্রাকশন সিকোয়েন্স' বলে থাকেন। বাড়ি তৈরীর নির্মানক্রম কে দুই ভাগে ভাগ করা যায়।
একটিকে কাঠামোগত বা স্ট্রাকচারাল কাজ।
অন্যটিকে সৌন্দর্য বর্ধণ বা ফিনিশিং কাজ বলা হয়ে থাকে। এই দুই অংশ কে কয়েকটি ধাপে বা পর্যায়ে ভাগ করা যেতে পারেঃ-
✪ কাঠামোগত বা স্ট্রাকচারাল কাজঃ
পর্যায় ১- সরঞ্জাম সন্নিবেশ বা সাইট মোবিলাইজেশন।
পর্যায় ২- ভূমি জরিপ ও ভূগর্ভস্থ মাটি পরীক্ষা।
পর্যায় ৩-আর্কিটেকচারাল, স্ট্রাকচারাল, প্লাম্বিং এবং ইলেকট্রিক্যাল নকশা চুড়ান্ত করা।
পর্যায় ৪- ভবনের লে-আউট ও লেভেল দেয়া।
পর্যায় ৫- পাইলিং করা (যদি প্রয়োজন হয়) ও মাটি কাটা।
পর্যায় ৬- ফাউন্ডেশনের নিচে ব্লাইন্ড বা লীন
কংক্রীট ঢালাই ও ইটের সোলিং করা।
পর্যায় ৭- ফাউন্ডেশন ঢালাই।
পর্যায় ৮- কলাম ঢালাই।
পর্যায় ৯- বীম ও ছাদ ঢালাই।
পর্যায় ১০- মেঝেতে ইটের লে-আউট দেয়া।
পর্যায় ১১- ইটের গাঁথুনী করা।

✪সৌন্দর্য বর্ধণ বা ফিনিশিং কাজঃ
পর্যায় ১- দরজার চৌকাঠ লাগানো।
পর্যায় ২- জানালার গ্রীল লাগানো।
পর্যায় ৩- বাথরূম ও কিচেন সহ ছাদের বাগানের স্যানিটারী ও প্লাম্বিং এর সব ধরণের পাইপ ফিটিং করা।
পর্যায় ৪- বৈদ্যুতিক সুইচবোর্ডের দেওয়ালের
ভিতরের অংশ লাগানো।
পর্যায় ৫- ভিতরের প্লাষ্টার করা।
পর্যায় ৬- বাইরের দিকের প্লাষ্টার করা।
পর্যায় ৭-কিচেন ও বাথরূমের বেসিন বা সিঙ্কের স্ল্যাব ঢালাই ও কনসিল অংশ লাগানো।
পর্যায় ৮- থাই-এলুমিনিয়াম জানালা বা দরজা লাগানো (গ্লাস সহ)।
পর্যায় ৯- বাথরূম ও কিচেনের দেওয়ালের
টাইলস লাগানো।
পর্যায় ১০- সিলিং রং এর ১ম কোট দেয়া (সিলার বা পুটি সহ)।
পর্যায় ১১- ঘরের ভিতরে বা বাইরে মেঝেতে
ও সিড়িতে বা লিফটের দেওয়ালে টাইলস বা
মার্বেল লাগানো।
পর্যায় ১২- বৈদ্যুতিক তার টানা।
পর্যায় ১৩- বাইরের ও ভিতরের দেওয়ালের
রং এর ১ম কোট দেয়া।
পর্যায় ১৪- দরজার পাল্লা ফিটিং করা।
পর্যায় ১৫- বাথরূম ও কিচেনের ফিটিংস লাগানো।
পর্যায় ১৬- বৈদ্যুতিক সুইচ বা সকেট লাগানো।
পর্যায় ১৭- টাইলসের পয়েন্টিং করা।
পর্যায় ১৮- ছাদের উপরের বাগান মাটি ভরা
ও সুইমিং পুলের টাইলস লাগনো।
পর্যায় ১৯- বেজমেন্ট বা ছাদের উপর পেটেন
স্টোন করা।
পর্যায় ২০-কাঠের বার্নিশ ও দেওয়ালের চুড়ান্ত রঙ করা।

19/06/2023

যাদের সামর্থ আছে, বড় করে এক তলা বিল্ডিং না বানিয়ে সম্ভব হলে ছোট করে ডুপ্লেক্স বিল্ডিং বানান। গাছপালা ,সবুজ বাগানের জন্য বাকি জায়গা ছেড়ে দেন। বাড়ির আশেপাশে গাছপালা থাকলে বাসা ঠান্ডা থাকবে, বসবাস করে ভাল লাগবে। গাছপালার দিকে বড় বড় জানালা ,বারান্দা দেন। নীচতলায় ড্রইং, ডাইনিং, কিচেন, বেডরুম, দোতলায় বেডরুম আর ফ্যামিলি লিভিং। চাইলে টেরাস বারান্দা দেয়া যায়। টেরাস থেকে ছাদে যাওয়ার সিড়ি দেয়া যায়। উপরে নীচে প্রাইভেসী মেইনটেইন হয় আবার কমন এরিয়াতে একতলার ছাদে ভয়েড দিলে নীচতলা-দোতলার যোগাযোগ রক্ষা হয়।

১৮০০/২০০০ বর্গফুটের এক তলা বিল্ডিং না বানিয়ে রুম টয়লেট সংখ্যা সেইম রেখে ৮০০/৯০০ বর্গফুটের দোতলা বানান। খরচ প্রায় কাছাকাছি । কিছু ক্ষেত্রে ডুপ্লেক্সে খরচ কম। গ্রাউন্ড ফ্লোর বা একতলা যত বড় হবে মাটির কাজ, ফাউন্ডেশন, খরচ তত বাড়বে। খরচ কমানোর জন্য মাটির কাজ কমাতে হবে। তাতে জমিও বাচবে।

ডুপ্লেক্স এর অনেক সুবিধা, দেখতে সুন্দর, আলো বাতাস বেশি, নীচতলায় গরম কম, দোতলায় পোকামাকড় মশা কম। প্লাম্বিং স্যানিটারি কাজে খরচ কমে কিছু ক্ষেত্রে। ডুপ্লেক্সের নীচতলায় পানির প্রেশার ভাল পাওয়া যায়। আর বাজেট সংকট থাকলে নীচতলা দোতলা ভাগে ভাগে কন্সট্রাকশন করা যায়।

পাকা বাড়ি মানেই অভিজ্ঞ আর্কিটেক্ট ও ডিজাইনার এর মাধ্যমে ড্রইং ডিজাইন কম্পলিট করে বাড়ির কাজ ধরতে হবে সেটা ভুলে গেলে চলবে না।

27/05/2023

➤ একটা বিল্ডিং এর সকল আইটেম মিলে ১০০% কিভাবে ভাগ করা হয়।
☞ উত্তরঃ
1. Structure = 35%
2. Brick work = 6%
3. Wood work = 5%
4. Metal work = 2%
5. Plambing and Sanitary = 6%
6. Electrical work = 7%
7. Plaster work = 4%
8. General Floor Tiles work = 6%
9. Toilet & Kit wall Tiles work = 3%
10. Aluminium work = 4%
11. EME(Lift,Generator,Substation)=10%
12. Paint work = 3%
13. Others civil work = 6%
14. Utility connection & Bill = 3%
Total = 100%
✪ STRUCTURE ~ 35%
- Footing & Column Padestal = 20%
- Grade Beam, UGWR top Slab = 5%
- GF Column, Stair etc = 4%
- 1st Floor Slab = 9%
- Typical Floor Column (5x3%) = 15%
- 2nd floor slab to roof slab (5x8) = 40%
- Roof top = 7%
TOTAL = 100% (৩৫% যেভাবে আসবে।)
#সিভিল_ইঞ্জিনিয়ারিং
✪ BRICK WORK ~ 6%
- GF Brick work = 6%
- 1st floor Brick work = 18%
- 2nd floor Brick work = 18%
- 3rd floor Brick work = 18%
- 4th floor Brick work = 18%
- 5th floor Brick work = 18%
-Roof Top Brick work = 4%
TOTAL = 100% (৬% যেভাবে হবে।)
✪ WOOD WORK ~ 5%
- Door frame = 40%
- Main Door Shutter = 15%
- Partex Door Shutter = 35%
- Cat Door & Accessories = 10%
TOTAL = 100% (৫% যেভাবে হবে)
✪ METAL WORK ~ 2%
- Window grill = 55%
- Verandah Railling = 20%
- Stair Railling = 10%
- Main gate, Gen-Sub, safety grill = 15%
TOTAL = 100% (২% যেভাবে হবে।)
✪ PLAMBING & SANITARY WORK~ 6%
- uPVC vertical line thru duct = 25%
- GI line work = 30%
- Fixture & Fittings = 40%
- Ground Floor = 5%
TOTAL = 100% (৬% যেভাবে হবে।)
✪ ELECTRICAL~ 7%
- Conduiting inside slab = 10%
- Conduiting on wall i/c MK box=15%
- Cabling work = 55%
- Switch-Socket = 20%
TOTAL = 100% (৭% যেভাবে হবে।)
✪ PLASTER ~ 4%
- Ceiling plaster = 20%
- Internal wall plaster = 50%
- Outside plaster/facing bricks = 30%
TOTAL = 100% (৪% যেভাবে হবে।)
✪ GENERAL FLOOR TILES ~ 6%
- General floor & Verandah = 75%
- Stair, typical lobby & lift wall = 20%
- GF lift lobby, wall, reception = 5%
TOTAL = 100% (৬% যেভাবে হবে।)
✪ TOILET & KIT WALL TILES ~ 3%
- Bath wall = 60%
- Kitchen wall = 20%
- Bath floor = 9%
- Bath counter top = 4%
- Kitchen floor = 3%
- Kitchen counter top =4%
TOTAL = 100% (৩% যেভাবে হবে।)
✪ ALUMINIUM WORK ~ 4%
- Outer framing-window sliding= 40%
- Glass shutter-window sliding = 30%
- Verandah sliding = 20%
- Toilet high window = 5%
- Comnon area = 5%
TOTAL = 100% (৪% যেভাবে হবে।)
✪ EME ~ 10%
- Lift = 50%
- Generator = 25%
- Substation = 20%
- PABX, Fire extinguisher etc = 5%
TOTAL = 100% (১০% যেভাবে হবে।)
✪ PAINT WORK ~ 3%
- Upto putty = 40%
- Internal wall&ceiling 1st coat= 20%
- Internal wall&ceiling 2nd coat= 15%
- Outside paint/ceramic Tites = 25%
TOTAL = 100% (৩% যেভাবে হবে।)
সিভিল ইঞ্জিনিয়ারিং
✪ OTHERS CIVIL WORK ~ 6%
- Boundary wall = 30%
- Line terracing/Roof top paver= 15%
- LOGO, Gardening & others = 4%
- GF BBC = 14%
- GF pavement & footpath dev = 10%
- Lintel, F/slab, drop wall, counter slab = 20%
- Cable tray = 1%
- Sanitary duct cover, ceiling etc= 4%
- Reception desk, letter box = 2%
TOTAL = 100% (৬% যেভাবে হবে।)
✪ UTILITY CONNECTION & BILL ~ 3%
- DESA/DESCO = 35%
- TITAS = 20
- WASA = 15%
- Utility bills = 30%
TOTAL = 100% (৩% যেভাবে হবে।)

Want your business to be the top-listed Engineering Company in Dhaka?
Click here to claim your Sponsored Listing.

Website

Address


Dhaka