Alams Engineering Services

Alams Engineering Services

Share

A. Civil Construction Works,
B. Deep Tube Well (DTW) & Water Treatment Plant (WTP),
C. Horizontal Direct Drilling (HDD), DMA & etc.:
D. Open Trench with Sand Bed,

HDD - Horizontal Direct Drilling for Water Supply Pipeline, Power Cable, Internet etc. & MS/SS/GI/DI/C-D-E Class UPVC Pipe Works and Deep Tube Well Design & Construction Ductile Iron (DI) Pipes:
E. Open Trench with HDPE & UPVC Pipes:
7.

13/05/2026

At Gulshan thana, Dhaka
Living anout 300 no. of policeman.
Water crisis for more than 2/3 years.

24/09/2025

Projects Completed by the Alams Engineering Services. September 2025
EXPERINCES: by the name of our team or collaboration with others companies, we completed the following works as follows (we work all over Bangladesh):
A. Civil Construction Works, Gob (DPHE): Construction-supervision of
600-700cum Over Head Tank - 05,
600/700cum GW/SW Water Treatment Plant – 05
Office Buildings, 2 storied – 05,
25km Drains – 25 Km &
Pit Latrines – about 1500 no.

B. Deep Tube Well (DTW) & Water Treatment Plant (WTP), Gob & Private:
1. Involved 600+ no. of DTW, GoB (D-WASA, DPHE, Cantonment etc.) & Private:
Constructed 70m to 360m depth, Size: 50 - 200mm x 200 - 450mm, Capacity: 0.20-200m3/Hr
2. Involved 50+ no. of WTP, GoB (D-WASA & DPHE) & Private:
Constructed 0.20-200m3 and 650m3 Capacity

C. Horizontal Direct Drilling (HDD), DMA & etc.:
3. Dhaka Water Supply & Sewerage Authority (D-WASA), GoB:
Completed about 200km of HDD Works.
4. Department pf Public Health Engineering (DPHE), GoB:
Completed about 30km of HDD Works.
5. Power Development Board (PDB), GoB & Private:
Completed about 20km of HDD Works.

D. Ductile Iron (DI) Pipes:
6. Ductile Iron Pipe: Gob & Private:
Completed about 10.0Km.

E. Open Trench with HDPE & UPVC Pipes:
7. Open Trench with Sand Bed, GoB & Private: Completed about 40.0Km.

Photos from Alams Engineering Services's post 17/09/2025

HDD - Horizontal Direct Drilling at Chinese Company, BEZA, Miresharai, Chottogram

06/09/2025

District Metering Area, DMA if accomplished by Horizontal Direct Drilling, HDD of Dhaka-WASA

06/09/2025
05/05/2025

Md. Tareq, Manager
Mobile
01923 873 884

Want your business to be the top-listed Engineering Company in Dhaka?
Click here to claim your Sponsored Listing.

Website

Address


19/2 Rupnagar
Dhaka
1216

Opening Hours

Monday 08:30 - 06:30
Tuesday 08:30 - 06:30
Wednesday 08:30 - 06:30
Thursday 08:30 - 06:30
Saturday 08:30 - 06:30
Sunday 08:30 - 06:30