2nd floor roof casting time....
The result of not working according to Rajuk's design.
The 8th floor column casting is ongoing......
৭ম তলার ছাঁদ ঢালাইয়ের কাজ চলছে🏣🏣
At the last moment of slab casting 🏣🏣🏣
The temporary gate of the building is being build with pieces of rod.
Brick work
Slab casting time...
18/07/2025
The work of pile cap and column rob binding is going on.
07/07/2025
2nd Floor, Beam Binding Work Is Ongoing.