2nd floor roof casting time....

10/04/2026

The result of not working according to Rajuk's design.

01/02/2026

The 8th floor column casting is ongoing......

26/01/2026

৭ম তলার ছাঁদ ঢালাইয়ের কাজ চলছে🏣🏣

21/01/2026

At the last moment of slab casting 🏣🏣🏣

19/01/2026

The temporary gate of the building is being build with pieces of rod.

18/01/2026

Brick work

14/01/2026

Slab casting time...

18/07/2025

The work of pile cap and column rob binding is going on.

07/07/2025

2nd Floor, Beam Binding Work Is Ongoing.