Engineer Ruhul Amin
"đī¸ Building Dreams, One Design at a Time "
FAR āĻāϰ āĻā§āϝāĻžāϞāĻā§āϞā§āĻļāύāĻ
āĻŽāύ⧠āĻāϰāĻŋ, āĻāĻĒāύāĻžāϰ āĻāĻžā§āĻāĻžāϰ āĻĒāϰāĻŋāĻŽāĻžāύ- ā§Ģ āĻāĻžāĻ āĻž,
āĻāĻžā§āĻāĻž āĻā§āώ⧠āϏāĻžāĻŽāύ⧠āĻĻāĻŋā§ā§ āĻāύā§āĻāĻŋāύāĻŋā§āĻžāϏ āϰā§āĻĄ āĻā§āĻā§ - ⧍ā§Ļ āĻĢā§āĻ,
āĻĢāĻžāϰ- ā§Š.ā§Ģ ( BNBC āϤ⧠āĻĒāĻžāĻŦā§āύ āĻāϤ āĻāĻžāĻ āĻžāϰ āĻāύā§āϝ āĻāϤ āĻĢāĻžāϰ)
āĻāĻāύ, Maximum Build Area (M.B.A)= Area of Land x Far
= 5 katha x 3.5 (Here, FAR= 3.5)
= 5x(720)x3.5 ( 1 katha=720 sft)
= 3600x3.5
=12600 sft
Maximum Ground Coverage(M.G.C)- 62.5% (BNBC āϤ⧠āĻĒāĻžāĻŦā§āύ)
= 5 katha x 62.5%
= (5x 720) x 62.5%
= 2250 sft.
Now, Number of Floor (N.O.F)= MBA / MGC
= 12600 / 2250
= 5.6 Floor
Total Floor = Ground Floor + 5.6 Floor
= 1+ 5.6 Floor
= 6.6 Floor
Site visit at Gazipur.
Area: 1,70,000 Sft
Usage: RMG Factory
Our service :
> Industrial Building
> Commercial Building
> Warehouses
> Shipyard/ Shed with EOT Cranes of Different Capacity
> Power Plant Sheds
> Poultry and Dairy Farms
> Brick Manufacturing Plant
> Steel Foot Over Bridge
> Steel Stairs ......................... and so more.
If you have any interest in constructing the above noted type of structures, please do call us (@ 01834-861944 or, @ 01841999866) and we will offer you the most competitive price, on time delivery and quality as per your requirements.
Site Visit.
Project : Hydra textile Ltd.
Location: Narsingdhi.
For any quarry :
â 01834861944
Detailing of staircase
Site Visit.
Project : Baizid Chemical Ltd.
Location: Narsingdhi.
For any quarry :
â 01834861944
āĻāĻŽāϰāĻž āĻāĻ āĻļāĻŋāĻāĻŦā§ āĻāĻāĻāĻž āĻŦāĻŋāϞā§āĻĄāĻŋāĻ āĻāϰ āϏāĻāϞ āĻāĻāĻā§āĻŽ āĻŽāĻŋāϞ⧠⧧ā§Ļā§Ļ% āĻāĻŋāĻāĻžāĻŦā§ āĻāĻžāĻ āĻāϰāĻž āĻšā§āĨ¤
āĻāϤā§āϤāϰ:-
1. Structure = 35%
2. Brick work = 6%
3. Wood work = 5%
4. Metal work = 2%
5. Plambing and Sanitary = 6%
6. Electrical work = 7%
7. Plaster work = 4%
8. General Floor Tiles work = 6%
9. Toilet & Kit wall Tiles work = 3%
10. Aluminium work = 4%
11. EME (Lift, Generator, Substation)
= 10%
12. Paint work = 3%
13. Others civil work = 6%
14. Utility connection & Bill = 3%
Total = 100%
STRUCTURE 35%
- Footing & Column Padestal = 20%
- Grade Beam, UGWR top Slab = 5%
- GF Column, Stair etc = 4%
- 1st Floor Slab = 9%
- Typical Floor Column (5x3%) = 15%
- 2nd floor slab to roof slab (5x8)
= 40%
- Roof top = 7%
TOTAL = 100%
BRICK WORK 6%
- GF Brick work = 6%
- 1st floor Brick work = 18%
- 2nd floor Brick work = 18%
- 3rd floor Brick work = 18%
- 4th floor Brick work = 18%
- 5th floor Brick work = 18%
-Roof Top Brick work = 4%
TOTAL = 100%
WOOD WORK 5%
- Door frame = 40%
- Main Door Shutter = 15%
- Partex Door Shutter = 35%
- Cat Door & Accessories = 10%
TOTAL = 100%
METAL WORK 2%
- Window grill = 55%
- Verandah Railling = 20%
- Stair Railling = 10%
- Main gate, Gen-Sub, safety grill
= 15%
TOTAL = 100%
PLAMBING & SANITARY 6%
- uPVC vertical line thru duct = 25%
- GI line work = 30%
- Fixture & Fittings = 40%
- Ground Floor = 5%
TOTAL = 100%
ELECTRICAL - 7%
- Conduiting inside slab = 10%
- Conduiting on wall i/c MK box=15%
- Cabling work = 55%
- Switch-Socket = 20%
TOTAL = 100%
PLASTER 4%
- Ceiling plaster = 20%
- Internal wall plaster = 50%
- Outside plaster/facing bricks = 30%
TOTAL = 100%
GENERAL FLOOR TILES 6%
- General floor & Verandah = 75%
- Stair, typical lobby & lift wall = 20%
- GF lift lobby, wall, reception = 5%
TOTAL = 100%
TOILET & KIT WALL TILES = 3%
- Bath wall = 60%
- Kitchen wall = 20%
- Bath floor = 9%
- Bath counter top = 4%
- Kitchen floor = 3%
- Kitchen counter top =4%
TOTAL = 100%
ALUMINIUM WORK 4%
- Outer framing-window sliding= 40%
- Glass shutter-window sliding = 30%
- Verandah sliding = 20%
- Toilet high window = 5%
- Comnon area = 5%
TOTAL = 100%
EME 10%
- Lift = 50%
- Generator = 25%
- Substation = 20%
- PABX, Fire extinguisher etc = 5%
TOTAL = 100%
PAINT WORK = 3%
- Upto putty = 40%
- Internal wall&ceiling 1st coat= 20%
- Internal wall&ceiling 2nd coat= 15%
- Outside paint/ceramic Tites = 25%
TOTAL = 100%
OTHERS CIVIL WORK = 6%
- Boundary wall = 30%
- Line terracing/Roof top paver= 15%
- LOGO, Gardening & others = 4%
- GF BBC = 14%
- GF pavement & footpath dev = 10%
- Lintel, F/slab, drop wall, counter
slab = 20%
- Cable tray = 1%
- Sanitary duct cover, ceiling etc= 4%
- Reception desk, letter box = 2%
TOTAL = 100%
UTILITY CONNECTION & BILL = 3%
- DESA/DESCO = 35%
- TITAS = 20
- WASA = 15%
- Utility bills = 30%
TOTAL = 100%
03/02/2024
Meeting with G. S. Hasssan Chowdhury (TAMIM)
Board of Director (Abahoni Cricket Academy) about an upcoming project.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Address
Pallabi
Dhaka
1216
04/03/2024