FAR āĻāϰ āĻ•ā§āϝāĻžāϞāϕ⧁āϞ⧇āĻļāύāσ
āĻŽāύ⧇ āĻ•āϰāĻŋ, āφāĻĒāύāĻžāϰ āϜāĻžā§ŸāĻ—āĻžāϰ āĻĒāϰāĻŋāĻŽāĻžāύ- ā§Ģ āĻ•āĻžāĻ āĻž,
āϜāĻžā§ŸāĻ—āĻž āĻ˜ā§‡āώ⧇ āϏāĻžāĻŽāύ⧇ āĻĻāĻŋā§Ÿā§‡ āĻ•āĻ¨ā§āϟāĻŋāύāĻŋ⧟āĻžāϏ āϰ⧋āĻĄ āϗ⧇āϛ⧇ - ⧍ā§Ļ āĻĢ⧁āϟ,
āĻĢāĻžāϰ- ā§Š.ā§Ģ ( BNBC āϤ⧇ āĻĒāĻžāĻŦ⧇āύ āĻ•āϤ āĻ•āĻžāĻ āĻžāϰ āϜāĻ¨ā§āϝ āĻ•āϤ āĻĢāĻžāϰ)
āĻāĻ–āύ, Maximum Build Area (M.B.A)= Area of Land x Far
= 5 katha x 3.5 (Here, FAR= 3.5)
= 5x(720)x3.5 ( 1 katha=720 sft)
= 3600x3.5
=12600 sft
Maximum Ground Coverage(M.G.C)- 62.5% (BNBC āϤ⧇ āĻĒāĻžāĻŦ⧇āύ)
= 5 katha x 62.5%
= (5x 720) x 62.5%
= 2250 sft.
Now, Number of Floor (N.O.F)= MBA / MGC
= 12600 / 2250
= 5.6 Floor
Total Floor = Ground Floor + 5.6 Floor
= 1+ 5.6 Floor
= 6.6 Floor

13/03/2024

Site visit at Gazipur.
Area: 1,70,000 Sft
Usage: RMG Factory

19/02/2024

Our service :

> Industrial Building
> Commercial Building
> Warehouses
> Shipyard/ Shed with EOT Cranes of Different Capacity
> Power Plant Sheds
> Poultry and Dairy Farms
> Brick Manufacturing Plant
> Steel Foot Over Bridge
> Steel Stairs ......................... and so more.

If you have any interest in constructing the above noted type of structures, please do call us (@ 01834-861944 or, @ 01841999866) and we will offer you the most competitive price, on time delivery and quality as per your requirements.

14/02/2024

Site Visit.
Project : Hydra textile Ltd.
Location: Narsingdhi.
For any quarry :
✆ 01834861944

14/02/2024

Detailing of staircase

13/02/2024

Site Visit.
Project : Baizid Chemical Ltd.
Location: Narsingdhi.
For any quarry :
✆ 01834861944

Send a message to learn more

06/02/2024

āφāĻŽāϰāĻž āφāϜ āĻļāĻŋāĻ–āĻŦā§‹ āĻāĻ•āϟāĻž āĻŦāĻŋāĻ˛ā§āĻĄāĻŋāĻ‚ āĻāϰ āϏāĻ•āϞ āφāχāĻŸā§‡āĻŽ āĻŽāĻŋāϞ⧇ ā§§ā§Ļā§Ļ% āĻ•āĻŋāĻ­āĻžāĻŦ⧇ āĻ­āĻžāĻ— āĻ•āϰāĻž āĻšā§ŸāĨ¤
āωāĻ¤ā§āϤāϰ:-
1. Structure = 35%
2. Brick work = 6%
3. Wood work = 5%
4. Metal work = 2%
5. Plambing and Sanitary = 6%
6. Electrical work = 7%
7. Plaster work = 4%
8. General Floor Tiles work = 6%
9. Toilet & Kit wall Tiles work = 3%
10. Aluminium work = 4%
11. EME (Lift, Generator, Substation)
= 10%
12. Paint work = 3%
13. Others civil work = 6%
14. Utility connection & Bill = 3%
Total = 100%

STRUCTURE 35%
- Footing & Column Padestal = 20%
- Grade Beam, UGWR top Slab = 5%
- GF Column, Stair etc = 4%
- 1st Floor Slab = 9%
- Typical Floor Column (5x3%) = 15%
- 2nd floor slab to roof slab (5x8)
= 40%
- Roof top = 7%
TOTAL = 100%

BRICK WORK 6%
- GF Brick work = 6%
- 1st floor Brick work = 18%
- 2nd floor Brick work = 18%
- 3rd floor Brick work = 18%
- 4th floor Brick work = 18%
- 5th floor Brick work = 18%
-Roof Top Brick work = 4%
TOTAL = 100%

WOOD WORK 5%
- Door frame = 40%
- Main Door Shutter = 15%
- Partex Door Shutter = 35%
- Cat Door & Accessories = 10%
TOTAL = 100%

METAL WORK 2%
- Window grill = 55%
- Verandah Railling = 20%
- Stair Railling = 10%
- Main gate, Gen-Sub, safety grill
= 15%
TOTAL = 100%

PLAMBING & SANITARY 6%
- uPVC vertical line thru duct = 25%
- GI line work = 30%
- Fixture & Fittings = 40%
- Ground Floor = 5%
TOTAL = 100%

ELECTRICAL - 7%
- Conduiting inside slab = 10%
- Conduiting on wall i/c MK box=15%
- Cabling work = 55%
- Switch-Socket = 20%
TOTAL = 100%

PLASTER 4%
- Ceiling plaster = 20%
- Internal wall plaster = 50%
- Outside plaster/facing bricks = 30%
TOTAL = 100%

GENERAL FLOOR TILES 6%
- General floor & Verandah = 75%
- Stair, typical lobby & lift wall = 20%
- GF lift lobby, wall, reception = 5%
TOTAL = 100%

TOILET & KIT WALL TILES = 3%
- Bath wall = 60%
- Kitchen wall = 20%
- Bath floor = 9%
- Bath counter top = 4%
- Kitchen floor = 3%
- Kitchen counter top =4%
TOTAL = 100%

ALUMINIUM WORK 4%
- Outer framing-window sliding= 40%
- Glass shutter-window sliding = 30%
- Verandah sliding = 20%
- Toilet high window = 5%
- Comnon area = 5%
TOTAL = 100%

EME 10%
- Lift = 50%
- Generator = 25%
- Substation = 20%
- PABX, Fire extinguisher etc = 5%
TOTAL = 100%

PAINT WORK = 3%
- Upto putty = 40%
- Internal wall&ceiling 1st coat= 20%
- Internal wall&ceiling 2nd coat= 15%
- Outside paint/ceramic Tites = 25%
TOTAL = 100%

OTHERS CIVIL WORK = 6%
- Boundary wall = 30%
- Line terracing/Roof top paver= 15%
- LOGO, Gardening & others = 4%
- GF BBC = 14%
- GF pavement & footpath dev = 10%
- Lintel, F/slab, drop wall, counter
slab = 20%
- Cable tray = 1%
- Sanitary duct cover, ceiling etc= 4%
- Reception desk, letter box = 2%
TOTAL = 100%

UTILITY CONNECTION & BILL = 3%
- DESA/DESCO = 35%
- TITAS = 20
- WASA = 15%
- Utility bills = 30%
TOTAL = 100%

03/02/2024

Meeting with G. S. Hasssan Chowdhury (TAMIM)
Board of Director (Abahoni Cricket Academy) about an upcoming project.

Want your business to be the top-listed Engineering Company in Dhaka?
Click here to claim your Sponsored Listing.

Telephone

Address


Pallabi
Dhaka
1216