Solid Team
Building design, Soil test, Interior, Digital survey.
02/10/2025
Excited to share a new designed residential building project in Savar, Dhaka! đī¸
The structural design was completed in ETABS, with all irregularities carefully checked both manually and through software to ensure safety, accuracy, and reliability referencing BNBC 2020. A great opportunity to apply practical engineering knowledge to real-world challenges.
30/09/2025
āĻāĻāĻāĻŋ āĻāϝāĻŧāĻžāϰāĻĒā§āϰā§āĻ āύāĻŋāϰā§āĻŽāĻžāĻŖā§āϰ āϏāĻŽāϝāĻŧ āĻāĻā§āĻāĻŋāύāĻŋāϝāĻŧāĻžāϰāĻŋāĻ āĻŦāĻŋāĻŦā§āĻā§āϝ āĻŦāĻŋāώāϝāĻŧāϏāĻŽā§āĻš (Engineering Considerations for Airport Construction)
āĻāĻāĻāĻŋ āĻāϝāĻŧāĻžāϰāĻĒā§āϰā§āĻ āύāĻŋāϰā§āĻŽāĻžāĻŖā§ āĻāĻā§āĻāĻŋāύāĻŋāϝāĻŧāĻžāϰāĻĻā§āϰ āĻ
āύā§āĻāĻā§āϞ⧠āĻā§āϰā§āϤā§āĻŦāĻĒā§āϰā§āĻŖ āĻĻāĻŋāĻ āĻŦāĻŋāĻŦā§āĻāύāĻž āĻāϰāϤ⧠āĻšāϝāĻŧāĨ¤ āĻāĻĒāύāĻžāϰ āĻāĻŦāĻŋāϤ⧠āĻĻā§āĻāĻžāύ⧠āĻĒā§āϰāϧāĻžāύ āĻāĻĒāĻžāĻĻāĻžāύāĻā§āϞ⧠āĻĨā§āĻā§ āĻŦā§āĻāĻž āϝāĻžāϝāĻŧ, āϤāĻžāĻĻā§āϰ āĻāĻžāĻāĻā§ āĻŽā§āϞāϤ āĻāϝāĻŧā§āĻāĻāĻŋ āĻāĻžāĻā§ āĻāĻžāĻ āĻāϰāĻž āϝāĻžāϝāĻŧ:
ā§§. āϰāĻžāύāĻāϝāĻŧā§ āĻāĻŦāĻ āĻā§āϝāĻžāĻā§āϏāĻŋāĻāϝāĻŧā§āϰ āĻĄāĻŋāĻāĻžāĻāύ āĻ āύāĻŋāϰā§āĻŽāĻžāĻŖ (Runway and Taxiway Design and Construction)
āĻāĻā§āϞ⧠āĻāĻāĻāĻŋ āĻāϝāĻŧāĻžāϰāĻĒā§āϰā§āĻā§āϰ āϏāĻŦāĻā§āϝāĻŧā§ āĻā§āϰā§āϤā§āĻŦāĻĒā§āϰā§āĻŖ āĻ
āĻāĻļāĨ¤
* āĻĻā§āϰā§āĻā§āϝ, āĻĒā§āϰāϏā§āĻĨ āĻ āĻĒā§āώā§āĻ āϤāϞ: āϰāĻžāύāĻāϝāĻŧā§ āĻāĻŦāĻ āĻā§āϝāĻžāĻā§āϏāĻŋāĻāϝāĻŧā§āϰ āϏāĻ āĻŋāĻ āĻĻā§āϰā§āĻā§āϝ āĻ āĻĒā§āϰāϏā§āĻĨ āύāĻŋāϰā§āϧāĻžāϰāĻŖ āĻāϰāϤ⧠āĻšāϝāĻŧ āĻŦāĻŋāĻŽāĻžāύā§āϰ āϧāϰāύ (āϝā§āĻŽāύ, āĻā§āĻ, āĻŽāĻžāĻāĻžāϰāĻŋ āĻŦāĻž āĻŦāĻĄāĻŧ āĻā§āĻ) āĻāĻŦāĻ āϤāĻžāĻĻā§āϰ āĻā§āĻŦāĻžāϞāĻžāύāĻŋ āϧāĻžāϰāĻŖāĻā§āώāĻŽāϤāĻž āĻ
āύā§āϝāĻžāϝāĻŧā§āĨ¤ āĻĒā§āώā§āĻ āϤāϞāĻā§ (Pavement) āĻŦāĻŋāĻŽāĻžāύā§āϰ āĻāĻāύ āĻāĻŦāĻ āĻŦāĻžāϰāĻŦāĻžāϰ āĻāĻ āĻžāύāĻžāĻŽāĻžāϰ āĻāĻžāĻĒ āϏāĻšā§āϝ āĻāϰāĻžāϰ āĻāύā§āϝ āĻ
āϤā§āϝāύā§āϤ āĻļāĻā§āϤāĻŋāĻļāĻžāϞ⧠āĻ āĻā§āĻāϏāĻ āĻšāϤ⧠āĻšāϝāĻŧāĨ¤
* āĻŽāĻžāϰā§āĻāĻŋāĻ āĻāĻŦāĻ āϞāĻžāĻāĻāĻŋāĻ: āϰāĻžāύāĻāϝāĻŧā§āϤ⧠āϏāĻ āĻŋāĻ āĻŽāĻžāϰā§āĻāĻŋāĻ (āϝā§āĻŽāύ, āϏā§āύā§āĻāĻžāϰ āϞāĻžāĻāύ, āĻāĻāĻŽāĻŋāĻ āĻĒāϝāĻŧā§āύā§āĻ, āĻāĻžāĻāĻĄāĻžāĻāύ āĻā§āύ) āĻĨāĻžāĻāϤ⧠āĻšāĻŦā§āĨ¤ PAPI āϞāĻžāĻāĻāϏ (Precision Approach Path Indicator) āϏāĻš āĻ
āύā§āϝāĻžāύā§āϝ āύā§āĻāĻŋāĻā§āĻļāύāĻžāϞ āϞāĻžāĻāĻāĻŋāĻ āϏāĻŋāϏā§āĻā§āĻŽ āĻāĻŽāύāĻāĻžāĻŦā§ āĻŦāϏāĻžāϤ⧠āĻšāĻŦā§ āϝāĻžāϤ⧠āĻāĻžāϰāĻžāĻĒ āĻāĻŦāĻšāĻžāĻāϝāĻŧāĻž āĻŦāĻž āϰāĻžāϤā§āϰ āĻŦā§āϞāĻž āĻĒāĻžāĻāϞāĻāϰāĻž āύāĻŋāϰāĻžāĻĒāĻĻā§ āĻ
āĻŦāϤāϰāĻŖ āĻ āĻā§āĻ-āĻ
āĻĢ āĻāϰāϤ⧠āĻĒāĻžāϰā§āĨ¤
* āύāĻŋāϰāĻžāĻĒāϤā§āϤāĻž āĻāϞāĻžāĻāĻž: āϰāĻžāύāĻāϝāĻŧā§āϰ āĻļā§āώ⧠āĻĒāϰā§āϝāĻžāĻĒā§āϤ āϏā§āĻāĻĒāĻāϝāĻŧā§ (Stopway) āĻāĻŦāĻ āϰāĻžāύāĻāϝāĻŧā§ āϏā§āĻĢāĻāĻŋ āĻāϰāĻŋāϝāĻŧāĻž (RSA) āĻĨāĻžāĻāϤ⧠āĻšāĻŦā§ āϝāĻžāϤ⧠āĻā§āύ⧠āĻāĻžāϰāĻŖā§ āĻŦāĻŋāĻŽāĻžāύ āϰāĻžāύāĻāϝāĻŧā§ āĻ
āϤāĻŋāĻā§āϰāĻŽ āĻāϰ⧠āĻā§āϞ⧠āĻā§āώāϝāĻŧāĻā§āώāϤāĻŋ āĻāĻŽ āĻšāϝāĻŧāĨ¤
⧍. āĻāĻžāϰā§āĻŽāĻŋāύāĻžāϞ āĻ āĻāĻĒā§āϰāύ āĻāϰāĻŋāϝāĻŧāĻž (Terminal and Apron Area)
āĻāĻ āĻ
āĻāĻļāĻāĻŋ āϝāĻžāϤā§āϰ⧠āĻāĻŦāĻ āĻŦāĻŋāĻŽāĻžāύ āĻĒāϰāĻŋāĻāĻžāϞāύāĻžāϰ āĻāύā§āϝ āĻŦā§āϝāĻŦāĻšā§āϤ āĻšāϝāĻŧāĨ¤
* āĻāĻĒā§āϰāύ (Apron): āĻāĻ āϏā§āĻĨāĻžāύāĻāĻŋ āĻŦāĻŋāĻŽāĻžāύā§āϰ āĻĒāĻžāϰā§āĻāĻŋāĻ, āϞā§āĻĄāĻŋāĻ/āĻāύāϞā§āĻĄāĻŋāĻ āĻāĻŦāĻ āĻā§āĻŦāĻžāϞāĻžāύāĻŋ āĻāϰāĻžāϰ āĻāύā§āϝ āĻŦā§āϝāĻŦāĻšā§āϤ āĻšāϝāĻŧāĨ¤ āĻāĻāĻŋāĻā§āĻ āĻāĻžāϰ⧠āĻŦāĻŋāĻŽāĻžāύā§āϰ āĻāĻāύ āϏāĻšā§āϝ āĻāϰāĻžāϰ āĻŽāϤ⧠āĻŽāĻāĻŦā§āϤ āĻšāϤ⧠āĻšāϝāĻŧāĨ¤ āĻāϝāĻŧāĻžāϰāĻā§āϰāĻžāĻĢāĻ āϏā§āĻā§āϝāĻžāύā§āĻĄ āĻ āϤāĻžāϰ āĻŦāĻŋāύā§āϝāĻžāϏ āĻāĻŽāύ āĻšāϤ⧠āĻšāĻŦā§ āϝāĻžāϤ⧠āĻŦāĻŋāĻŽāĻžāύāĻā§āϞ⧠āύāĻŋāϰāĻžāĻĒāĻĻā§ āĻā§āϝāĻžāĻā§āϏāĻŋ āĻāϰāϤ⧠āĻĒāĻžāϰā§āĨ¤
* āĻāĻžāϰā§āĻŽāĻŋāύāĻžāϞ āĻŦāĻŋāϞā§āĻĄāĻŋāĻ: āϝāĻžāϤā§āϰ⧠āĻĒāϰāĻŋāώā§āĻŦāĻž (āĻā§āĻ-āĻāύ, āύāĻŋāϰāĻžāĻĒāϤā§āϤāĻž, āϞāĻžāĻā§āĻ āĻšā§āϝāĻžāύā§āĻĄāϞāĻŋāĻ, āĻāĻŽāĻŋāĻā§āϰā§āĻļāύ) āϏā§āώā§āĻ ā§āĻāĻžāĻŦā§ āĻĒāϰāĻŋāĻāĻžāϞāύāĻžāϰ āĻāύā§āϝ āĻāϰ āϞā§-āĻāĻāĻ āĻāĻŦāĻ āĻĒāϰāĻŋāĻāĻžāĻ āĻžāĻŽā§ āϤā§āϰāĻŋ āĻāϰāϤ⧠āĻšāϝāĻŧāĨ¤
* āĻĒā§āϝāĻžāϏā§āĻā§āĻāĻžāϰ āĻŦā§āϰā§āĻĄāĻŋāĻ āĻŦā§āϰāĻŋāĻ: āĻŦāĻŋāĻŽāĻžāύ āĻĨā§āĻā§ āĻāĻžāϰā§āĻŽāĻŋāύāĻžāϞ⧠āϝāĻžāϤā§āϰ⧠āĻāĻ āĻžāύāĻžāĻŽāĻžāϰ āĻāύā§āϝ āĻŦā§āϰāĻŋāĻā§āϰ āϏāĻ āĻŋāĻ āĻ
āĻŦāϏā§āĻĨāĻžāύ āĻāĻŦāĻ āĻĢāĻžāĻāĻļāύāĻžāϞ āĻĄāĻŋāĻāĻžāĻāύ āύāĻŋāĻļā§āĻāĻŋāϤ āĻāϰāϤ⧠āĻšāϝāĻŧāĨ¤
ā§Š. āϏāĻšāĻžāϝāĻŧāϤāĻž āĻ āĻŦāĻŋāĻļā§āώāĻžāϝāĻŧāĻŋāϤ āĻāĻžāĻ āĻžāĻŽā§ (Support and Specialized Structures)
āĻāĻā§āϞ⧠āĻāϝāĻŧāĻžāϰāĻĒā§āϰā§āĻā§āϰ āϏāĻžāϰā§āĻŦāĻŋāĻ āĻāĻžāϰā§āϝāĻāĻžāϰāĻŋāϤāĻžāϰ āĻāύā§āϝ āĻ
āĻĒāϰāĻŋāĻšāĻžāϰā§āϝāĨ¤
* āĻāϝāĻŧāĻžāϰ āĻā§āϰāĻžāĻĢāĻŋāĻ āĻāύā§āĻā§āϰā§āϞ āĻāĻžāĻāϝāĻŧāĻžāϰ (ATC): āĻāύā§āĻā§āϰā§āϞ āĻāĻžāĻāϝāĻŧāĻžāϰā§āϰ āĻ
āĻŦāϏā§āĻĨāĻžāύ āĻāĻŽāύ āĻšāϤ⧠āĻšāĻŦā§ āϝā§āύ āϏā§āĻāĻžāύ āĻĨā§āĻā§ āϰāĻžāύāĻāϝāĻŧā§ āĻāĻŦāĻ āĻā§āϝāĻžāĻā§āϏāĻŋāĻāϝāĻŧā§āϰ āϏāĻŽā§āĻĒā§āϰā§āĻŖ āĻĻā§āĻļā§āϝāĻŽāĻžāύāϤāĻž āĻĨāĻžāĻā§āĨ¤ āĻāϰ āĻāĻā§āĻāϤāĻž āĻāĻŦāĻ āĻā§āϤāϰā§āϰ āĻĒā§āϰāϝā§āĻā§āϤāĻŋāĻāϤ āϏā§āĻĨāĻžāĻĒāύāĻž āĻā§āĻŦ āύāĻŋāĻā§āĻāϤ āĻšāϤ⧠āĻšāϝāĻŧāĨ¤
* āĻšā§āϝāĻžāĻā§āĻāĻžāϰ āĻ āϰāĻā§āώāĻŖāĻžāĻŦā§āĻā§āώāĻŖ āĻāϞāĻžāĻāĻž (Hangars and Maintenance): āĻŦāĻŋāĻŽāĻžāύā§āϰ āϰāĻā§āώāĻŖāĻžāĻŦā§āĻā§āώāĻŖā§āϰ āĻāύā§āϝ āĻĒāϰā§āϝāĻžāĻĒā§āϤ āĻāĻžāϝāĻŧāĻāĻžāϏāĻš āĻšā§āϝāĻžāĻā§āĻāĻžāϰāĻā§āϞ⧠āĻĄāĻŋāĻāĻžāĻāύ āĻāϰāϤ⧠āĻšāϝāĻŧāĨ¤
* āĻĄāĻŋāϝāĻŧ-āĻāĻāϏāĻŋāĻ āĻāϰāĻŋāϝāĻŧāĻž (De-icing Area): āĻ āĻžāύā§āĻĄāĻž āĻāϞāĻŦāĻžāϝāĻŧā§āϰ āĻāϞāĻžāĻāĻžāϝāĻŧ āĻŦāĻŋāĻŽāĻžāύā§āϰ āĻŦāϰāĻĢ āĻĒāϰāĻŋāώā§āĻāĻžāϰā§āϰ āĻāύā§āϝ āϏāĻ āĻŋāĻ āĻĄā§āϰā§āύā§āĻ āĻ āĻŦāϰā§āĻā§āϝ āĻŦā§āϝāĻŦāϏā§āĻĨāĻžāĻĒāύāĻžāϰ āϏāĻžāĻĨā§ āĻāĻ āĻŦāĻŋāĻļā§āώ āĻāϞāĻžāĻāĻžāĻāĻŋ āĻĄāĻŋāĻāĻžāĻāύ āĻāϰāĻž āĻāϰā§āϰāĻŋāĨ¤
* āĻĢāĻžāϝāĻŧāĻžāϰ āϏā§āĻā§āĻļāύ āĻ āĻšā§āϞāĻŋāĻĒā§āϝāĻžāĻĄ: āĻāϰā§āϰ⧠āĻĒāϰāĻŋāώā§āĻŦāĻžāϰ āĻāύā§āϝ āĻĢāĻžāϝāĻŧāĻžāϰ āϏā§āĻā§āĻļāύ āĻāĻŦāĻ āĻšā§āϞāĻŋāĻĒā§āϝāĻžāĻĄāĻā§ āĻā§āĻļāϞāĻāϤ āĻ
āĻŦāϏā§āĻĨāĻžāύ⧠āϰāĻžāĻāϤ⧠āĻšāϝāĻŧ āϝāĻžāϤ⧠āĻĻā§āϰā§āϤāϤāĻŽ āϏāĻŽāϝāĻŧā§ āϝā§āĻā§āύ⧠āϏā§āĻĨāĻžāύ⧠āĻĒā§āĻāĻāĻžāύ⧠āϝāĻžāϝāĻŧāĨ¤
ā§Ē. āĻĒāϰāĻŋāĻŦā§āĻļāĻāϤ āĻ āĻ
āĻĒāĻžāϰā§āĻļāύāĻžāϞ āĻŦāĻŋāĻŦā§āĻāύāĻž (Environmental and Operational Considerations)
* āĻĄā§āϰā§āύā§āĻ āϏāĻŋāϏā§āĻā§āĻŽ: āϰāĻžāύāĻāϝāĻŧā§ āĻ āĻā§āϝāĻžāĻā§āϏāĻŋāĻāϝāĻŧā§āϤ⧠āĻŦā§āώā§āĻāĻŋāϰ āĻāϞ āϝāĻžāϤ⧠āύāĻž āĻāĻŽā§, āϏā§āĻāύā§āϝ āĻāĻāĻāĻŋ āĻāĻžāϰā§āϝāĻāϰ āĻĄā§āϰā§āύā§āĻ āϏāĻŋāϏā§āĻā§āĻŽ āĻ
āĻĒāϰāĻŋāĻšāĻžāϰā§āϝāĨ¤
* āύāĻŋāϰāĻžāĻĒāϤā§āϤāĻž āĻ āĻŦā§āώā§āĻāύ⧠(Security and Fencing): āĻ
āύāύā§āĻŽā§āĻĻāĻŋāϤ āĻĒā§āϰāĻŦā§āĻļ āĻ ā§āĻāĻžāϤ⧠āĻĒā§āϰ⧠āĻāϝāĻŧāĻžāϰāĻĒā§āϰā§āĻ āĻāϞāĻžāĻāĻž āĻā§āĻĄāĻŧā§ āĻāĻžāϰā§āϝāĻāϰ āĻŦā§āώā§āĻāύ⧠āĻāĻŦāĻ āύāĻŋāϰāĻžāĻĒāϤā§āϤāĻž āĻŦā§āϝāĻŦāϏā§āĻĨāĻž āύāĻŋāĻļā§āĻāĻŋāϤ āĻāϰāϤ⧠āĻšāϝāĻŧāĨ¤
* āϏāĻŽā§āĻĒā§āϰāϏāĻžāϰāĻŖā§āϰ āĻā§āώāĻŽāϤāĻž: āĻāĻŦāĻŋāώā§āϝāϤ⧠āϝāĻžāϤā§āϰ⧠āĻ āĻŦāĻŋāĻŽāĻžāύā§āϰ āϏāĻāĻā§āϝāĻž āĻŦāĻžāĻĄāĻŧāϞ⧠āϝā§āύ āĻāϝāĻŧāĻžāϰāĻĒā§āϰā§āĻāĻāĻŋ āϏāĻšāĻā§ āϏāĻŽā§āĻĒā§āϰāϏāĻžāϰāĻŖ āĻāϰāĻž āϝāĻžāϝāĻŧ, āϏā§āĻ āϏāĻŽā§āĻāĻžāĻŦāύāĻž āĻŽāĻžāĻĨāĻžāϝāĻŧ āϰā§āĻā§āĻ āĻĒā§āϰāĻžāĻĨāĻŽāĻŋāĻ āĻĄāĻŋāĻāĻžāĻāύ āϤā§āϰāĻŋ āĻāϰāĻž āĻšāϝāĻŧāĨ¤
15/09/2025
Category: RCC Residential building
Number of Storey: 4 Storied
Location: đSuti para, Kalampur, Dhamrai.
āĻāĻĒāύāĻžāϰ āĻŦāĻžāĻĄāĻŧāĻŋāĻāĻž āϝā§āύ āĻļā§āϧ⧠āĻŽāĻžāϤā§āϰ āĻŽāĻžāĻĨāĻž āĻā§āĻāĻžāϰ āϏā§āĻĨāĻžāύ āύāĻž āĻšāϝāĻŧāĨ¤ āĻāĻĒāύāĻžāϰ āĻŦāĻžā§āĻŋ āĻāϰāϤ⧠āĻšāĻŦā§ āĻā§āĻŦā§ āĻāĻŋāύā§āϤ⧠āĻĒā§āϰāĻā§āĻļāϞā§āϰ āĻĒāϰāĻžāĻŽāϰā§āĻļā§āĨ¤ āĻŦāĻžā§āĻŋ āĻāϰāĻžāϰ āĻĒā§āϰā§āĻŦā§ āĻŽā§āϞ āĻļāϰā§āϤ āĻšāϞ⧠āĻĒā§āϞā§āϝāĻžāύāĻŋāĻāĨ¤ āĻĒā§āϞā§āϝāĻžāύ āĻāϰ⧠āĻŦāĻžāĻĄāĻŧāĻŋ āĻāϰāĻž āĻšāϞ⧠āĻāĻĒāύāĻŋ āĻāĻĒāύāĻžāϰ āĻāĻŽāĻŋāϰ āϏāĻ āĻŋāĻ āĻŽā§āϞā§āϝāĻžāϝāĻŧāύ āĻāϰāϤ⧠āĻĒāĻžāϰāĻŦā§āύāĨ¤
đ Consult for any type of engineering and architectural services / advices: Solid Team
E-mail: [email protected]
+8801787550096
+8801677100311
đ¤āĻ
āĻĢāĻŋāϏ:
āĻā§āϰāĻžāϞāĻŋ āĻŽā§āύā§āϏāĻŋ āĻŽāĻžāϰā§āĻā§āĻ, āĻĒāϞā§āϞ⧠āĻŦāĻŋāĻĻā§āϝā§ā§ āĻŦāĻžāϏ āϏā§āĻā§āϝāĻžāύā§āĻĄ, āύāĻŦāĻŋāύāĻāϰ, āϏāĻžāĻāĻžāϰ, āĻĸāĻžāĻāĻžāĨ¤
12/09/2025
Category: RCC Residential building
Number of Storey: 8 Storied
Location: đKashimpur,Gazipur.
āĻāĻĒāύāĻžāϰ āĻŦāĻžāĻĄāĻŧāĻŋāĻāĻž āϝā§āύ āĻļā§āϧ⧠āĻŽāĻžāϤā§āϰ āĻŽāĻžāĻĨāĻž āĻā§āĻāĻžāϰ āϏā§āĻĨāĻžāύ āύāĻž āĻšāϝāĻŧāĨ¤ āĻāĻĒāύāĻžāϰ āĻŦāĻžā§āĻŋ āĻāϰāϤ⧠āĻšāĻŦā§ āĻā§āĻŦā§ āĻāĻŋāύā§āϤ⧠āĻĒā§āϰāĻā§āĻļāϞā§āϰ āĻĒāϰāĻžāĻŽāϰā§āĻļā§āĨ¤ āĻŦāĻžā§āĻŋ āĻāϰāĻžāϰ āĻĒā§āϰā§āĻŦā§ āĻŽā§āϞ āĻļāϰā§āϤ āĻšāϞ⧠āĻĒā§āϞā§āϝāĻžāύāĻŋāĻāĨ¤ āĻĒā§āϞā§āϝāĻžāύ āĻāϰ⧠āĻŦāĻžāĻĄāĻŧāĻŋ āĻāϰāĻž āĻšāϞ⧠āĻāĻĒāύāĻŋ āĻāĻĒāύāĻžāϰ āĻāĻŽāĻŋāϰ āϏāĻ āĻŋāĻ āĻŽā§āϞā§āϝāĻžāϝāĻŧāύ āĻāϰāϤ⧠āĻĒāĻžāϰāĻŦā§āύāĨ¤
đ Consult for any type of engineering and architectural services / advices: Solid Team
E-mail: [email protected]
+8801787550096
+8801677100311
đ¤āĻ
āĻĢāĻŋāϏ:
āĻā§āϰāĻžāϞāĻŋ āĻŽā§āύā§āϏāĻŋ āĻŽāĻžāϰā§āĻā§āĻ, āĻĒāϞā§āϞ⧠āĻŦāĻŋāĻĻā§āϝā§ā§ āĻŦāĻžāϏ āϏā§āĻā§āϝāĻžāύā§āĻĄ, āύāĻŦāĻŋāύāĻāϰ, āϏāĻžāĻāĻžāϰ, āĻĸāĻžāĻāĻžāĨ¤
Project Location: đKashimpur, Gazipur
āĻāĻāĻā§āϰāĻŋāĻ āĻĸāĻžāϞāĻžāĻāϝāĻŧā§āϰ āĻāĻā§āϰ āĻĻāĻŋāύāĻā§āϞā§āϤ⧠'āϏāϞāĻŋāĻĄ āĻāĻŋāĻŽ' āĻāϰ āĻāĻžāĻā§ āĻĒā§āϰāϤāĻŋāĻāĻŋ āĻŽā§āĻšā§āϰā§āϤ āĻā§āĻŦāĻ āĻā§āϰā§āϤā§āĻŦāĻĒā§āϰā§āĻŖ!
āϏā§āϞā§āϝāĻžāĻŦ āĻĸāĻžāϞāĻžāĻā§ā§āϰ āϏāĻŽā§ āϝ⧠āĻŦāĻŋāώā§āĻā§āϞ⧠āĻŦāĻŋāĻļā§āώāĻāĻžāĻŦā§ āĻā§ā§āĻžāϞ āϰāĻžāĻāĻž āĻāĻāĻŋāϤ, āϏā§āĻā§āϞ⧠āύāĻŋāĻā§ āĻĒā§ā§āύā§āĻ āĻāĻāĻžāϰ⧠āĻĻā§āĻā§āĻž āĻšāϞā§:
ā§§. āĻĢāϰā§āĻŽāĻāϝāĻŧāĻžāϰā§āĻ āĻāĻŦāĻ āĻļāĻžāĻāĻžāϰāĻŋāĻ: āĻĸāĻžāϞāĻžāĻā§ā§āϰ āĻāĻā§ āĻ
āĻŦāĻļā§āϝāĻ āĻĢāϰā§āĻŽāĻāϝāĻŧāĻžāϰā§āĻ āĻŦāĻž āĻļāĻžāĻāĻžāϰāĻŋāĻā§ā§āϰ āϏā§āĻĨāĻžāϝāĻŧāĻŋāϤā§āĻŦ āĻāĻŦāĻ āϏāĻ āĻŋāĻ āϞā§āĻā§āϞ āĻĒāϰā§āĻā§āώāĻž āĻāϰāĻž āĻāĻāĻŋāϤāĨ¤ āĻā§āύ⧠āĻāĻžā§āĻāĻžā§ āϝā§āύ āĻĢāĻžāĻāĻ āύāĻž āĻĨāĻžāĻā§, āϏā§āĻĻāĻŋāĻā§ āĻā§ā§āĻžāϞ āϰāĻžāĻā§āύāĨ¤
⧍. āϰāĻŋāĻāύāĻĢā§āϰā§āϏāĻŽā§āύā§āĻ (āϰāĻĄ): āϰāĻĄāĻā§āϞ⧠āύāĻŋāϰā§āĻĻāĻŋāώā§āĻ āĻĄāĻŋāĻāĻžāĻāύ āĻ
āύā§āϝāĻžā§ā§ āĻŦāĻžāĻāϧāĻž āĻšā§ā§āĻā§ āĻāĻŋ āύāĻž, āϤāĻž āϝāĻžāĻāĻžāĻ āĻāϰā§āύāĨ¤ āϰāĻĄā§āϰ āϏā§āĻĒā§āϏāĻŋāĻ, āϞā§āϝāĻžāĻĒāĻŋāĻ āĻāĻŦāĻ āĻā§āϞāĻŋā§āĻžāϰ āĻāĻāĻžāϰ āĻ āĻŋāĻ āĻāĻā§ āĻāĻŋ āύāĻž, āϤāĻž āύāĻŋāĻļā§āĻāĻŋāϤ āĻāϰāĻž āĻāϰā§āϰāĻŋāĨ¤
ā§Š. āĻāύāĻā§āϰāĻŋāĻ āĻŽāĻŋāĻā§āϏ: āĻāύāĻā§āϰāĻŋāĻ āĻŽāĻŋāĻā§āϏā§āϰ āĻ
āύā§āĻĒāĻžāϤ (āϏāĻŋāĻŽā§āύā§āĻ, āĻŦāĻžāϞāĻŋ, āĻā§ā§āĻž) āĻ āĻŋāĻ āĻāĻā§ āĻāĻŋ āύāĻž, āϤāĻž āĻĒāϰā§āĻā§āώāĻž āĻāϰāĻž āĻĒā§āϰā§ā§āĻāύāĨ¤ āϏā§āϞā§āϝāĻžāĻŦā§āϰ āĻļāĻā§āϤāĻŋ āύāĻŋāĻļā§āĻāĻŋāϤ āĻāϰāϤ⧠āϏāĻ āĻŋāĻ āĻŽāĻŋāĻā§āϏ āĻā§āĻŦ āĻā§āϰā§āϤā§āĻŦāĻĒā§āϰā§āĻŖāĨ¤
ā§Ē. āĻĸāĻžāϞāĻžāĻā§ā§āϰ āϏāĻŽā§: āĻāĻāĻŦāĻžāϰ⧠āϝāϤāĻā§āĻā§ āϏāĻŽā§āĻāĻŦ, āϤāϤāĻā§āĻā§ āĻĸāĻžāϞāĻžāĻ āĻāϰāĻž āĻāĻžāϞā§āĨ¤ āĻāύāĻā§āϰāĻŋāĻ āĻĸāĻžāϞāĻžāĻā§ā§āϰ āϏāĻŽā§ āĻāĻžāĻāĻŦā§āϰā§āĻāϰ āĻŦā§āϝāĻŦāĻšāĻžāϰ āĻāϰ⧠āĻŦāĻžāϤāĻžāϏ āĻŦā§āϰ āĻāϰ⧠āĻĻā§āĻā§āĻž āĻāĻāĻŋāϤ, āϝāĻžāϤ⧠āĻāύāĻā§āϰāĻŋāĻ āĻŽāϏā§āĻŖ āĻ āĻļāĻā§āϤāĻŋāĻļāĻžāϞ⧠āĻšā§āĨ¤
ā§Ģ. āϞā§āĻā§āϞāĻŋāĻ: āĻĸāĻžāϞāĻžāĻā§ā§āϰ āĻĒāϰ āϏāĻ āĻŋāĻ āĻā§āϞ āĻŦā§āϝāĻŦāĻšāĻžāϰ āĻāϰ⧠āϏā§āϞā§āϝāĻžāĻŦā§āϰ āĻāĻĒāϰāĻŋāĻāĻžāĻ āϞā§āĻā§āϞ āĻāϰāĻž āĻāĻāĻŋāϤāĨ¤ āϏā§āϞā§āϝāĻžāĻŦā§āϰ āĻĒā§āϰā§āϤā§āĻŦ āϝā§āύ āϏāĻŦ āĻāĻžā§āĻāĻžā§ āϏāĻŽāĻžāύ āĻšā§, āϤāĻž āύāĻŋāĻļā§āĻāĻŋāϤ āĻāϰāĻž āĻāϰā§āϰāĻŋāĨ¤
ā§Ŧ. āĻāĻŋāĻāϰāĻŋāĻ: āĻĸāĻžāϞāĻžāĻā§ā§āϰ āĻĒāϰ āĻāύāĻā§āϰāĻŋāĻāĻā§ āϏāĻ āĻŋāĻ āĻāϰā§āĻĻā§āϰāϤāĻž āĻāĻŦāĻ āϤāĻžāĻĒāĻŽāĻžāϤā§āϰāĻž āĻĨā§āĻā§ āϰāĻā§āώāĻž āĻāϰāĻž āĻĒā§āϰāϝāĻŧā§āĻāύāĨ¤ āĻāĻŋāĻāϰāĻŋāĻ āĻāϰ āĻŽāĻžāϧā§āϝāĻŽā§ āĻāύāĻā§āϰāĻŋāĻā§āϰ āϏāϰā§āĻŦā§āĻā§āĻ āĻļāĻā§āϤāĻŋ āĻ
āϰā§āĻāύ āύāĻŋāĻļā§āĻāĻŋāϤ āĻšā§āĨ¤ āĻāĻāĻŋ āϏāĻžāϧāĻžāϰāĻŖāϤ ⧍⧧ āĻĨā§āĻā§ ā§¨ā§Ž āĻĻāĻŋāύ āĻĒāϰā§āϝāύā§āϤ āĻāϰāĻž āĻšā§āĨ¤
āĻā§āĻŖāĻāϤ āĻŽāĻžāύ āύāĻŋāĻļā§āĻāĻŋāϤ āĻāϰāϤā§, āĻĸāĻžāϞāĻžāĻā§ā§āϰ āĻāĻā§āϰ āĻĻāĻŋāύ āĻāĻā§āĻāĻŋāύāĻŋā§āĻžāϰ āĻĻā§āĻŦāĻžāϰāĻž āĻ
āϤā§āϝāύā§āϤ āϏāϤāϰā§āĻāϤāĻžāϰ āϏāĻžāĻĨā§ āϏā§āϞā§āϝāĻžāĻŦ āĻāĻŦāĻ āĻŦāĻŋāĻŽ āϞā§āĻāĻāĻ āĻā§āĻ āĻāϰāĻž āĻāϰā§āϰāĻŋāĨ¤ āĻā§āϞāĻžāϝāĻŧā§āύā§āĻā§āϰ āĻāĻžāĻšāĻŋāĻĻāĻž āĻ
āύā§āϝāĻžā§ā§ āĻĄāĻŋāĻāĻžāĻāύ āĻ āĻĄā§āϰāϝāĻŧāĻŋāĻ āĻ
āύā§āϏāϰāĻŖ āĻāϰāĻž āĻšāϝāĻŧā§āĻā§ āĻāĻŋ āύāĻž, āϤāĻž āĻāĻŽāϰāĻž āĻĒā§āĻā§āĻāĻžāύā§āĻĒā§āĻā§āĻāĻāĻžāĻŦā§ āĻĻā§āĻāĻž āĻšāϝāĻŧāĨ¤
āĻāĻĒāύāĻžāϰ āϏā§āĻŦāĻĒā§āύā§āϰ āĻāĻžāĻ āĻžāĻŽā§āĻā§ āĻŦāĻžāϏā§āϤāĻŦā§ āϰā§āĻĒ āĻĻāĻŋāĻā§āĻāĻŋāĨ¤ āĻĻāĻā§āώāϤāĻž āĻāϰ āύāĻŋāĻā§āĻāϤ āĻāĻžāĻā§āϰ āĻŽāĻžāϧā§āϝāĻŽā§ āύāĻŋāĻļā§āĻāĻŋāϤ āĻāϰāĻž āĻšāϝāĻŧ āϝā§āύ āĻĒā§āϰāϤāĻŋāĻāĻŋ āĻāĻžāĻ āĻšāϝāĻŧ āϤā§āϰā§āĻāĻŋāĻŽā§āĻā§āϤ āĻāĻŦāĻ āĻā§āĻāϏāĻāĨ¤
Project Location: đKashimpur, Gazipur
Mobile : +8801787-550096
+8801677-100311
Mail : [email protected]
Address : Pallibidyut Bus Stand, Karali Munshi Market, Nabinagar, Ashulia, Savar, Dhaka.
#āϏāϞāĻŋāĻĄ_āĻāĻŋāĻŽ #āĻā§āĻŖāĻāϤ_āĻāĻžāĻ #āϏā§āĻŦāĻĒā§āύāĻā§_āĻŦāĻžāϏā§āϤāĻŦāϤāĻž #āύāĻŋāϰā§āĻŽāĻžāĻŖ_āĻāĻžāĻ #āĻāĻā§āĻāĻŋāύāĻŋāϝāĻŧāĻžāϰāĻŋāĻ #āϏā§āϞā§āϝāĻžāĻŦ_āĻāĻžāϏā§āĻāĻŋāĻ
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
Baipail
1344
Opening Hours
| Monday | 09:00 - 22:00 |
| Tuesday | 09:00 - 22:00 |
| Wednesday | 09:00 - 22:00 |
| Thursday | 09:00 - 22:00 |
| Friday | 09:00 - 22:00 |
| Saturday | 09:00 - 22:00 |
| Sunday | 09:00 - 22:00 |