Control Panel Designs
Model Railway Control Panels - Custom made for you
17/07/2024
Magazine is out now. Featuring our layout - Casino.
27/06/2024
Control Panel at Casino Locomotive Depot and Yard. Routes are selected by pushing the LED lit tactile switches.
27/06/2024
After leaving Martins Creek, loaded ballast trains are invariably stopped in the loop at Paterson, to make way for higher priority traffic.
27/06/2024
Not much ado here. Casino passengers wait for the Up North Coast Mail to arrive on the back platform road.
27/06/2024
The Down Gold Coast Motorail, running 2 hours late, passes the Pioneer Concrete Plant to the south of Casino station. The local radio stations provide hourly updates on the progress of the day's Motorail.
27/06/2024
A close up of loading operations, at dawn, at Martins Creek ballast quarry. 4821 will take its load of B*W ballast wagons, as well as K and S trucks full of 'fines' for use in the Newcastle area.
27/06/2024
Dawn. 4821 has already arrived with an empty ballast train, and proceeds to load the wagons.
27/06/2024
Martins Creek ballast quarry.
27/06/2024
A Down Express freight, led by brace of 43 Class Alcos tries to outrun a summer thunderstorm as it approaches Paterson from the south.
27/06/2024
The Brisbane Limited has arrived on the main line platform. Passengers look for their coaches. In the platform back road is 4415 ready to depart with the UP North Coast Mail.
27/06/2024
The 'Central Commentary Position'. Everything can be switched ON or OFF here. The DCC system, and the Control Panel system are integrated with a PC to provide full automation.
27/06/2024
A long view of Casino station, yard and loco depot, taken from the loco depot. Casino is approx 11m long.
Click here to claim your Sponsored Listing.
Website
Address
Perth, WA
6000