Nobles

Nobles

Share

We provide the safest operating guidelines and offer the safest products and engineering design services possible.

Nobles is Australiaโ€™s leading specialist provider of lifting and rigging equipment, technical services and engineering design for complete solutions to your heaviest and most complex lifting requirements. As the industry leader in lifting and rigging solutions, we can provide complete service from design and manufacture of lifting equipment, supply of the best hoisting and rigging products from

13/05/2026

๐˜š๐˜ฐ๐˜ฎ๐˜ฆ ๐˜ฑ๐˜ฆ๐˜ฐ๐˜ฑ๐˜ญ๐˜ฆ ๐˜ซ๐˜ถ๐˜ด๐˜ต ๐˜ฅ๐˜ฐ ๐˜ต๐˜ฉ๐˜ฆ ๐˜ซ๐˜ฐ๐˜ฃ.
๐™Š๐™ฉ๐™๐™š๐™ง๐™จ ๐™—๐™š๐™˜๐™ค๐™ข๐™š ๐™ฅ๐™–๐™ง๐™ฉ ๐™ค๐™› ๐™ฉ๐™๐™š ๐™ง๐™š๐™–๐™จ๐™ค๐™ฃ ๐™˜๐™ก๐™ž๐™š๐™ฃ๐™ฉ๐™จ ๐™ ๐™š๐™š๐™ฅ ๐™˜๐™–๐™ก๐™ก๐™ž๐™ฃ๐™œ ๐™—๐™–๐™˜๐™ .
Graham is one of those people.

After starting with Nobles as a Lifting & Rigging Inspector, Graham made the move into Stores to be closer to home and support his family. It did not take long for his leadership to stand out, progressing quickly into the Stores Team Leader role.

But the road was calling.

Graham eventually returned to the field as a Lifting & Rigging Inspector, where he continues to represent Nobles to the highest standard every day.
Straight shooter. Strong work ethic. Customer favourite.

The kind of person who earns trust by how he shows up, not by talking about it.

A great achievement and a well-deserved recognition of the impact Graham continue to make across the business and for our clients.

20/04/2026

We are thrilled to officially welcome Gavin Braam to the fold as our new Crane Service Supervisor. Gavin brings a wealth of experience to the floor, and heโ€™s already hit the ground running with two of our newest crane tech recruits, Jayrald and Macario.

At Nobles we are proud to have a high-quality Crane Service team trusted by our clients and the industry.

Photos from Nobles's post 08/04/2026

๐—ข๐˜‚๐—ฟ ๐˜๐—ฒ๐—ฎ๐—บ ๐—ฟ๐—ฒ๐—ฐ๐—ฒ๐—ป๐˜๐—น๐˜† ๐—ฐ๐—ผ๐—บ๐—ฝ๐—น๐—ฒ๐˜๐—ฒ๐—ฑ ๐˜„๐—ถ๐—ฟ๐—ฒ ๐—ฟ๐—ผ๐—ฝ๐—ฒ ๐—ฐ๐—ต๐—ฎ๐—ป๐—ด๐—ฒ๐˜€ ๐—ผ๐—ป ๐—ฐ๐—ผ๐—ป๐˜ƒ๐—ฒ๐˜†๐—ผ๐—ฟ ๐—š๐—ฟ๐—ฎ๐˜ƒ๐—ถ๐˜๐˜† ๐—ง๐—ฎ๐—ธ๐—ฒ ๐—จ๐—ฝ (๐—š๐—ง๐—จ) ๐˜‚๐—ป๐—ถ๐˜๐˜€.

This is a multi-step process, and care is taken at every stage to ensure a safe, precise result. From releasing tension and removing the existing rope, to pulling the new rope through the sheave system and preparing the drum, the change-out is completed methodically before final terminations are secured.

As is often the case, we worked closely with other contractors within the exclusion zone. Working in close proximity means clear communication and coordination is always a priority for the team.

During the shutdown, a damaged wire rope was identified, allowing the team to work with the client to address it early, helping to avoid additional costs and future downtime.

25/03/2026

๐Œ๐จ๐ฌ๐ญ ๐ฉ๐ž๐จ๐ฉ๐ฅ๐ž ๐ฌ๐ž๐ž ๐ญ๐ก๐ž ๐œ๐จ๐ง๐ฏ๐ž๐ฒ๐จ๐ซ ๐ซ๐ฎ๐ง๐ง๐ข๐ง๐ .
๐…๐ž๐ฐ ๐ฌ๐ž๐ž ๐ญ๐ก๐ž ๐†๐“๐”๐ฌ ๐ญ๐ก๐š๐ญ ๐ฆ๐š๐ค๐ž ๐ข๐ญ ๐ฉ๐จ๐ฌ๐ฌ๐ข๐›๐ฅ๐ž.

Out on site, the team carrying out inspection and servicing of GTUs at height, ensuring everything stays aligned, lubricated and operating as designed.
GTUs operate under load and exposure every day. Regular inspection helps identify wear early, maintain alignment and prevent premature failure. Itโ€™s the difference between planned maintenance and unexpected downtime.

๐€๐ง๐ ๐ข๐ญโ€™๐ฌ ๐ง๐จ๐ญ ๐ฃ๐ฎ๐ฌ๐ญ ๐š๐›๐จ๐ฎ๐ญ ๐ญ๐ก๐ž ๐œ๐จ๐ฆ๐ฉ๐จ๐ง๐ž๐ง๐ญ๐ฌ.
โ€ข Working at height.
โ€ข Barricaded drop zones.
โ€ข EWP access.
โ€ข Controlled work area.

Good maintenance starts long before the tools come out. Itโ€™s not flashy work but itโ€™s critical work. And when itโ€™s done properly, operations keep moving without interruption.

Contact Us: https://loom.ly/aY3fDAk

Photos from Nobles's post 16/03/2026

๐—ช๐—ต๐—ฒ๐—ป ๐˜€๐—ผ๐—บ๐—ฒ๐˜๐—ต๐—ถ๐—ป๐—ด โ€œ๐—ท๐˜‚๐˜€๐˜ ๐—ฑ๐—ผ๐—ฒ๐˜€๐—ปโ€™๐˜ ๐—ณ๐—ฒ๐—ฒ๐—น ๐—ฟ๐—ถ๐—ด๐—ต๐˜โ€, ๐—ถ๐˜ ๐˜‚๐˜€๐˜‚๐—ฎ๐—น๐—น๐˜† ๐—ถ๐˜€๐—ปโ€™๐˜.

Todayโ€™s find: a main hook block that wouldnโ€™t rotate freely.

Inspection revealed a thrust bearing installed incorrectly, causing excess play and the hook shaft to jam against the housing. Stripped down, cleaned up and rebuilt properly. Operating as it should.

Anyone else found an issue that came down to a simple install detail? ๐Ÿ‘‡

10/03/2026

๐—ง๐—ต๐—ฒ ๐—ฏ๐—ฒ๐˜€๐˜ ๐—ฏ๐—ฟ๐—ฒ๐—ฎ๐—ธ๐—ฑ๐—ผ๐˜„๐—ป ๐—ถ๐˜€ ๐˜๐—ต๐—ฒ ๐—ผ๐—ป๐—ฒ ๐˜๐—ต๐—ฎ๐˜ ๐—ป๐—ฒ๐˜ƒ๐—ฒ๐—ฟ ๐—ต๐—ฎ๐—ฝ๐—ฝ๐—ฒ๐—ป๐˜€.

Itโ€™s not the loud, urgent jobs that keep operations running, itโ€™s the planned ones done properly.

On a recent site visit, our team replaced all worn brake components on a clientโ€™s critical crane as part of their scheduled maintenance. If you work around cranes, you know brake systems arenโ€™t something you โ€œkeep an eye onโ€, you change them when itโ€™s time.

Photos from Nobles's post 03/03/2026

๐—˜๐˜ƒ๐—ฒ๐—ฟ ๐—ต๐—ฎ๐—ฑ ๐—ฎ ๐—ฐ๐—ผ๐—ป๐˜ƒ๐—ฒ๐˜†๐—ผ๐—ฟ ๐—ฟ๐—ผ๐—ฝ๐—ฒ ๐—ณ๐—ฎ๐—ถ๐—น ๐—ฎ๐˜ ๐˜๐—ต๐—ฒ ๐˜„๐—ผ๐—ฟ๐˜€๐˜ ๐—ฝ๐—ผ๐˜€๐˜€๐—ถ๐—ฏ๐—น๐—ฒ ๐˜๐—ถ๐—บ๐—ฒ?

230 metres of 36mm wire rope removed and replaced safely and efficiently by the team on site in WA.

The kind of job that looks straightforward on paper, but anyone whoโ€™s handled rope that size knows the planning, control and teamwork it takes.

If you work in maintenance or shutdowns, you know the feeling when the new rope is finally tensioned and tracking right.

Photos from Nobles's post 25/02/2026

๐—ฅ๐—ฒ๐—ฑ ๐—ฑ๐—ถ๐—ฟ๐˜. ๐—ฆ๐˜๐—ฒ๐—ฒ๐—น. ๐—”๐—ป๐—ฑ ๐—ด๐—ฒ๐˜๐˜๐—ถ๐—ป๐—ด ๐˜๐—ต๐—ฒ ๐—ท๐—ผ๐—ฏ ๐—ฑ๐—ผ๐—ป๐—ฒ.

Out on site in WA, the Nobles team supporting our client with heavy-duty wire rope handling and install. No fuss, just solid work done safely, on the ground, in the dust, under structure, making sure everything is lined up, tensioned right, and ready to perform.

Photos from Nobles's post 16/02/2026

๐—ฆ๐˜‚๐—ป๐—ฑ๐—ฎ๐˜†... ๐—ฏ๐˜‚๐˜ ๐—ฏ๐—ฟ๐—ฒ๐—ฎ๐—ธ๐—ฑ๐—ผ๐˜„๐—ป๐˜€ ๐—ฎ๐—ป๐—ฑ ๐—บ๐—ฎ๐—ถ๐—ป๐˜๐—ฒ๐—ป๐—ฎ๐—ป๐—ฐ๐—ฒ ๐—ฑ๐—ผ๐—ปโ€™๐˜ ๐—ฐ๐—ต๐—ฒ๐—ฐ๐—ธ ๐˜๐—ต๐—ฒ ๐—ฐ๐—ฎ๐—น๐—ฒ๐—ป๐—ฑ๐—ฎ๐—ฟ.
Todayโ€™s task: replacing a damaged 5-tonne auxiliary hoist rope, 35 metres up.
โ€ข Barricaded drop zone.
โ€ข Strip down.
โ€ข Inspection.
โ€ข Clean-up.
โ€ข Reinstall.
โ€ข Limits reset.
โ€ข Test runs.

Back in service safely.

๐—ง๐—ฎ๐—ธ๐—ฒ๐—ฎ๐˜„๐—ฎ๐˜†
More grease isnโ€™t always better. Over-lubrication leads to premature wear on rope guides.

If youโ€™ve spent a weekend on the ropes, drop a ๐Ÿ‘‹ We see you ๐Ÿ˜Š

18/12/2025

๐ŸŽ„ Seasonโ€™s Greetings from everyone at Nobles! ๐ŸŽ„

Thank you to our clients, suppliers, and our dedicated team for a strong 2025.

Wishing you a safe holiday season, see you in 2026! โœจ

Please note: Our offices will be closed from 22 December 2025 and we'll reopen on Monday 5 January 2026.

Want your business to be the top-listed Contractor in Gepps Cross?
Click here to claim your Sponsored Listing.

Address


24-30 Kaurna Avenue
Gepps Cross, SA
5111

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm