Our specialist glazing team recently completed a curved glass panel replacement at Maroochydore Private Hospital, safely accessing the facade via rope access techniques to minimise disruption and ensure an efficient installation.
A great effort from the team on a challenging project, showcasing the skill and professionalism that goes into every job.
26/05/2026
Our team recently completed a complex vortex pole setup and material hoisting operation on a 16 storey building.
This project highlights the importance of specialised rope access, rigging expertise, and detailed lift planning when operating in high rise environments.
services
14/05/2026
Another reglaze completed via rope access. Delivering safe, efficient results where access is anything but easy. From big heights to precise finishes, our team gets the job done right every time.
The reglaze work has been keeping us busy lately - and we wouldn’t have it any other way.
14/05/2026
Changing up the scenery a bit.
This week we sent part of our team out to a power station to complete structural bracing inspections and documentation of support framing of the cooling towers and rectification.
07/05/2026
Another day, another successful reglaze via rope access.
29/04/2026
Precision in motion at every level.
Using advanced vortex poles, our team is efficiently hauling and positioning materials along the building facade —minimizing disruption while maximising safety and control. High-rise challenges demand smart solutions, and this is exactly what our crew has done here, well done team.
28/04/2026
Another successful glass haul and reglaze completed by the team at Toowong
22/04/2026
Delivering precision at every level - our team completing essential waterproofing works for long term durability and protection.
20/04/2026
Our team completing lift shaft works over the weekend, working closely with contractors to safely manage and assist in the controlled lowering of heavy counterweights within the shaft.
31/03/2026
Our team safely lifted and installed a 300kg panel today. No shortcuts, just skilled operators, the right equipment, and a strong focus on safety every step of the way.