MatNash Construction PVT LTD
Your Dreams Our Project

Happy sunday to you all!!!

Square tube frames
Square tube frames are better known as Aluminum imitation-steel frames.
These steel frames are more preferred than aluminium frames over the following advantages
- they are cheaper than aluminium
- they are stronger than aluminium hence they provide better security.
- they can be reused in cases of renovations
-they come with burglar bars
-they still give than expensive look although they are cheaper than aluminium.
For all your door and window frames kindly contact us on 0774302228_0712023418.
Other products: veranda screens, pallisade fencce, sliding gates, tank stands, laundry lines, fencing poles
Your Dreams Our Project

WHY YOU NEED A PROJECT MANAGER:
1. Expertise and Experience: Building professionals, such as architects, engineers, or project managers, bring specialized knowledge to ensure the design, planning, and ex*****on meet industry standards. Their experience helps in handling complex issues that may arise during construction.
2. Quality Control: A professional ensures that the materials, workmanship, and construction methods meet the required quality standards, preventing issues such as structural defects or safety hazards.
3. Regulatory Compliance: Professionals are familiar with local building codes, zoning laws, and other regulations. They ensure the project complies with legal requirements, which reduces the risk of fines, delays, or having to redo work.
4. Budget Management: A professional can help with cost estimation, resource allocation, and maintaining the budget throughout the construction process. They can also identify potential cost overruns early and implement corrective measures.
5. Time Management: Professionals can create and monitor project timelines, ensuring that tasks are completed on schedule and that delays are minimized. Their oversight helps prevent unnecessary disruptions and ensures the project progresses smoothly.
6. Problem Solving: Construction projects often encounter unexpected challenges. A professional can quickly identify problems and implement solutions, minimizing disruptions to the project timeline and cost.
7. Safety: Supervising professionals ensure that the construction site adheres to health and safety standards, reducing the risk of accidents and ensuring the well-being of workers and visitors.

🛑 THE 3-4-5 METHOD 🏗️
👉🏻 is an essential technique in the construction and civil engineering fields to accurately trace right angles on construction sites. Based on the Pythagorean theorem, it guarantees the orthogonality of structures, ensuring their stability and proper alignment.
Application of the 3-4-5 method:
1. Measurement: Starting from an origin point, measure 3 units along a reference line and mark this point.
2. Second measurement: From the origin point, measure 4 units perpendicularly to the first line and mark this point.
3. Verification: Measure the distance between the two marked points; it should be 5 units. If this is the case, the angle formed is a right angle.
This method is particularly useful for laying foundations, aligning walls, and verifying the perpendicularity of structural elements. It is simple to implement and only requires basic tools such as a tape measure.

800 metres five (5) strand barbed wire on steel poles done in Nyanga.
Secure your properties with us!!!
Modern Suspended Ceilings
Advantages suspended ceilings:
Soundproofing
Suspended ceilings can improve the acoustics of a room by reducing sound coming from roofing sheets
Easy light installation
Lights, fans, and other overhead appliances can be easily installed in or integrated into suspended ceiling panels.
Resistance to moisture and mold
Some suspended ceiling tiles are treated to be moisture-resistant and are resistant to bacteria, mold, and mildew.
Affordable
Suspended ceilings are a less expensive and less arduous option than completely renovating a building's interior.
Easy to detach for repairs
It's easier to access suspended ceiling panels if any components need to be replaced or repaired.

Secure your fields in this farming season.
Musadyise minda nemombe we are here to protect your fields.

Thank you Mr Hove.
1.8m Diamond mesh 2.5mm fence with 3 strand barbed wire overhead installed in Kamba Village, Rusape (Nyabadza area)
Total perimeter covered 270 metres (fix and supply)
Basa mangwanani!
Click here to claim your Sponsored Listing.
Videos (show all)
Category
Contact the business
Telephone
Website
Address
Robert Mugabe Street
Mutare