AF III Construction
Remodeling company with over 10 years in the field. Licensed and insured. We make it our business to
11/24/2025
Remove tile floor/shower surround and replace with onyx and new vinyl flooring.
11/20/2025
Ripped out carpet laid new flooring built 2 walls with doors
11/12/2025
Master bath reconfiguration with new floor and paint. Removed jetted tub for more counter space and replaced vanity as well as moved toilet a couple inches to maximize shower space.
07/26/2025
Hall bath remodel. Closet delete to expand shower. Swapped tub and vanity location, added 2 pocket doors and a custom shelf insert
03/22/2025
Quick lil one day, remove soffit, replace floor, new wall system and faucet
02/25/2025
Reconfigured master bath. Removed whirlpool bath tub and built shower, removed small shower and built a tub system. Moved toilet and expanded vanity.
12/20/2024
Quick little replumb
12/18/2024
Onyx shower with extra security
12/07/2024
New walls and faucet with soffit removed, kept the tub
10/30/2024
Deck rebuild using dexerdry and composite. Easy way to keep the underside bone dry without a ceiling.
10/08/2024
Tub to shower
08/15/2024
Nothing wrong with trying. But if you’ve bitin off more than you can chew we can pick up where you left off and give your diy project a boost to get you back on track.
Click here to claim your Sponsored Listing.