Clover Bottom Construction
Clover bottom construction was started June 2021. New construction and remodel.
07/29/2023
Itβs amazing how much the look of a room changes with a few faux beams.
07/29/2023
Large great room at LAKE OF THE OZARKS. Full T&G ceiling with beams at the peaks.
07/29/2023
T&G ceiling creates an amazing look.
07/29/2023
Load bearing wall removed and replaced with inverted beam above ceiling level. Creates a great looking larger room.
07/29/2023
Storage building for local buisness. 32β X 40β with 14β ceilings and loft on left side for more storage.
07/29/2023
Addition onto a house to expand kitchen and create a work space and garage for homeowners
07/29/2023
Back patio roof addition to create a beautiful outdoor kitchen and entertainment space.
07/29/2023
Trusses and beams installed for front entry and back pool patio.
07/29/2023
Barndominum for horse farm and interior stalls.
07/29/2023
Master bathroom tile shower and pan. Mosaic floors.
Click here to claim your Sponsored Listing.