Micah Botica

Micah Botica

Share

Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Micah Botica, Carpenter, Simi Valley, CA.

Photos from Micah Botica's post 01/01/2021

Well you know...since I’m not busy getting other projects done I whipped up a couple cutting boards. These are made out of maple with walnut accents. I may or may not keep these. DM me if you are interested in one or both. @ Simi Valley, California

Photos from Micah Botica's post 12/30/2020

Doing a little hybrid woodworking on for these stop dados. The router leaves a rounded edge and need to be squared off to accept the panel.

Photos from Micah Botica's post 12/22/2020

Not only did i make a sign this weekend but I also got all the drawers installed in the cabinet. Including the mega drawer at the bottom. Feels good to have the cabinet fully functional. Now to build 4 doors and a drawer face. The end is in sight.

Photos from Micah Botica's post 12/21/2020

Had a pretty productive weekend. My brother had been asking me to make this sign for over a year and I promised him I would get it done before Christmas. Well mission accomplished, I’ve got 4 days to go. 😂 This is the first time I’ve created an engraved sign like this. Used 5/4 red oak to make the 30”x12” sign. My brother will be painting the letters to match the cabin paint and the surface will receive a clear coat. What last minute gifts are you all working on?

Photos from Micah Botica's post 11/30/2020

Made a lot of progress on the cabinet this weekend including knocking out this behemoth of a drawer. Dimensioned at 38”x 19”x 8”. Also learned a valuable lesson to always check the collet height on the router table. I adjusted my rabbiting bit up and didn’t notice the collet was above the table. Luckily this didn’t ruin the drawer but made an ugly burn/groove on the bottom of the drawer.

Photos from Micah Botica's post 11/28/2020

Got a little distracted playing with shadows.

Photos from Micah Botica's post 11/16/2020

I was able to knock out all the drawers for the cabinet this weekend. Well at least the dovetails. Still need to cut the dado for the bottoms and do some finish sanding. Slowly making progress.

Photos from Micah Botica's post 10/19/2020

Did a little testing for the drawers this weekend making half-blind dovetails. A slight adjustment and these will be ready to batch out.

10/12/2020

After a little bit of wall painting the cabinet is FINALLY installed. Really happy with the choice of going two tone. The contrast adds a lot more visual interest. Next up... need to build six pullout trays and one large bottom drawer.

Photos from Micah Botica's post 09/28/2020

While demoing the kitchen cabinet this weekend we discovered a little blast from the past. Wall paper and linoleum tiles circa 1960’s?

09/26/2020

Final coat has been applied. Now time to install 😳🤞

09/14/2020

Finally making some progress on the kitchen pantry/floor to ceiling cabinet. I’ve got some finish sanding and a final coat to do but it’s coming along nicely. Can’t wait to get this beast out of the garage.

Want your business to be the top-listed Contractor in Simi Valley?
Click here to claim your Sponsored Listing.

Category

Website

Address

Simi Valley, CA
93065