Newport Industrial Fabrication

Newport Industrial Fabrication, Inc. (NIF) was incorporated in 1997. The company has grown from a ha NIF specializes in custom metal fabrications.

Our skill, size and flexibility allow us to supply a wide range of cost effective and on schedule products. We have supplied custom shoring, formwork, and access platforms to many large construction projects from Maine to Virginia. We also supply specialized structural steel such as rail station canopies, specialized trusses, and other non-traditional beam and column steel. NIF can also put on the

Photos from The Shed's post 01/25/2022

Check out the The Shed's sneak peek of their upcoming art exhibit, featuring Newport Industrial Fabrication steel framing!

Photos from Newport Industrial Fabrication's post 05/13/2021

Steel mullions to support a glass atrium curtain wall made right here in Newport, Maine.

Photos from Newport Industrial Fabrication's post 05/07/2021

Thermal spraying aluminum nonskid metalizing onto diamond plate for marine use.
✅Long term corrosion protection even in harsh environments
✅Less susceptible to damage than paint
✅No curing time

05/03/2021

Clearing the floor for this 78' architectural bow truss.

Timeline photos 03/22/2021

Timeline photos

The Frances Appleton Pedestrian Bridge is the longest bridge span over Boston's Storrow Drive, connecting the city to the riverfront. The crossing is also higher than any other existing bridge along the highway corridor, opening views and incorporating appropriate vertical clearances. Learn more about this 2020 Prize Bridge winner at bit.ly/3r7BjCb

08/09/2019

NOW HIRING

Newport Industrial Fabrication, LLC is seeking qualified individuals for openings in our fabricating and coatings facilities. We offer competitive wages based on experience, medical insurance and a safe and healthy work atmosphere. We are currently accepting applications for entry level trainee’s wanting to learn a craft in our industrial painting and sandblasting facility for our day and night shift.

Newport Industrial Fabrication requirements are as follows:
-Be at work on time for the start of each shift
-Follow all safety rules
-Complete work activities per the directions given
-Be able to lift 50 LBS
-A valid driver’s license is preferred

Job Type: Full-time
Salary: $13.00 to $18.00

Apply online here: https://goo.gl/forms/RdrWZmvIYj7wA6HB2

Or

Stop by during normal business hours and fill out an application.

04/20/2019

The finishes for the Riverside Nexus project are coming together. Great work!

The new architectural ceiling at Waterline Square by Jaroff Design

09/25/2018

Check out this time-lapse of the Aquarium of the Pacific installation. The glass support steel was fabricated in Newport, Maine and installed in Long Beach, California!

08/23/2018

Aquarium of the Pacific is coming together!

08/13/2018

Check out one of the incredible steel structures produced right here in Newport Maine.

Enclos - Serpentine Canopy 08/08/2018

Enclos - Serpentine Canopy

06/21/2018

Hey, look! AISC is promoting AESS fabrication. Those samples look familiar! 😉

Who's attending this week!? Tabitha Stine & Jacinda Collins will be talking about everything AESS & we'll have five samples to check out! Booth #813 >> More info: http://ow.ly/tY9w30kAbT0

05/31/2018

***NOW HIRING*** PAINTER WANTED: Industrial Painting, Media Blasting, Sophisticated Coatings, and Thermal Spray. Past experience prefered but not required. Willing to train the right applicant.

Please fill out our online application here: https://goo.gl/forms/RdrWZmvIYj7wA6HB2

ellsworthamerican.com 05/15/2018

Blue Hill company builds bridges for Manhattan sky-rises

ellsworthamerican.com BLUE HILL — Hewes & Company is nearing completion on cladding for steel pedestrian bridges that will connect three luxury sky-rise buildings on Rivers

04/11/2018

Ferrell Engineering, Inc.

Cleaning up the office and found an old project on a magazine cover. Education First, glass “waterfall” exterior wall. Boston 2015

aisc.org 03/27/2018

Modern Steel Construction

MSC "Steel Shot" covering Hunter's Point structure. Go team NIF!

aisc.org A 100-ft-long steel truss structure was recently lifted into place as an elevated deck and viewing platform central to the Hunter’s Point South redevelopment project in New York City. One of the most ambitious waterfront projects in the city’s history, engineering and consulting firm Arup is wor...

google.com 02/16/2018

Google Maps

Take a stroll across Burns Bridge on Google street view and check out some NIF steel.

(4) Large “Sails” made from 10” pipe and seven miles of ¼” stainless cable
(4) Curved granite stands
(6) Steel canoes
(535) Linear feet of picketed guardrail
(2300) Linear feet of traffic curb rail
(1) Helical hand rail

google.com

02/14/2018

Hewe's putting the final touches on the first Nexus bridge

Finalizing the first part of the bridge project. Now it's getting exciting!

01/24/2018

Hunter's Point Overlook is coming in for a landing!

Hunter's Point South - Outlook 01/24/2018

Scenic outlook in NYC

Riverside Nexus 01/24/2018

Riverside Nexus pedestrian bridges and spiral stair.

Riverside Nexus 12/28/2017

Riverside Nexus pedestrian bridges and spiral stair.

12/16/2017

Newport Industrial Fabrication

12/16/2017

Newport Industrial Fabrication's cover photo

12/14/2017

15 Tons of Spiral Stairs moved with the help of T & W Garage, Inc.

Longfellow Pedestrian Bridge 11/22/2017

550' Steel Super Structure, 220' Pipe Arch, (2) Spiral Stairs and Esplanade Viewing Area with a Metalized / Epoxy / Polysiloxane Finish

11/18/2017

Continued progress on Longfellow!

11/10/2017

Check out Modern Steel Construction's cover story, more NIF steel! In this month's addition, MSC describes the intricacies of AESS fabrication. Who better to provide AESS samples?

http://digitaleditions.walsworthprintgroup.com/publication/?i=445225&ver=html5&p=42

11/08/2017

Longfellow arches going into position

As part of the Longfellow Bridge project in and , a major milestone is reached.

New steel arches are now in place for the Frances “Fanny” Appleton Bridge over Storrow Drive. The new Appleton Bridge will provide and access between the and Charles Circle, replacing the old, structurally deficient pedestrian bridge.
http://www.massdot.state.ma.us/charlesriverbridges/LongfellowBridge.aspx

10/27/2017

Longfellow Arches southbound with Casco Bay Transportation

10/25/2017

Two arch sections ready for the Longfellow Pedestrian Bridge: 220' span, 18" API pipe, +125,000lbs of steel, 64 custom fit spandrel columns, TSC / Epoxy / Polysiloxane finish

Destination Storrow Drive, Boston for a weekend / night installation

Gallagher Pedestrian Bridge Walkway 08/31/2017

Two 140 ft Pedestrian Bridge connecting the Charles A. Gallagher Intermodel Transportation Center to the new Thorndike Exchange development.

enr.com 08/08/2017

The Agonies of Building Atlanta's Mercedes-Benz Stadium

Our friends at Ferrell Engineering have been hard at work supporting the Falcon's new stadium connection design! Ferrell has helped NIF on the Waterfall, Sails and Hunter's Point. Next time maybe NIF can catch a piece of the action! 👏 😉

enr.com The ups and downs of designing and constructing an exotic convertible stadium roof

06/16/2017

Enclos - Serpentine Canopy

Hunter's Point South - Outlook 06/08/2017

Scenic outlook in NYC

Videos (show all)

Check out this time-lapse of the Aquarium of the Pacific installation. The glass support steel was fabricated in Newport...
Check out one of the incredible steel structures produced right here in Newport Maine.
***NOW HIRING*** PAINTER WANTED: Industrial Painting, Media Blasting, Sophisticated Coatings, and Thermal Spray. Past ex...
Longfellow TGA Flip
220 CPS shop in action!
NIF and CCB are teaming up to go after this 450' shade structure for Mill River Park in Stamford Connecticut. With any l...
NIF Summer Outing fun!
ORPC's TidGen chassis with turbines mounted! Steel & paint work by NIF!
The tidal generation chassis leaving the yard heading for Eastport Maine
16'x100' Load to Conn.
16'x100' load to Conn.
16'x 100' crane heading to Conn.

Telephone

Address


445 Elm Street
Newport, ME
04953

Opening Hours

Monday 7am - 3:30pm
Tuesday 7am - 3:30pm
Wednesday 7am - 3:30pm
Thursday 7am - 3:30pm
Friday 7am - 3:30pm

Other Construction Companies in Newport (show all)
NS Building Solutions NS Building Solutions
Newport, 04953

Specializing in galvanized steel buildings. Providing fully engineered building packages and service.

RA Paradis & Son, Inc RA Paradis & Son, Inc
81 Blaisdell Road
Newport, 04953

Excavation, Trucking and Snow Removal Services Excavation Services Include: Residential Services:

Newport Structures LLC Newport Structures LLC
14 Grogin Avenue
Newport, 04953

Bowman Constructors Bowman Constructors
552 Moosehead Trl
Newport, 04953

Bowman Constructors is a commercial construction company serving the state of Maine.

Clark's LLC Clark's LLC
607 Elm Street
Newport, 04953

Repair and Maintenance for all Heavy Duty Truck, Equipment, Trailers, Light Duty Trucks, Vans, and Cars. Customized Welding and Repair, Site Prep, Leach Fields, Land Clearing, Exca...

Newport Structures LLC Newport Structures LLC
14 GROGIN Avenue
Newport, 04953

Newport Structures builds and delivers quality portable storage buildings, Garages, Work shops,and Garden sheds. We also offer full galvanized steel framed warehouses, Garages, and...