GWB Carpentry
Carpentry Frame to Finish, specializing in renovations. Kitchens, and bathrooms
04/12/2026
Bathroom remodel, new sink, heated tile floor, shower, shower door and Sheetrock. New insulation on the exterior wall.
Thanks for the business Steve!
12/13/2025
Another spring project, replaced the old set of stairs after rip rap was placed. New walkway and stairs to the ocean. 2x12x24’s for stringers
Thank you for the business
11/13/2025
Last winter job, replaced 9 storm windows with new Mathews Brothers Company double hung windows. Also put in a new Anderson storm
Door.
Thanks for the repete business!
09/06/2025
Spring Decking replacement. The old decking was past its lifetime and needed replacement. When the decking was removed it was discovered that the joists were due for replacement as well. New trex pebble gray was installed, railings were reused due to being in good shape.
Thanks for the business!
08/23/2025
Project from early this spring. New siding, trim coil facia and soffit. Certainteed forest green vinyl siding. Added a small eye brow roof on the front to shed water away from the sliding glass door.
Thank you for the business
11/23/2024
New 12’x19’ deck and 4’x8’ covered porch.
Thank you for the business!
Look forward to future projects
11/10/2024
14 Window replacements. One of the biggest window jobs to date. The old windows were fixed pane windows unable to open. There was a lot of rot repair on this job. We lowered the middle window on the gable to allow a better view. The new Mathew’s brother’s windows are a huge upgrade with the double hung windows.
Thank you for the business Dave and Evelyn!
11/04/2024
Very glad to be apart of this project thank you Kate Michaud Photography
10/13/2024
New cedar shakes with woven corners. Replaced 2 doors as well.
Thank you for the business Mark and Sandy
Look forward to the next project
08/27/2024
New back deck, French door stairs and front porch. Decking timber tech vintage mahogany and Versatex risers. Old decks and stairs were in need of replacement.
Thanks for the business Ben and Lynn
07/16/2024
Completed 24x25 steel garage. This was a first for putting together a steel building. Walls are 13’ tall at the eve and 14’-6” at the middle. Very strong building.
Thank you for the opportunity to put the garage together, enjoy the building Brian.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
04330
Opening Hours
| Monday | 7am - 5pm |
| Tuesday | 7am - 5pm |
| Wednesday | 7am - 5pm |
| Thursday | 7am - 5pm |
| Friday | 7am - 5pm |