Soil Nailing Procedure
Soil nailing is a construction technique used to stabilize slopes, excavations, or retaining walls by reinforcing the soil mass. The method involves inserting closely spaced steel bars (nails) into the soil, which are then grouted into place, creating a composite mass that can resist the forces acting on it. Here's a step-by-step procedure for soil nailing:
1. Site Preparation
Survey and Design: Conduct a site survey to analyze the slope or wall and develop a design that specifies the length, diameter, spacing, and inclination of the soil nails based on soil conditions.
Excavation: Excavate the area in stages (called lifts) to the required depth. Each excavation is typically around 1 to 2 meters at a time to maintain stability.
2. Drilling Holes for Soil Nails
Drill Holes: Bore horizontal or slightly inclined holes (typically 10 to 20 degrees from horizontal) into the soil or rock mass. The diameter of these holes depends on the design but is usually between 75 mm and 150 mm.
Hole Length: The length of the hole corresponds to the design requirements for the depth of the nails, typically 3 to 10 meters, depending on site conditions and design.
3. Inserting the Nails
Steel Nails: Insert steel bars (commonly 25 to 40 mm in diameter) into the pre-drilled holes. The bars may be ribbed or deformed to enhance bonding with grout.
Corrosion Protection: If needed, provide corrosion protection for the nails, either by galvanizing the steel or applying epoxy coatings. Double corrosion protection is typically recommended in aggressive environments.
4. Grouting the Nails
Grout Injection: Inject grout (usually a cement-based mix) into the hole around the soil nail to bond the steel to the surrounding soil or rock. The grout is pumped under pressure to ensure full encapsulation and strength.
Grouting Techniques: There are two main grouting techniques:
Gravity Grouting: Gravity-based injection of grout, typically used for stable soils.
Pressure Grouting: Involves pumping grout under pressure for better soil contact and strength.
5. Facing Installation
Temporary Facing: Apply a temporary facing, such as shotcrete, wire mesh, or steel plates, to maintain stability during construction. Shotcrete is typically sprayed onto the excavated surface and nails to provide immediate support.
Permanent Facing: Once all nails are installed and stabilized, apply a permanent facing (shotcrete, cast-in-place concrete, or precast panels) to protect the surface and ensure long-term stability.
6. Drainage Installation
Drainage Provisions: Install drainage systems (such as weep holes or drainage mats) behind the facing to manage water buildup, which can cause pressure behind the soil nails and reduce effectiveness.
7. Monitoring and Testing
Pullout Tests: Perform pullout tests on some of the nails to ensure that they meet design strength requirements.
Monitoring: Continuously monitor the wall or slope for movement and stress on the nails during and after construction.
8. Final Finishing
Finishing: Once the nails and facing are in place and the structure is stabilized, apply finishing treatments, such as paint, protective coatings, or landscaping to improve aesthetics and further protect the system.
Key Considerations:
Soil Conditions: Proper geotechnical investigation is essential for understanding the soil type, water table, and other factors that influence nail design.
Nail Spacing and Inclination: These factors depend on the forces acting on the wall or slope and are determined during the design phase.
Safety: Ensure that the excavation is stable at all times to protect workers and avoid collapses.
Soil nailing is a highly adaptable and effective method for slope stabilization, particularly in urban areas where space is limited, and traditional retaining walls are not feasible.
11/03/2024
Last March 9, 2024, ACI Philippines held the ๐๐๐ญ๐ก๐ญ๐๐ค๐ข๐ง๐ ๐๐๐ซ๐๐ฆ๐จ๐ง๐ฒ ๐๐ง๐ ๐๐๐ง๐๐ซ๐๐ฅ ๐๐๐ฆ๐๐๐ซ๐ฌ๐ก๐ข๐ฉ ๐๐๐๐ญ๐ข๐ง๐ at the Great Eastern Hotel, 1403 Quezon Avenue, Quezon City, Philippines.
During the event, ๐๐ง๐ ๐ซ. ๐
๐ซ๐จ๐ข๐ฅ๐๐ง ๐๐๐ซ๐ญ๐ข๐ฅ๐ฅ๐๐ง๐จ celebrated his three excellent years leading ACI Philippines as the President.
A warm welcome also extends to the ๐ฃ๐๐ฌ๐ก๐ฎ ๐๐ฃ๐๐ช๐๐ฉ๐๐ ๐ผ๐พ๐ ๐๐๐๐ก๐๐ฅ๐ฅ๐๐ฃ๐๐จ ๐ฝ๐ค๐๐ง๐ ๐ค๐ ๐๐ง๐ช๐จ๐ฉ๐๐๐จ for the fiscal years 2024-2026.
๐๐ซ๐๐ก. ๐๐๐ฏ๐ข๐ฅ๐จ๐ซ ๐๐ฅ๐๐ง๐จ leads as the new ๐๐ซ๐๐ฌ๐ข๐๐๐ง๐ญ with the ๐๐๐๐ ๐๐ข๐ซ๐๐๐ญ๐จ๐ซ๐ฌ, ๐๐ง๐ ๐ซ. ๐๐ก๐ซ๐ข๐ฌ๐ญ๐ข๐๐ง ๐๐ซ๐จ๐ณ๐๐จ, ๐๐ง๐ ๐ซ. ๐๐ฅ๐ฅ๐๐ง ๐๐๐ง๐จ๐ ๐ฌ๐ฎ๐๐๐ง, ๐๐ฌ. ๐๐ข๐ง๐ ๐๐๐ช๐ฎ๐ข๐ง๐จ๐ฅ, ๐๐ง๐ ๐ซ. ๐๐ข๐ฅ ๐๐ซ๐ฎ๐ณ, ๐๐ง๐ ๐ซ. ๐๐๐ฐ๐ข๐ง ๐๐๐๐๐ซ๐๐๐ , ๐๐ง๐ ๐ซ. ๐๐ฎ๐ง๐๐ฅ ๐๐จ๐ฆ๐๐ซ๐จ, ๐๐ง๐ ๐ซ. ๐๐๐ง๐ข๐ฅ๐จ ๐๐จ๐ฆ๐ข๐ง๐ ๐จ, ๐๐ง๐ ๐๐ซ. ๐๐ฏ๐๐ซ๐ข๐ฌ๐ญ๐จ ๐๐๐ฌ๐ช๐ฎ๐๐ณ.
Also with them are now the unwavering ex-officio, the ๐ฅ๐๐จ๐ฉ ๐ฅ๐ง๐๐จ๐๐๐๐ฃ๐ฉ๐จ ๐ค๐ ๐ผ๐พ๐ ๐๐๐๐ก๐๐ฅ๐ฅ๐๐ฃ๐๐จ - ๐๐ฃ๐๐ง. ๐๐ง๐ค๐๐ก๐๐ฃ ๐๐๐ง๐ฉ๐๐ก๐ก๐๐ฃ๐ค, ๐๐ฃ๐๐ง. ๐๐๐ข๐ค๐ฃ ๐ผ๐ก๐ก๐๐๐ค ๐๐ฃ๐ ๐๐จ. ๐๐ก๐ก๐๐ฃ ๐พ๐๐ช๐.
With them at the helm, ACI Philippines will continue to advance to the greatest heights. ๐๐๐ง๐ ๐๐ฉ ๐ผ๐พ๐, ๐ฌ๐ ๐๐ง๐ ๐๐ก๐ฌ๐๐ฎ๐จ ๐๐๐ซ๐๐ฃ๐๐๐ฃ๐!
29/11/2023
Learn the techniques for becoming a top Construction Project Manager in 2023 with ! ๐คฉ
Be equipped in the latest trends and modern strategies for managing construction projects.
Join our ๐ฏ-๐๐ข๐จ๐ฅ ๐๐๐ฉ๐ & ๐๐ก๐ง๐๐ฅ๐๐๐ง๐๐ฉ๐ ๐ง๐ฅ๐๐๐ก๐๐ก๐ + ๐ค&๐ ๐ฆ๐๐ฆ๐ฆ๐๐ข๐ก in ๐๐ข๐ก๐ฆ๐ง๐ฅ๐จ๐๐ง๐๐ข๐ก ๐ฃ๐ฅ๐ข๐๐๐๐ง ๐ ๐๐ก๐๐๐๐ ๐๐ก๐ง ๐ญ๐ฌ๐ญ: ๐๐ฎ๐๐ฒ๐๐ ๐ง๐ฟ๐ฒ๐ป๐ฑ๐ ๐ฎ๐ป๐ฑ ๐๐ฒ๐๐ ๐ฃ๐ฟ๐ฎ๐ฐ๐๐ถ๐ฐ๐ฒ๐ ๐ณ๐ผ๐ฟ ๐ ๐ฎ๐ป๐ฎ๐ด๐ถ๐ป๐ด ๐ฃ๐ฟ๐ผ๐ท๐ฒ๐ฐ๐๐ ๐ถ๐ป ๐ฎ๐ฌ๐ฎ๐ฏ! ๐คฉ
๐๐ก ๐ง๐๐๐ฆ ๐๐ข๐จ๐ฅ๐ฆ๐, ๐ฌ๐ข๐จ ๐ช๐๐๐ ๐๐๐๐ฅ๐ก:
โ
What is Construction Management
โ
Role of Construction Project Manager
โ
Traditional vs Modern Construction Project Management
โ
Comparison of the Construction Industry & Manufacturing Industry
โ
Phases of a Construction Project
โ
Construction Management Bidding Process
โ
Latest trends & Concepts in Management
**๐๐ง๐ค๐๐๐๐ฉ ๐๐๐ฃ๐๐๐๐ข๐๐ฃ๐ฉ ๐๐ฃ๐จ๐ฉ๐๐ฉ๐ช๐ฉ๐ ๐๐ฉ๐๐ฃ๐๐๐ง๐๐จ & ๐๐ง๐๐ฃ๐๐๐ฅ๐ก๐๐จ ๐ฌ๐๐ก๐ก ๐๐ ๐ช๐จ๐๐
Things just got ๐๐๐ง๐ง๐๐ฅ and ๐๐๐๐๐๐ฅ this time than ever before! ๐ฅณ
๐๐ถ๐ฟ๐๐ ๐ญ๐ฌ๐ฌ ๐ฝ๐ฎ๐ฟ๐๐ถ๐ฐ๐ถ๐ฝ๐ฎ๐ป๐๐ ๐๐ผ ๐ฟ๐ฒ๐ด๐ถ๐๐๐ฒ๐ฟ ๐๐ถ๐น๐น ๐ด๐ฒ๐ ๐๐ต๐ฒ๐๐ฒ ๐ถ๐ป๐ฐ๐น๐๐๐ถ๐ผ๐ป๐ ๐ณ๐ผ๐ฟ ๐๐ฅ๐๐:
๐ Construction Forms & Templates
๐ 2D AutoCAD Blocks for Construction Drawings
๐ Admin Procurement Templates
๐ Training Manual in PDF Format
๐ Training Certificate from
๐ ๐ข๐ฅ๐ ๐ฃ๐ฅ๐๐ญ๐๐ฆ ๐๐ช๐๐๐ง๐ฆ ๐ฌ๐ข๐จ ๐๐ก๐ฆ๐๐๐ ๐ง๐๐ ๐ง๐ฅ๐๐๐ก๐๐ก๐!! ๐ฅณ
๐๐ฒ๐ฐ๐ฒ๐บ๐ฏ๐ฒ๐ฟ ๐ฏ, ๐ฎ๐ฌ๐ฎ๐ฏ (6:00pm-9:00pm)
Philippine Standard Time
**๐๐๐๐จ ๐๐จ ๐ค๐ฅ๐๐ฃ ๐ฉ๐ค ๐๐ก๐ก ๐๐ฉ๐ช๐๐๐ฃ๐ฉ๐จ ๐๐ฃ๐ ๐๐ง๐ค๐๐๐จ๐จ๐๐ค๐ฃ๐๐ก๐จ!
๐๐จ๐ฅ๐ฅ๐ฌโผ๏ธ
REGISTER NOW FOR ONLY ๐ฏ๐ฐ๐ต๐ฝ๐ต๐ฝ UNTIL SLOTS ARE AVAILABLEโผ๏ธ
๐๐๐ก๐๐๐ฌ ๐๐๐๐ ๐ข๐จ๐ง ๐ง๐๐ ๐๐ข๐ฅ๐ ๐๐๐๐ข๐ช ๐ง๐ข ๐ฅ๐๐๐๐ฆ๐ง๐๐ฅ:
๐https://forms.gle/r8aCLfMQ7Bftf84d8
So, what are you waiting for?
๐๐๐๐๐๐ ๐๐ ๐๐๐๐ ๐๐๐๐๐๐, ๐พ๐๐๐๐๐พ๐ ๐๐๐๐ ๐๐! โจ
28/11/2023
Happy 3rd Anniversary R.A.A. Engineering Services
Thank you Lord for all the blessings๐๐ผ๐๐ผ๐๐ผ
13/09/2023
https://www.facebook.com/100067796358539/posts/655603143376225/?mibextid=rS40aB7S9Ucbxw6v
WATCH OUT!
The PICE National Board of Directors thru the Conventions Committee will be hosting the 49th PICE National Convention and Technical Conference slated on 24-25 November 2023 at SMX Convention Center, SM Lanang Premiere Davao City with the Theme: โInnovations in Interdisciplinary Approaches to Civil Engineering Challengesโ.
Calling all academicians, industry practitioners, researchers, innovators, and civil engineers who wish to participate by being one of the presenters in the technical conference to submit their abstracts/paper on or before the deadline on 29 September 2023.
More details on this big event shall be released soon!
Please see abstract template:
https://forms.gle/uXA4vAuT4GLgTRTB7
Click here to claim your Sponsored Listing.
Category
Address
Vera's Road, Danlagan
Lopez
4316
Opening Hours
| Monday | 8am - 5pm |
| Tuesday | 8am - 5pm |
| Wednesday | 8am - 5pm |
| Thursday | 8am - 5pm |
| Friday | 8am - 5pm |
| Saturday | 8am - 5pm |