Laag Gar
Glide ride, Live free
Bagong gising pa yan 🤭
15/01/2026
Back to normal na ang kinabuhi 🤭 humana ang masasayang sandali 🤣🤣🤣
06/01/2026
20/12/2025
San ricardo to lipata surigao
Hapit na bilis ng roro
19/12/2025
Kape mo na dito banda
18/12/2025
Lipata seaside dinner
16/12/2025
Shout out to my newest followers! Excited to have you onboard! Emma Balanlay, Braggy Vhoi Braga ♥️♥️♥️
Ready na para bukas
Kayo ba tapos naba year emd party nyo?
06/12/2025
Ctto:
Bucana Bridge Timeline
🔵 BEFORE 2018 – Planning Stage
• DPWH had long-term plans to improve Davao’s east-west connectivity.
• Bucana Bridge was identified as part of the future Davao City Coastal Bypass / Coastal Road.
• Early feasibility studies and conceptual designs were prepared so it could be proposed for foreign funding.
🟡 2018 – Formalized Under Duterte Administration
• The Philippines and China signed an Exchange of Letters for the China-Aid Localized Projects, including the Davao River Bridge (Bucana Bridge).
• This officially placed the project under China grant funding, NOT a loan.
• This happened during the height of Duterte’s Build Build Build + PH-China infrastructure cooperation.
👉 This is why it was formalized in 2018.
The Duterte administration was actively securing foreign grants for large infrastructure, and China was offering aid for bridges outside Metro Manila.
🟠 2019–2022 – Design, Review, and Delays
• Detailed engineering designs underwent revisions.
• Right-of-way and coastal alignment needed adjustments.
• Pandemic (2020–2021) slowed government project processing.
• Environmental clearances and local coordination were completed.
👉 These years explain why the project did NOT start immediately after 2018.
🟤 2023 – Contract Signing
• November 2023: DPWH signed the civil-works contract with China Road and Bridge Corporation (CRBC).
• This officially moved the project from planning → actual construction.
🔴 Late 2023 – Start of Construction
• Groundwork, piling, and foundation works began along both sides of the Davao River.
🟣 2024 – Major Structural Work
• Pylons and main spans were erected.
• Bridge deck segments were installed.
• Coastal approach-roads were developed.
🟢 2025 – Final Stretch
• Mid-2025: Project reached 73% completion.
• Mid-2025: Final concrete pouring for the deck finished.
• Late 2025 (as of latest updates): About 94% complete.
• Expected opening to motorists: Last quarter of 2025.
⭐️⭐️⭐️
Duterte formalized the China-Aid funding in 2018, but the bridge only moved to construction in 2023 after years of design reviews, clearances, and right-of-way preparation — which is why it’s finishing only now.
Side line muna tayo guys.. Mamonetize pa kaya tayo nito bc na ang life
Click here to claim your Sponsored Listing.
Category
Address
4118