AAE Engineering Group
AAE Engineering Group of Co. Ltd ready for Construction. installation and heavy maintenance.
Welcome Back.
Responsibility
လုပ်ဖော်ကိုင်ဖက်တေက ကတိမတည်ရင်ဘာလုပ်မှာလဲ
၂၀၂၀ ခုႏွစ္အတြင္း
AAE ကုမၸဏီ၏ လုပ္ငန္းမ်ား
ပိုမိုတိုးတက္
ေအာင္ျမင္ပါေစ...။
22/08/2019
overhaul maintenance of Rotary feeder for MCL Plant.
19/08/2019
Vertical Coal Mill Roller oil seal change at MCL Factory.
18/08/2019
overhaul maintenance crusher at MCL Cement Factory.
28/04/2019
ႏွစ္သစ္ရဲ႕ ပထမဆံုး ေျခလွမ္းေလး စတင္လိုက္ပါျပီ
Today AAE
Congratulations
For great result
30/12/2018
diameter 3400 mm, hight 90 Meter stack installation for KBZ Cement project since 2012.