Zaydavi engineering Limited
A registered electrical engineering firm in kenya ,licensed by National Construction Authority N.C.A
31/05/2026
0702938616/0101216391 Zaydavi Engineering limited
One of its kind from us .0702938616/0101216391
22/05/2026
ποΈ A Multi-Storey Residential Projectβ¦ where engineering vision becomes a precise reality.
We are developing a modern five-storey residential building under the highest standards of quality and safety, using advanced structural systems and a contemporary construction approach that reflects modern urban development.
π·ββοΈ From on-site engineering supervision to detailed ex*****on monitoring, the project team ensures precision, quality, and sustainability at every construction stage.
π A project that combines: βοΈ Engineering precision
βοΈ High-quality ex*****on
βοΈ Occupational safety
βοΈ Modern construction efficiency
# 0702938616/ 0101216391
30/04/2026
TheEngineers around 0702938616/0101216391
09/04/2026
Rework Prevention in construction and civil engineering works.
Involves planning,supervision, clear communication and strict quality control ensuring work is done correctly the first time.
Strategies for preventing Rework:
1. Rigorous preparation and planning
2. Active site supervision and monitoring
3. Material quality control
4. Documentation and technology
5. Managing workforce safety.
"DO IT RIGHT THE FIRST TIME."
# Electrical Engineering
0702939616/0101216391
05/04/2026
Panoramic view π
Formwork 98% βοΈ π
01/04/2026
This image provides a detailed, step-by-step guide on how to check the vertical alignment, or plumb, of a concrete column during construction. The process is crucial for ensuring the accuracy and structural stability of the building.
The guide outlines five key steps:
1. Plumb Bob Check : This traditional method uses a plumb bob, a weight suspended from a string, to verify verticality. Gravity ensures the plumb bob hangs in a perfectly vertical line, and any deviation from this line indicates misalignment of the column.
2. Spirit Level : A spirit level is placed against the surface of the column formwork. The air bubble within the vial of the spirit level indicates whether the surface is perfectly vertical. Adjustments are made to the formwork until the bubble is centered, signifying a vertical alignment.
3. Laser Level : This modern technique employs a laser level to project a straight vertical beam along the column. It offers high precision and allows for rapid checking of verticality, even over greater heights compared to traditional tools.
4. Axis Measurement : This step involves checking the column's position at its base using measuring tools. Proper alignment with layout markings is essential to ensure the column is correctly positioned according to the structural plan.
5. Adjust Wooden Formwork : The final step involves adjusting the wooden formwork using supports and braces. Workers tighten or loosen these supports to achieve perfect alignment of the column before the concrete is poured, ensuring overall accuracy.
01/04/2026
π Bridge Construction β Structural Works in Progress
A technical snapshot of a bridge under construction, highlighting key structural components and engineering coordination on site.
πΉ Main features:
* Reinforced concrete piers, beams, and deck slab
* Detailed reinforcement (rebar sizes and spacing)
* Expansion joints for structural movement
* Integration of MEP systems (drainage, electrical conduits)
* Dimension lines and level references ensuring accuracy
Strong design and precise ex*****on are essential for durability and safety in infrastructure projects.
Engr Duke
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Address
Kitale
Opening Hours
| Monday | 09:00 - 17:00 |
| Tuesday | 09:00 - 17:00 |
| Wednesday | 09:00 - 17:00 |
| Thursday | 09:00 - 17:00 |
| Friday | 09:00 - 17:00 |
| Sunday | 09:00 - 17:00 |