DAB PLASTERING
All plastering and building work undertaken
06/07/2022
Garden transformationπππ» raja green Indian stone flags laid with full outbuilding designed and built with bifold doors and drop down for bar area πππ»
04/07/2022
Media wall designed and built πwith lighting and fire installation πππ»
21/03/2022
Full bathroom refurbished with added walk-in shower πππ»
21/03/2022
Bathroom ceiling repairs
26/11/2021
Media wall design and build to any specifications and finishes itβs your choice π. This one is complete now, fully skimmed up waiting paint now. Get in touch for a free quote πππ»
18/11/2021
Lounge and 3 bedrooms skimmed, whitewashed, then coloured with malt chocolate paint. Carpets fitted to bedrooms and laminate fitted in lounge
16/11/2021
Full kitchen replacement! Out with the old in with the new!
22/10/2021
Kitchen boarded skimmed and kitchen installed, metro tiles and clear pine doors installed to finish it off.
31/07/2021
A few ceilings re-boarded and skimmed
31/07/2021
Fire opening ready for log burner, full re-skim and bespoke units made to accommodate the tv etc πππ»
31/07/2021
Media wall created, kitchen fitted and tiled front to back. In Cheadle
Click here to claim your Sponsored Listing.