THB

THB

Share

We keep Britain moving with Surfacing, Hydroblasting, Road Lining & more. *Dedicated team of experts with experience spanning 20 yrs *24/7 call-out 📞🚧

Photos from THB's post 12/06/2025

🟡 Fresh lines. Sharp results. 🟡
We’ve just completed a full car park lining job at a tarmac plant in Linden, Essex – all done in thermoplastic for maximum durability. ✅

👷‍♂️ Pedestrian crossings
♿ Accessible bays
➡️ Directional arrows
🅿️ Full bay layout
🚧 Clear zones & borders

Another site upgraded for safety, flow, and professional finish by the team at THB UK.
📍 thbuk.co.uk

Photos from THB's post 10/06/2025

🚧 Project Complete 🚧

We’re proud to wrap up a technically challenging infrastructure project that demanded precision, adaptability, and teamwork from start to finish.

✅ Installed 7 x new maintenance holes
✅ Integrated a dual-packaged pumping system for clean & foul lines
✅ Constructed new footways, driveways & rain gardens
✅ Laid new road markings to finish the job right
✅ Installed raised floors in garage storage areas for improved accessibility
✅ Connected all utilities from scratch, working blind due to zero pre-installation

With no existing utilities on site, our team had to redesign all drainage levels on the fly, collaborating closely with local authorities, the council, and our client to do so safely and effectively.

Big up to the THB team for pulling off such a complex project 👏

06/06/2025

From hydroblasting and surfacing to traffic management and drainage, our self-delivered model ensures flexible, reliable results across every project.

Operating 24/7 with a dedicated fleet and expert crews, we support critical infrastructure across highways, rail, telecoms, airports, and more.

➡️ Discover more at thbuk.co.uk

📍 Based in Kent, operating across London & the South East.

04/06/2025

Weekend works in Acton continued 🟢⚫️⚪️

Delivered by the THB team: over 850m² of paint was safely removed via hydroblasting, making way for 560m² of fresh green MMA walkways and 300m²+ bold, high-visibility pedestrian crossings.

Precision. Durability. Safety.

📍 Acton

Photos from THB's post 03/06/2025

Weekend Works in Acton 🟢⚫️⚪️

A big job was delivered smoothly by the THB team this weekend. Over 850m² of paint safely removed via hydroblasting, making way for 560m² of fresh Green MMA walkways and 300m²+ bold, high-visibility pedestrian crossings.

Precision. Durability. Safety.
Proud of the team’s effort and quality finish under tight timeframes.

📍 Acton

30/05/2025

🚧 Another day, another hydroblasting job — this time for Amazon. We removed thermoplastic paint from the site’s car park, delivering a clean, safe, and surface-friendly result. 💪

Photos from THB's post 29/05/2025

With five operational hubs across London and the Home Counties, we are equipped to deliver 24/7 call-out services – fast, efficient, and dependable.

Our fully self-delivered model means we own and operate our entire fleet of vehicles and equipment, giving us total control, unmatched flexibility, and rapid response on every job. ✔️

Get in touch:

📲 0800 0146 420

📧 [email protected]

28/05/2025

Latest addition to the THB fleet.

We’re continually investing in the best tools to deliver top-tier service, and our brand new JCB is ready to get to work. 🚧

15/05/2025

🧠 Mental Health Awareness Week | Let’s Talk About It

Did you know that su***de is the leading cause of death for men under 50 in the UK, and men in the construction industry are at significantly higher risk?

At THB UK, we know our industry is built on strength, but real strength also means speaking up.

Construction can be tough with long hours, high pressure, and a culture where vulnerability isn’t always welcomed, but it’s time to change that.

This Mental Health Awareness Week, we’re encouraging our team, clients, and industry partners to support each other and start open conversations about how we’re doing.

*You are not alone
*It’s okay to ask for help
*We all have a part to play

We’re committed to promoting mental wellbeing across the industry, not just this week, but every day!

If you’re struggling or know someone who is, speak up. Share a coffee, make a call, or check in. It could save a life.

Photos from THB's post 13/05/2025

🚨 Emergency works in action!

We resurfaced this busy TFL bus stop for TKJV after safety issues arose from deep rutting and faded markings.

✔️ PMA asphalt for a smooth, long-lasting finish
✔️ Hand-painted road markings
✔️ Safe site management for vehicles & pedestrians
✔️ Delivered with no delays 💪
Another job completed to the highest standard.

08/05/2025

VE DAY — 8 MAY 🇬🇧

Honouring the past.
Building the future.

01/05/2025

Not all heroes wear capes – some wear hi-vis and get the job done rain or shine 🦺☀️
Big shout out to the THB crew — keeping things moving, one job at a time 🚧

Want your business to be the top-listed Engineering Company in London?
Click here to claim your Sponsored Listing.

Telephone

Address

Clements Reach Farm
London
DA130AD