Beijing Chengdong International Modular Housing Corporation
Your modular building soldtion provider, superb construction technology and attentive after-sale ser
Container house 、Flat pack、Modular house.
is offered in a variety of sizes, that are broken down into formats: HDTV (16:9), NTSC or Video (4:3), Widescreen PC (16:10), Square (1:1), CinemaScope (2.35:1) and various other AV formats.
Containerhouse,Prefabhouse,Steelstructure,containerhome,containerhomes,containerstore,containerhouse,shippingcontainers,steelstructurebuildings,expandablecontainerhouse
ZA type.
With the desired comfort and durability, this product is perfectly suitable for wearing every day and can be worn again and again.
ZA type.
has created a good international image.
Prefab house ZM type house.
The performance of rank top in the industry.
Prefab house ZM type house.
The product gives off a clear light. Its finely designed beam angle enables it to emit light that is more evenly distributed.
Ethiopia BN Road Project
Sample Building of Light Steel Villa Community in Papua New Guinea.
The product is corrosion resistance in extreme conditions. Its parts have been electroplated with a layer of metal membrane to resist the chemical influence.
Camp Construction in Region 2 of Thar Coal Mine in Pakistan
Mombasa Nairobi Railway Project in Kenya
East Coast Railway Project of Malaysia
Made Island Station Project of China-Myanmar Crude Oil Pipeline
Ten thousand man camp project at the Dangete refinery II, Nigeria.
Different from other companies, adopts material of to manufacture .
about us.
has already regarded the international market as a target for future development.
The project is an Ethiopian highway project signed between Chengdong and a Spanish joint venture. Chengdong designs the overall camp of the temporary houses and divides the houses according to their functions as on-site office, worker and manager accommodation, laboratory, warehouse, etc. Covering Chengdong’s ZA ,ZM and K type house, totaling 12447m2.
Ethiopian Highway Project
Project location: Ethiopia
Project features: high technical requirements, tight schedule
Solution
According to the requirements of the project, the ZA house with very flexible design and the K house with easy installation are selected to ensure that the design concept of the customer can be combined and quickly completed the delivery and installation.
1. High technical requirements
The customer's house drawings are all relatively irregular designs, with uneven positions. This requires Chengdong to complete the processing of this node to ensure the smooth progress of the on-site installation and achieve the best wind and rain protection effect. Through continuous discussion and improvement of the technical team, various problems were finally overcome and an approved solution was provided to the customer, which was highly praised by the customer after the installation was completed.
2. The construction period is tight
Including the production and installation period, the customer’s requirements are very tight. We need to complete the procurement, production and delivery of all materials within half a month, and we need an installer to guide on-site and complete all the houses within two months. After receiving the task, Chengdong convened an emergency production meeting to finally confirm that each link was implemented. Through the efforts of all Chengdong staffs, the delivery of the product was successfully completed on time.
Nepal Healthcare Hospital Project.
Solution
1. Appearance
Adopting the ZA house structure, the overall color tone with white walls and blue roof, combined with the actual use situation, use steel doors and install anti-theft nets and other security measures.
2. House structure
The structure is all galvanized parts which can meet the requirements of appearance and function.
3. Fire protection
The structure is sprayed with fire-resistant paint and the maintenance material is made of Class A fire-resistant glass wool to meet the fire protection requirements.
4. Logistic and Construction
Provide a complete set of transportation plans for sea, land and bulk cargo transportation, as well as installation instructions with graphics and text instructions, installation video and on-site installation instructions helping customers to complete the construction site work well.
Beijing Metro Line 19 Project No.08
Recently, the Capital Window website announced the status of Beijing’s subway planning this year. There are total 20 subways under construction. The mileage will also increase to 638 kilometers. Chengdong also participated and contributed their own strength to the capital construction!
Camp housing options and solutions
Preliminary project consultation stage: Anjie Chengdong provides container house plan and Beijing Chengdong provides two K-type house plans. The final customer chooses Anjie Chengdong product solution.
The overall layout of the camp is divided into managerial office, accommodation area, and worker living area.
Office area for management personnel: The main office building and the dormitory for management personnel adopt Anjie Chengdong container houses and the supporting functional rooms are equipped with Beijing Chengdong products for meeting rooms, staff activity rooms, canteens and workers accommodation.
Côte d'Ivoire Abidjan Port Expansion Camp Project.
Each is originally created and precisely measured by a team of experienced and trained employees– with respect to the wood sizes of the customer's requirements.
Papua New Guinea Accommodation and Office Camp Project
Project Location: ORO Province, Papua New Guinea
Camp Contractor: Beijing Chengdong International Modular Housing Corporation
Project Feature: fast installation, high standard building, good rainproof and anti-corrosion
Room selection and solution
The selection of the house type has been comprehensively considered based on the local climatic conditions.In order to meeting the requirements of
high-grade beautiful, fast installation and high standard anti-corrosion, we finally choose ZA-type house,villa type and second-hand container.Z and villa types are galvanized
steel as the main structure,which meets the requirements of good anti-corrosion and nice apperance. And there is also decorative board outside, which improves the require of durability.
This kind of type is very suitable for tropical rainy climates.
For the decoration of villa house, environmentally-friendly materials had been supplied and created a zero-formaldehyde living environment!
Kenya's Nei-Ma Railway Camp Phase I
Project Profile
Thinking of Kenya's politics and environment, the camp has been built in Brubu Village, Ngong Town, Cagado County.Ngong Town is adjacent to the Karen area with
the most developed economy in Kenya. The social security environment around the camp is stable, transportation is convenient, and supporting facilities such as water and electricity are
complete.The camp covers an area of 82,394㎡, including construction area 11,698㎡,office area 10,400㎡,living area 29,724㎡, and production area 42,270㎡.
The main building in the camp adopts ZA model, with light steel structure as framework, sandwich panel as insulation material. The components are connected by bolts, which can be
assembled quickly and conveniently to ensure the standardization of temporary buildings. The public toilets and VIP reception rooms use brick system, with brick walls for load-bearing,and
a mixed structure system composed of reinforced concrete beams, columns and slabs.
The camp road is directly connected with Ngong Road, which can be easily and quickly entered and exited; the roads in the camp are arranged around each area and
directly connected between two areas. The camp roads are paved with high-strength concrete bricks, which are densely packed in turns and pedestrians.There is equipped with signs and
warning lights, as well as speed bumps and road signs in bends and densely populated areas.
The camp is equipped with outdoor basketball courts, outdoor tennis courts, gym, and runways of 800-meter-long around the campsite. The gym has facilities such as table tennis,
billiards tables, chess & card rooms, and karaoke rooms, which basically meet the entertainment and exercise needs of employees after work.
Astana Light Railway Project in Kazakhstan.
has to be tested for quality before its shipping. It must be dipped in the acetic acid for hours to inspect the dissolving-out quantity of lead and cadmium.
When refer to Somalia that the first reaction of some people is pirates. But behind this "rich place of pirates", there is actually an unknown history of bitter blood and
tears in a country. Somalia once thrived, but eventually fell into the abyss of civil strife, so that it became one of the poorest countries in the world.
Project Description
The user of this project is Dika Somalia. The company is committed to the supply of United Nations materials and engineering construction, and its employees often live
near the United Nations camp to provide convenient services. Because the temporary residences on the site are mainly transformed into containers, the simple and humid
living environment and the monotonous container shape make the staff feel boring, and they are eagerly looking forward to live in new residential facilities to
improve the living atmosphere of the the camp.
Since Chengdong has maintained a good customer relationship and reputation in the Africa`s temporary construction market for many years, through the
introduction of partners, the product was accepted by Dika Company and they are willing to use Chengdong products as its pilot project in Somalia. Do a good job
of publicity for the later market development and win-win cooperation The purchased temporary construction site houses are used for staff accommodation, office work,
entertainment and rest.
Room type selection and solutions (LZA, K type, light steel villa)
The construction site of this camp is just tens of meters away from the coast of the Indian Ocean. Taking into account the anti-corrosion effect, construction period and
cost, our company recommends that all hot-dip galvanized anti-corrosion structures be adopted, and most of them are two-story buildings to save land area and construction
costs; supporting one-stop service, furniture and indoor basic facilities are fully covered, Customers provide maximum value-added services.
This project took 25 days to complete (including the purchase of raw materials, production and processing, collection of supporting goods, and factory shipment), which
was 5 days ahead of the customer's required construction period and met the customer's requirements with high efficiency.
In order for the house to be installed and put into use quickly and accurately, Chengdong dispatched skilled instructors to help complete the construction tasks without
fear of war. As brand-new houses stand in front of you, customers and employees are also moving in one after another. The satisfied smiles and compliments we see every
day are the most beautiful feelings of our instructors on the scene and the motivation for persistent struggle!
Whether in a country where there is a lot of bullets or a war-torn land, Chengdong will always give you a sense of stability, and let you feel the warmth of home in a foreign land.
As the world's most developed economy and China's largest trading partner, the United States has a long tradition of using modular buildings. If you can successfully
enter this market, you can not only achieve good economic benefits, but also will play a huge role in improving the lean management capabilities of the company in order
to meeting the high standard of quality control of American customers.
Due to highly manufacturing costs of local and European, Williams Scottsman, the world's largest modular building operator headquartered in the United States, is also
actively looking for suppliers from China. After years of investigation, research and comparison, Chengdong stands out from many peers by virtue of its excellent product
development capabilities and good product quality.
The cooperation between Chengdong and WS began from 2014. Up to now, our company has successfully exported nearly a thousand sets of container house to America,
which are widely used in the construction, military, education and energy fields of the United States, and have obtained highly praise from operators and end customers.
We understand that in addition to GMF products, AS also operates trailer products, container transformation products and standard container products in the North
American market. Among them, trailer products are the main force, and the existing stock is 65,000 sets. According to customers, although GMF products currently account
for only a small portion, as GMF is gradually recognized in the North American market, AS plans to increase the proportion of GMF products year by year.
Through this visit, we learned that GMF products are currently in the primary promotion stage in the United States, which are essentially different from those popular
in the US market. However, we believe that as GMF products continue to mature, the recognition in the US market will be highly increased, and the potential market will also grow larger.
In March, there is a breeze, and the sky is frozen in the clouds;
No winter will not pass, no spring will not come;
In the spring of 2020, they are destined to be ordinary!
Bing Xin once said: If there were no women in the world, the world would lose at least five tenths of truth, six tenths of goodness, and seven tenths of beauty.
When this "Goddess Festival" is approaching;
In this beautiful time when everything is revived;
At this critical moment of working together to fight the epidemic and resume production;
They use simple tenderness and tenacity to compose a moving poem about the truth, kindness and beauty of Chengdong people!
They abandon their parents, and cuddling with their children. With a female spirit, they rush to help the epidemic area for Chengdong and charge ahead!
They gave up the Spring Festival holiday, reunited with their relatives, and rushed to the epidemic area for Chengdong and guaranteed support in a spirit of abandoning their little family to take care of everyone!
There may indeed be no heroes falling from the sky in this world,
But there are mortals who have come forward, a hot, a shining,
Let the fireflies gather out of the galaxy!
Tribute to the cutest goddesses!
As the prevention and control of the new corona pneumonia epidemic has become normal in our country, universities, primary and secondary schools, and kindergartens
across the country resumed school around September 1, which is basically the same as the start of the fall of previous years. The children finally embarked on a new journey.
In order to ensure better campus safety and stability during the beginning of the fall semester, the Beijing Pinggu District Education Commission added new security
forces to kindergartens, elementary schools, and middle schools. Among them, clear requirements were set for security houses: while meeting the functional requirements,
it must also have on-site construction fast.The appearance of the house is consistent with the original building and other requirements. This project is also the
application of modular products in schools.
Project features: short on-site construction time, the appearance of the building needs to be unified and coordinated with the original building, the number and location
of each school are also different.
I am eleven years old and my younger brother is five years old this year, but there is quite few time we can stay with our dad together . If memory serves, I only celebtated two Spring Festival together with my dad , all
because my dad's job was to do construction projects overseas.
I heard from my dad that there are so many uncles who have been working abroad like him and can't go back home for some days in a year. Dad is a technical guidance
engineer. He and other uncles have built many high-rise buildings, railways and airports abroad. Many people appreciate their hard work , but when can he go home? My
brother and I, when can we spend the Spring Festival with him?
Last time my father went home and said he would take my little brother to ride the Ferris wheel, my little brother was very happy. But dad disappointed him because he suddenly received an
urgent task. He just carried his suitcase and left without looking back.
I heard from my father that he participated in 53 Chinese overseas engineering projects, visited 27 countries, and totally used 4 passports. they use
Chinese technology, Chinese speed, and Chinese standards for construction, and they are full of pride.
When I was six years old, I got a serious illness and stayed in the hospital for a long time. At that time, only my mother and my eight-month-old brother were with
me. I really want my father to accompany me, but only my mother is by my side every day. Due to overwork, my brother was born early.
sometimes , work overseas means a lot of hard work. He once walked 6 or 7 hours on rugged mountain roads to reach the construction site. When my brother and I saw a
special report on the opening of the Mombasa-Nairobi Railway in Africa on TV, I knew that it was a project my father had done. Seeing the happy people in Africa, I
suddenly felt that I understood my father. Although the work he did was hard, it was great.
During the Spring Festival, my father’s long-term dedication trophy was sent home by the leaders of my father’s company. I am very proud of my father.
This is the story of my dad, his name is Yang Yiqing.
The CC&LB project is the largest project between the governments of China and Argentina and also the largest ongoing construction project in Argentina. The
project consists of Condocliff (CC) and La Barrancosa (LB) which sit along the same river but 65km away . The total installed capacity of the project is 1.31 million kilowatts.
After completion, the average annual power generation will be about 4.95 billion kWh, which will increase the total installed power capacity of Argentina by about 6.5%.
This camp project was officially launched in 2018. The total construction area of the CC&LB camp is about 31,582 square meters, of which the office area,
accommodation area, and bathroom all adopt Chengdong`s Flatpack container , and the kitchen and commercial recreation area (training area) adopt H steel structure .
The rest will be deliverd as the second batch and third batch .
The project camp is located at 50°south latitude. The lowest temperature in winter can reach below minus 20°C. Due to the combined effects of the narrow
continental area, the leeward position of the Andes Mountains, and the coastal Falkland cold current, precipitation is scarce, and the average annual precipitation in the
whole area is not Over 300mm, the wind is strong, the dust storm is constant, and the weather conditions are relatively harsh. Taking the above factors into consideration,
Party A requires that the module rooms including functional modules (toilet modules, stair modules) are assembled in China.
At the same time, considering the poor sea and land transportation situation at site,we carry out a certain degree of packaging and maintenance plan for the goods before loading .
ChengdongFlatpack container have experienced two cold winters in South America, and all performance indicators have reached the design requirements.
Its excellent airtightness and heat preservation have won unanimous praise from customers!