CCCC First Highway Engineering Group
As a major company engaged in transportation infrastructure, municipal engineering, construction,
14/09/2026
As arrives, autumn quietly unfolds across the land. Cool nights descend, and wild geese head southward, bearing hopes for a fruitful harvest.
Bridges, ports and maritime projects built by stretch far and wide. Rooted in the rhythm of Chinese , we keep building connections across continents, linking regions and bringing people closer together. wishes everyone peace and well-being as autumn begins.
14/09/2026
07/09/2026
Recently, former provincial governor and Member of Parliament John Kabeya Shikai led a delegation to inspect the Kananga Erosion Control Project. The delegation visited the construction site to assess progress on the ground, and gave high praise to the project's quality and appearance. Kabeya noted that the once severely eroded land has now been restored to a level condition, with some areas even safe for vehicles — a remarkable improvement compared to the past. This project is a key flood-control initiative in Kananga, and once completed, it will strengthen the city's flood defense, improve the local ecological environment, and enhance regional disaster prevention capabilities.
06/09/2026
Recently, the KB-2 Project in the Democratic Republic of the Congo, undertaken by CFHEC, successfully passed its preliminary acceptance, marking a significant milestone for this important transport infrastructure. The project is a key section of National Highway No. 1, connecting the capital Kinshasa with the western hub of Kenge. Once operational, it will greatly enhance regional transport capacity, improve the national road network, and boost economic development along the route while improving travel conditions and contributing to social stability.
05/09/2026
Recently, the emergency rehabilitation project for the landslide-affected section of Cameroon's RN06 National Highway in Dschang successfully passed its completion inspection. RN06 is a critical transport artery connecting the West, Littoral, and Northwest regions, and an essential link for regional economic activity and livelihoods. The road had been blocked for two years due to a landslide, forcing travelers to take a 110-kilometer detour. With the project now complete, this key route has been reopened, removing a major bottleneck and providing reliable support for local residents and economic recovery.
04/09/2026
Recently, the Awaé–Soa Road Rehabilitation Project (AES Road Project) in Cameroon successfully passed its completion inspection. Located in the Mefou-et-Afamba Department of the Central Region, the project spans approximately 82 kilometers and serves as a vital link between the capital, Yaoundé, and the East Region. It is also a key livelihood project for the local area. The scope of work included earthworks, pavement, drainage, culverts, traffic safety facilities, and environmental protection measures. Upon completion, the project will address long-standing road deficiencies across 22 villages and towns along the route, significantly improving travel conditions, boosting regional trade and logistics, and revitalizing the rural economy.
01/09/2026
Enthusiasm is not only about energy—it also shows in the care given to every detail.
Before the trip, Pang Guilong repeatedly refined the itinerary across Chongqing, Henan and Beijing, checking routes, timing and transport connections. He also contacted each delegation member via WhatsApp to note their dietary preferences, making sure everyone felt considered and valued.
Care in every detail, sincerity in every action. This is his E — Enthusiasm.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
Beijing
Opening Hours
| Monday | 09:00 - 17:00 |
| Tuesday | 09:00 - 17:00 |
| Wednesday | 09:00 - 17:00 |
| Thursday | 09:00 - 17:00 |
| Friday | 09:00 - 17:00 |