Inspectat
Alain Lali, inspecteur en bâtiment
Services: Inspections pré-achat, pré-recéption et pré-vent de bâtiment
11/04/2024
:(
A PVC plumbing system installed in the ceiling framework of a building under construction. The pipes are part of a drain or waste system, secured with metal brackets to wooden joists for stability. Electrical wiring is also visible, running alongside the plumbing, suggesting that both water and electrical systems are being installed simultaneously. The combination of tees and elbows in the pipe design ensures that the water or waste is directed properly through the structure. The installation appears to be well-organized, with attention to structural support and proper spacing between the utilities.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
Opening Hours
| Monday | 7am - 5pm |
| Tuesday | 7am - 5pm |
| Wednesday | 7am - 5pm |
| Thursday | 7am - 5pm |
| Friday | 7am - 5pm |
| Saturday | 7am - 5pm |
| Sunday | 7am - 5pm |