10/02/2022
PASSED FRAMING INSPECTION!! This is always a good feeling for builders. It means we can move forward instead of taking a step back and finishing what needs to be done. Now, it’s time to shingle these roofs…
#519
08/21/2022
This large deck project is coming to a wraps. So much detail I’ll share on another post after completion. This deck and pavilion structure is wrapped using .
The ceiling will be finished in cedar with 8 lights, a central fan and a tv attached to a post.
www.Precisiondeckdesign.com
08/20/2022
We were digging to when I ripped the with my shovel. We couldn’t leave the exposed to water so we it up.
www.precisiondeckdesign.com
#519
08/20/2022
Here’s the start of our largest project to date. 2 large decks, 2 large roofs. 4- sono tubes= 90 bags of concrete. No. We will not wait 2 weeks for a concrete truck. Haha
#519
08/07/2022
Shade from the sun. It’s Pergola season, these are some oldies but fun to build.
Precisiondeckdesign.com
#
#
#519
07/17/2022
This beautiful deck was surfaced using
The homeowner now wants the ( ) all the way up the one side of the deck which we’ll change out asap.
This deck also features stair lighting which goes from dim to super bright depending on your mood. An entrance way to storage under the deck and our very first
07/16/2022
Here’s a couple more happy customers.
#519
07/14/2022
The is complete and we’re totally for the next step. Building the and
And of course, finish off the stairs and rail…
(this is our first yr as a company but we come with experience. We’ve seen the best and are looking to be at the top level some day)
(you guys rock, thanks for your sharing what ya’s know plus.
07/12/2022
Day 2, floor boarded
#
#519
07/10/2022
Finally we get to build a simple rectangle deck. 3 hours to set 4 posts, 1 day to frame.
www.precisiondeckdesign.com
backyardinspo
#519
07/05/2022
And let the forming begin.
#519
07/02/2022
The start of a large project including: small deck and stairs down to a Stamped concrete pad, walk way and In-ground Fire Pit. We will be digging a French drain at the side of the house from the downspouts and the in-ground fireplace. The house and neighbours house will be surrounded with a steel fence. This is the start of the project.
www.precisiondeckdesign.com
#519
Click here to claim your Sponsored Listing.