RJV
Operating since 1955, RJV is WA’s most established civil construction and mining contractor.
We bring a 65+ year history of proven performance in the delivery of civil infrastructure, mining services, marine infrastructure and urban renewal.
Two new Caterpillar CS13 GC rollers join our fleet!
To strengthen our operational capability and keep pace with the increasing demand across our civil and urban construction projects, RJV has recently invested in the purchase of two additional Caterpillar CS13 GC Vibratory Soil Compactors.
This strategic investment further enhances our fleet capacity and ensures our teams have access to modern, reliable equipment capable of meeting the diverse requirements of our projects throughout the region.
A key advantage of these rollers is their suitability for working in and around sensitive environments and critical infrastructure corridors. The micro vibe-controlled vibration capabilities allow operators to achieve required compaction specifications while minimising the risk of disturbance to existing underground services, utilities and surrounding infrastructure. This makes them particularly valuable for urban developments, subdivision works, road upgrades, and projects where the protection of existing assets is paramount.
11/08/2026
Two more stages, both already underway.
RJV has recently been awarded and mobilised on:
• Catalina Stage 47 for Catalina Regional Council
• Jindalee Stage 18B - Jindee Interface for MQ1 Land Syndicate
Well done to the crews keeping these projects progressing.
04/08/2026
The Diggers & Dealers Mining Forum is in full swing in Kalgoorlie this week!
Our COO, Jason Fletcher and General Manager Mining Services, Gregg Ireland, are on the ground as delegates for our Mining Services division - connecting with industry and sharing RJV's expertise in civil construction for WA mining and regional projects.
With 70+ years of delivery excellence and a 200+ mine-spec owned fleet, we're built to support your next project.
At Diggers & Dealers and keen to connect? DM Jason and Gregg. (Pictured here with a 500kg gold bar worth $95 million!)
15/07/2026
Sustainable offices have arrived at our Malaga workshop ☀️
As part of our ongoing commitment to sustainability, we have now completed phase 1 of our energy and infrastructure upgrade at our Malaga workshop thanks to TCD Civil Construction. Two smart infrastructure transportable buildings, integrated with a 24kWh battery system and 24 515W solar panels, have been purpose-built for RJV's operational needs.
Designed to work with the energy system, their high thermal efficiency enables a compact, efficient off-grid setup. The solar installation is expected to generate around 20,000kWh annually (~54kWh/day) - ample surplus to also power the site's southern domes and ablution facilities. Independent testing shows the buildings average 8dBA quieter than a conventional transportable office.
Phase 2 will expand the system with a 200kWh battery and 60 additional solar panels, creating a scalable platform that supports site growth while reducing reliance on diesel power.
09/07/2026
Practical completion achieved at Skyfields! 🎉
RJV is proud to have completed our scope at Skyfields by Perth Airport - our first project with this new client. Located in the West South (Dunreath Green) precinct, the early works spanned approximately 26 hectares within the Airport Estate, preparing the site for future commercial and industrial development.
Our scope covered clearing and topsoil removal, processing and management of topsoil, removal of excess vegetation offsite, and site stabilisation. The precinct is now fully stabilised and ready for follow-on works.
08/07/2026
RJV is pleased to have secured new stages across several residential estates with our valued development partners:
🔹 Lakelands Stage 75 and Elavale Stage 11 Civil both for Peet Communities, and
🔹 Eglinton Village Stage 7 Civil and Henley Brook Stage 6 for Cedar Woods
Well done to our teams for continuing to deliver these projects safely and to the high standard our partners expect.
07/07/2026
We continue to build momentum in 2026, with another exciting project secured in Perth's northern growth corridor!
RJV has been awarded a package of works across four separable portions at Maribelle, a new private residential estate by Wolfdene in Mariginiup. Our scope includes:
🔹 Stages 1–3 Bulk Earthworks
🔹 Stage 1 Civil Works
🔹 Stage 2 Civil Works
🔹 Stage 3 Civil Works
We look forward to working alongside Wolfdene once again to help bring this exciting new community to life.
Learn more: https://rjv.com.au/rjv-awarded-works-at-maribelle/
30/06/2026
Building on the recently announced new stages at the Claravale and Henley Brook residential estates, we're pleased to share that RJV has secured additional works across four more projects:
- Treeby North: BEW Stage 2 and Stage 3 Civil for Perron - commenced May
- Wellard Farms: Stage 1, Phase 2 BEW for Stockland - commenced May
- Bletchley Park: Stage VL6 for Urban Quarter - commencing June
- East of the Beach: Central Precinct Stage 3 for Prime Eglinton - commencing June
This continued confidence from our clients reflects the capability and reliability we bring to delivering every project, on time and to standard.
25/06/2026
Henley Brook Stage 5 has achieved practical completion!
Congratulations to our Henley Brook team on a superb practical completion inspection for Stage 5. The stage presented immaculately with the City of Swan praising the finish. Feedback like this is a credit to the care and consistency our crew brings to every stage of delivery.
These aerials show strong housing construction progress across the first stages 2-4 since RJV's completion of civils works, which first commenced back in 2023. With Stage 6 civils now awarded, Henley Brook by Cedar Woods is shaping up nicely as another bustling lifestyle community in Perth’s east.
24/06/2026
We have added a fourth fuel cell to our fleet with a 65,000 litre capacity.
The fuel cell is providing additional storage to manage uncertainty in fuel supply and ensure we remain fully operational in support of our clients.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
Perth, WA
6021
Opening Hours
| Monday | 8am - 5pm |
| Tuesday | 8am - 5pm |
| Wednesday | 8am - 5pm |
| Thursday | 8am - 5pm |
| Friday | 8am - 5pm |