StazFab Engineering
Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from StazFab Engineering, Engineering service, Darwin.
StazFab Engineering offers Welding, Fabrication, and Engineering services to all industries, with a focus on delivering high-quality, on-site support to keep your operations running smoothly.
09/05/2026
NP300 Tray Build - Reverse camera and all rear bar sensors incorporated into the tray, finished in gloss black. Enjoy Lachie
01/02/2026
Primary Jaw crusher hopper parent metal wall section replacement due to high wear. Huge prep, plenty of pre heat and a bucket load of welding for this 50mm thick billet of mild steel!
01/02/2026
Gooseneck heavy plant trailer in for some crack repairs, CNC plasma cut webbing fitted up and overplating welded out. Will be getting new lift cylinder mounts, pressed infill braces and a fresh coat of paint!
Banging out some aluminium maintenance deck frames on a wet season Sunday!
11/01/2026
Flat top trailer conversion with new headboard ready for blast and paint.
11/01/2026
New structural work and cat walk, designed, fabricated and installed by the crew out on a remote site.
This structure is designed to house a cone crusher control room, allowing our client to have all hydraulic power pack, electrical and crusher controller systems in an air conditioned control room right next to the crusher itself.
11/01/2026
Trailer headboard fabricated and tie down anchor points rotated 90 degrees as per client request, back from paint and looking schmick!
Flat knacker today with Wuttke’s PreciseWeld Fabrications
06/09/2025
JOB COMPLETE!
We’ve recently fabricated and installed a new Terex Caninca feed chute for a respected client.
The fabrication for this job entailed us to do our engineering whilst the fixed plant was still in use, this reduced down time for our client.
The chute was fabricated out of 8mm mild steel plate with a full Bisalloy 550 grade custom wear package with rock ledge shelving for a controlled rock flow and easy-to-replace liner package.
Removal of the old chute and installation of the new all went smoothly and we look forward to working with our client again.
Click here to claim your Sponsored Listing.