Provincial Building
Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Provincial Building, Construction Company, Bloomfield Street, Cleveland.
10/06/2026
Just released - with Three already SOLD and enquiries rolling in.
Solana presents 30 stylish and immensely spacious three‑bedroom residences. With timeless design, coastal tones, resort‑style amenities, and close proximity to both the water’s edge and parkland, LIFE’S BRIGHTER by the BAY.
Solana - 67-69 Shore Street East, Cleveland
Under construction with completion mid 2027
Enquire today: Adam Gray — 0418 708 661
10/06/2026
What's happening in June at Chapter - 2 Moore Street, Victoria Point 4165.
With construction now up to level one, the installation of reinforcement is underway ahead of the slab pour scheduled for next week, followed by construction of blockwork to form the Level 1 apartment walls.
Completion due early 2027.
Selling off the plan. Spacious 3-bedroom apartments. Enquire TODAY. Call Adam Gray on 0418 708 611
09/06/2026
Another Seven year Birthday Project- at Ascot Brisbane.
We broke ground on this Ascot project by first having to carefully relocate and restore a heritage-listed character home. Providing the room to build two new residences behind it, the development focused on combining heritage with contemporary living.
Still proud of the result. Time flies, but great projects endure with focus, care and quality.
Life really is brighter by the bay.
Liz Tilley takes a closer look at Solana, Cleveland - 30 oversized three-bedroom residences under construction on Shore Street East, designed for relaxed bayside living.
Under Construction | Completion Mid 2027
26/05/2026
https://www.solanacleveland.com.au/
Today’s the day. 🔥
Exclusive pre-release to the marketplace for those who have registered interest. 🏡✨
Be quick — opportunities like this won’t last long. ⏳🔑
Solana • Cleveland | 3-Bed Luxury Residences by the Bay 30 spacious 3-bedroom luxury residences in Cleveland, QLD. Featuring 250m² layouts, infinity pool, private amenity & bayside living. Construction underway.
18/05/2026
Coming soon - Solana - 67-69 Shore Street East, Cleveland
Solana presents 30 stylish and immensely spacious three‑bedroom residences. With timeless design, coastal tones, resort‑style amenities and close proximity to both the waters edge and parkland, LIFE’S BRIGHTER by the BAY.
Under construction with completion mid 2027
Enquire today: Adam Gray — 0418 708 611
15/05/2026
Project Update:
Construction is progressing well at Chapter Victoria Point. The ground slab is now complete, blockwork is progressing well, and civil works are continuing. Scaffold er****on has also commenced, with formwork to follow as the project moves into its vertical construction phase.
Discover "Chapter" at 2 Moore Street Victoria Point. 10 spacious 3-bedroom apartments.
Selling off the plan. Enquire TODAY. Call Adam Gray on 0418 708 611
15/05/2026
Chapter puts the emphasis on discerning quality and wonderful liveability by the bay.
You’ll love the peace and privacy, plus the easy accessibility to cafes, shopping, services, and bayside activities, just a short walk or drive away.
Just 10 spacious 3-Bedroom Apartments in the complex. NOW Selling off the plan. Enquire TODAY. Call Adam Gray on 0417 708 661
30/04/2026
Things are getting serious at Solana.
The crane is going up, slabs are locking in, and we’re officially heading skyward.
From plans to progress — this is where it starts to feel real.
24/12/2025
🚨 Coming Soon
10 Boutique Luxury Residences
Premium finishes • Elevated views • Unbeatable location
Next to shopping & lifestyle amenities
For any further information, kindly contact Adam Gray on 0418 708 661.
Click here to claim your Sponsored Listing.
Telephone
Address
Cleveland, QLD
4163