AMD Quality Constructions
Quality Builder of Award Winning Homes and Multi Residential . Multiple Awards Regional and State. National Finalist 2018 Master Builders Awards.
AMD combines a rigorous focus on outstanding construction with a dedication to superior client service. By listening to the needs of our clients and tailoring our skills to match these needs, we demonstrate the ability to understand and implement fully the scope of any project. Drawing from our vast experience of over 20 years, AMD is uniquely qualified to tackle even the most complex of projects.
15/06/2026
The final details are coming together at EUCA.
Exterior finishes are wrapping up and inside, the fit-out is in its final stages. These are the moments where months of work start to reveal themselves.
A few weeks out from completion. Watch this space.
📸
•
•
•
MEET THE TEAM | RYAN
Nearly two years with AMD and Ryan hasn’t looked back.
A carpenter by trade, his days on site range from framing to fixing out, detailed, hands-on work that suits someone who takes pride in getting it right. That interest started back in school woodwork classes and never left.
Good mates on site and high-end work to show for it. That’s the AMD way.
🎥
•
•
•
BLANCA | SITE UPDATE
Tylor takes us on site at BLANCA for the latest progress update.
Since the last visit, the team has completed the blockwork and core filling. Formwork is now being installed in preparation for the next level, with steel reinforcement scheduled to be brought in and laid across A, B, C, and D layers before the concrete pour follows.
The build is moving forward, stage by stage.
Meet the Team | Harry
Harry has been with the AMD team for just over a year, working across everything from framing through to concreting.
What he enjoys most about the role is the variety, no two days on site are the same, with each stage bringing a different challenge and pace.
Drawn to carpentry for the challenge that comes with the trade, Harry takes the most pride in his consistency, work ethic, and showing up every day ready to get the job done.
And for anyone wondering, he’s firmly team Makita.
🎥
Planning For Progress | AMD Constructions
Progress on site starts well before construction begins.
With active projects across Cleveland, Stradbroke Island, and Upper Mt Gravatt, AMD intentionally manages builds at different stages to keep internal teams and subcontractors moving efficiently across all sites.
Every project begins with a detailed site review led by key team members, assessing access, logistics, and overall buildability. From there, the office team works through front-end planning and design coordination to map out how the project will run.
Strong delivery comes from strong planning, setting each site up properly from day one.
•
•
•
06/05/2026
Congratulations to Harry on completing his apprenticeship. Well done mate, amazing effort and dedication 💪🏻 Welcome to the tradie club 🎉 🔨
BLANCA | MAJOR MILESTONE
Another major milestone on site at Blanca, with the team pouring the podium deck.
Using a dual pump setup, the crew is working efficiently to complete one of the key structural stages of the project. With the basement poured in recent weeks, attention has now shifted upward as the build continues to take shape.
Completion of the podium deck creates the platform for the next stages ahead, allowing the project to move forward with strong momentum.
🎥
•
•
•
Safety On Site | AMD Constructions
High-risk tasks on site require more than experience, they require planning, control, and the right people in place.
For major lifts and complex operations, full traffic management may be implemented to safely manage surrounding access and lane closures when required. During works such as tower crane installation, site access is restricted to essential personnel directly involved in the task.
Appropriate PPE remains mandatory for everyone on site, with dedicated team representatives overseeing operations to ensure works run safely and efficiently.
Safety isn’t a separate step in the process, it’s built into every stage of the job.
🎥
•
•
•
EUCA | Stradbroke
No matter the conditions, the work continues.
A different look at EUCA - overcast skies, light rain, and the cantilever pool leaning seamlessly into the horizon of the ocean.
🎥
•
•
•
Click here to claim your Sponsored Listing.
Category
Contact the business
Address
4157
Opening Hours
| Monday | 7am - 5pm |
| Tuesday | 7am - 5pm |
| Wednesday | 7am - 5pm |
| Thursday | 7am - 5pm |
| Friday | 7am - 5pm |