Walter Johnson HS Modernization,an ABC Metro Washington & VA Award Prj

Walter Johnson HS Modernization,an ABC Metro Washington & VA Award Prj

Congratulations to Henley Construction Co. Inc., on their 29th Annual Metropolitan Washington Excellence in Construction Award: "Institutional (over $30 million)" for the Walter Johnson High School Modernization project.

Project Details: The Construction Management (CM) Contract for the modernization of the existing portions of Walter Johnson High School for Montgomery County Public Schools (MCPS) was the fourth and largest in a series of five (5) separate contracts partnered between Henley Construction and MCPS over a ten (10) year period to fully modernize the complete school campus. The project is located at 6400 Rock Spring Drive in Bethesda, Maryland. A $17M classroom wing addition and renovation of the existing Media Center and Cafeteria/Kitchen was completed by us on a hard bid GC contract back in 2001-2002. Due to the success of the earlier project, MCPS asked us to return in 2006 as Construction Manager for a $7M renovation of the existing Auditorium, which was recognized with an ABC Award of Excellence in 2007. During the summer of 2007 we were tasked by MCPS with a $1.7M CM contract to install 45 portable classrooms around the site that were used to temporarily house staff and students during the $52Million phased Modernization CM contract. Building demolition and concrete work started on a fast track basis in June 2007 while full and final design drawings were rushed to complete and issued out for trade bids in September 2007. Formal Notice To Proceed on the Modernization contract was issued by MCPS in October 2007 covering no less than six (6) distinct and separate phases, with the last section securing final building occupancy in January 2010. A separate $7M Site Improvements Package CM contract covering the renovation of the surrounding parking lots, ballfields, and football stadium/grandstands is still ongoing and scheduled to wrap up in August. The largest challenge encountered that we struggled with the most, other than working in and around a fully operating school campus, was that due to the fast track nature of the project and push by MCPS to get started, the bid documents were never fully completed and a lot of what was actually constructed, particularly on the MEP portions, is substantially different than what we started out with, which was a testament to the abilities of our major trade subcontractors involved – Heller Electric Co, Inc., Shapiro & Duncan, Inc., Halac Iron Works, Inc., CanAm Drywall, and George Moehrle Masonry Co., Inc.

Congratulations to Henley Construction Co. Inc., on their 29th Annual Metropolitan Washington Excellence in Construction Award: "Institutional (over $30 million)" for the Walter Johnson High School Modernization project.

Congratulations to Henley Construction Co. Inc., on their 29th Annual Metropolitan Washington Excellence in Construction Award: "Institutional (over $30 million)" for the Walter Johnson High School Modernization project.

Walter Johnson High School Modernization

©2010 Judy Davis/Hoachlander Davis Photography, LLC
Washington DC USA Ph: 202/364-9306 All Rights Reserved.

Walter Johnson High School Modernization

Walter Johnson High School Modernization

Want your school to be the top-listed School/college in Bethesda?

Click here to claim your Sponsored Listing.

Address


6400 Rock Spring Dr
Bethesda, MD
20817
Other High Schools in Bethesda (show all)
Bethesda-Chevy Chase High School Bethesda-Chevy Chase High School
4301 East-West Hwy
Bethesda, 20814

Rochambeau Start-Up Week Rochambeau Start-Up Week
9600 Forest Road
Bethesda, 20814

La Rochambeau Start-Up Week se déroulera entre le 12 et 16 juin. Durant cette semaine, les élèves de secondes créeront par petits groupes des entreprises.

Walter Johnson High School Walter Johnson High School
6400 Rock Spring Dr
Bethesda, 20814

Lycée Rochambeau Lycée Rochambeau
9600 Forest Rd
Bethesda, 20817

Holton-Arms School Holton-Arms School
7303 River Rd
Bethesda, 20817

Founded in 1901, Holton-Arms is a college-preparatory school for girls grades 3-12 dedicated to the “education not only of the mind, but of the soul and spirit.”

Whitman Drama Whitman Drama
7100 Whittier Blvd
Bethesda, 20817

Founded in 1962, Walt Whitman High School's drama program is award winning and internationally recognized.

WJ High School WJ High School
Bethesda, 20817

Quince Orchard HS Class of 1996 Reunion Quince Orchard HS Class of 1996 Reunion
7940 Norfolk Ave
Bethesda, 20814

QOHS Class of 1996 20th year reunion Tommy Joe's 7940 Norfolk Avenue Bethesda MD 20814 Saturday May 14, 2016 6:30pm-10pm

Elaa Foundation Elaa Foundation
Bethesda, 20814

Elaa Foundation is a non-profit with a mission to educate minority students through global exposure and financial literacy

Lycee Rochambeau Lycee Rochambeau
Bethesda, 20814

Black and White (newspaper) Black and White (newspaper)
Bethesda, 20817

Walt Whitman High School Athletics Walt Whitman High School Athletics
7100 Whittier Blvd
Bethesda, 20817

The Official Home of Walt Whitman High School Athletics. Bethesda, MD